ML20091L045
| ML20091L045 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/23/1995 |
| From: | Stone J NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20091L049 | List: |
| References | |
| NUDOCS 9508280279 | |
| Download: ML20091L045 (7) | |
Text
-
p >*LE:vq i*
s p
t UNITED STATES NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2005H001 Ny***.*4$
PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-275 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 107 License No. DPR-80 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pacific Gas and Electric Company (the licensee) dated June 29, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Ccmmission; 9
C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
9508280279 950823 PDR ADOCK 05000275 P
- = -
a (2)
Technical Soecifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 107, are hereby incorporated in the license.
Pacific Gas and Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in i
specific license conditions.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION 2
JY
^
$/M James C. Stone, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV l
Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 23, 1995 t
4 s-
- ' "4e p
4 UNITED STATES j
j NUCLEAR REGULATORY COMMISSION o
WASHINGTON, D.C. 20856-0001 s,...../
PACIFIC GAS AND ELECTRIC COMPANY DOCKET NO. 50-323 DIABLO CANYON NUCLEAR POWER PLANT. UNIT NO. 2 I
AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 106 License No. DPR-82 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Pacific Gas and Electric Company (the licensee) dated June 29, 1995, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and 1
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
-g-(2)
Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.106, are hereby incorporated in the 4
license.
Pacific Gas and Electric Company shall operate the i
facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment is effective as of its date of issuance.
j FOR THE NUCLEAR REGULATORY COMMISSION
?
C e$/
James C. Stone, Senior Project Manager Project Directorate IV-2 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 23, 1995 4
1
(
1 I
j 2 o i
i ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.107 TO FACILITY OPERATING LICENSE NO. DPR-80 AND AMENDMENT NO. 106 TO FACILITY OPERATING LICENSE NO. DPR-82 DOCKET NOS. 50-275 AND 50-323 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by Amendment number and contains marginal lines indicating the areas of change.
The corresponding overleaf page is also provided to maintain document completeness.
REMOVE INSERT 3/4 4-8 3/4 4-8 j
1
{
i e
s 3
l 4
4 i
h
- o i
)
4-l 1
i i
4 J
d-d i
t r
l e
1 i
1 r
This Page Intentionally Deleted j
i i
l e
a
?
I 1.
J i
1.
.f
.(
f l
L i
I i
DIABLO CANYON - UNITS l'& 2 3/4 4-7 Amendment Nos. 98 & 97 f'
f t
f a
l l'
REACTOR COOLANT SYSTEM OPERATING
[
LIMITING C00EITION FOR OPERATION 3.4.2.2 All pressurizer Code safety valves shall be OPERABLE with a lift setting of 2485 psig i 1%.*
APPLICABILITY: ' MODES 1, 2, 3 and 4.#
l l
ACTION:
a.
With one pressurizer Code safety valve inoperable, either restore the inoperable valve to OPERABLE status within 15 minutes or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN with i
all RCS cold leg temperatures less than or equal to 270*F within the l
following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
3 b.
The provisions of Specification 3.0.4 may be suspended for up to 18 1
hours per valve for entry into and during operations in MODE 3 and 4#
for the purpose of setting the pressurizer Code safety valves under ambient (hot) conditions provided a preliminary cold setting was made prior to heatup.
i f
SURVEILLANCE REQUIREMENTS 4.4.2.2 No additional requirements other than those required by l
Specification 4.0.5.
j i
l i
- The lift setting pressure shall correspond to ambient conditions of the valve at nominal operating temperature and pressure.
- When all RCS cold leg temperatures are greater than 270*F.
l B
i DIABLO CANYON - UNITS 1 & 2 3/4 4-8 Unit 1 - Amendment No. 10,72,00,107 Unit 2 - Amendment No. ?O,71,07,106
-