Monthly Operating Repts for Dec 1991 for Catawba Nuclear Station Units 1 & 2
ML20091K220
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/31/1991
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20091K215 List:
References
NUDOCS 9201230182
Download: ML20091K220 (10)


Text

_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - _ - _ - _ _ _ _ _ _ - - - - - - - -

i j

vt. 1991 . LA,1 -- AVIRABEDAILYf0WIRltVIL-81 AviRAGE DAltf POWER LtVEL (Mr-Net) .(r,We Nat) l-1125 17 1163 'till 18 1140 3-t11L 19-1142 4-1163 20 IL43 5 1141 21 1160 6-1142 22 1139 7 -l141 23 !!37 $l 1139 E4 1140

9-1132 25 1142-

'80. 1131 ' R6 1144 - 1140 27 1145 12 '. 1179 29 1122 13 l@ ~29 1146 141 1134-30 !!45 - !$ i 1146-31= 1145 m .n- UNIT SHUTDOWNS AND. POWER REDUCTIONS DOCKET NO. 50-413 ' I UNIT NAME CATAw tsA 1 1 CATE u A/ A of v2 REPORT MONTH-December 1991 COMPLETED BY s. w. rivdt.x - TELEPHONE (ev4)->eJ-di54 (2 (3) (4) (5) (1) R') 1%ET-i E HOD T. A. OF LICENSE N Y S SHUT EVENT SYS-CAUSE AND CORRECTIVE 4 O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO 4 DATE .E HOURS N R/X NO. CODE CODE PREVENT-RECURRENCE NO SHUTDOWNS OR ' REDUCTION S 1 4 1 i Forced eason-ethod: ibit G - Instructions i S Scheduled A-Equipment Failure (Explain)' 1-Manual for Preparation of, Data B-Ma2ntenance or-test 2-Manual Scram Entry Sheets For Licensee 4 C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restrictior,1 4-Other (Explain) File (NUREG-Ol61)) E-Operator training & License Examination F-Administrative (5) l G-OpJ1er (Explain) (Explain) rator Error Ex.hibit I - Same Source H-O i I i l-t c-n. ,--,.s .,e .w~ ~. - m we-.-. v w -e w ., -, e m-... 4 4 DOCKET 140:- 50 'A 3 Uti!T: Catawba 1 DATE: 1/15/92 j NARRATIVE

SUMMARY

MONTil: December 1991 Catawba Unit 1 began the month of December operati"6 at 100% full power.

l.

The unit operated at or near 100% full power for the entire month, and ended the month operating at 100% full power.

i l

l

}

i a

l i

Prepared by:

S W, Moser Telephone:-

704 373-5762 I

i

- ~ '

i l

I MO!3TilLY REFUELING INFORMATION REOUEST 1.-

Facility.name =Catawbn.

Unit i 2.

Scheduled next refueling shutdowns June 1992 l

3..

Scheduled restart following refueling _Anggat 19R2 f

Tile PROJECT MANAGER llAS DEEN ADVISED BY SEPARATE COMMUNICATION OF

[

ANY T.S.

CHANGE OR LICENSE AMENDMENT.

Tl!EREFORE, QUESTIONS 4 Ti!ROUGli 6 WILL NO-14HGER DE MAINTAINED IN TilIS REPORT.

4.

Will refueling or resumption of oporation thoroaf ter require a technical specification change 6 thor-liconso amendmont?

If yes, what will theso bo?

f If no,-has roload design and core configuration boon reviewed by Safety Roview Committeo rogarding unroviewod safoty questions?

5.

Scheduled dato(s) for submitting proposed licensing action and t

supporting information.

G.

Important licensing considerations (now or difforont design or

supplior, unroviewod design or performanco analysin
methods, i

significant changes in donign or now operating proceduros)'.

.7.

Number of Fuol assemblics (a) in the coro: 122 (b) in the spent fuel pools nn 8.

Procent licensed fuel pool capacity: 1410 Size of requested or planned increases -

'9.

Projected dato~of last refueling which can be accommodated by proaant licensed capacity: September 200.2 DUKE POWER COMPANY DATE Janunry 15, 1991 Name of

Contact:

R.

A. Williams Phone:

704-373-5987

..,.memme.~w.1---m--*

-,u

,.e.,

e,-e.+c.-..

_.- -,.m m,e-m, y.

..,-n 2-r

,,-_w,ymn.c.

o+

,yr--,y-,..--.w.

e.wm m--

-.-w.r_.-.,

,-...-,-,,.-,---w-v,

f 7

-j Ot[FAllNGOATAPIPORI i

s 00CrtiNO

$F414 DAlt J o ur y 15 )]! L,

4 DPRAtlNGltATL3 COMPLiftDFV P.A. Williat t TELEPHONE 704 37 M 987

[

1.UnniNase Catavu 2 t.ReportlegFetted:Dettsber1,1991Detener 31,1991

3. Licensed thereal fswer Mth 3411
4. Nurplate Rating (Grtss NWeh _

13056 Notes #Naseplate Fating j

5.DesignElettricalRating(hetPWeh 1145 16rtstMWelcalculatedas

+

6. Matisu Dependdle Capacity (Stoss Neti

.1192 14$0.000MVA 90 preer i

'7.fanitLaPependdleCapatity(NetMWeh (129 fatter per Fage lit, t

c 8.1f Changes Occur In _ Capacity Ratings (!tras Wuster 1 Through 7) Sir:te Last NLlhE60020.

Feport.GiveReascott

[

9. Powerlevel to Which Restricted, if Any (Net NWelt
10. Reason for Restrictions, If any:__

j i

i this Menth fr -to4ste Cusulative It'. Hours in Reprting feriod 744,0 8760.0 47065.0

12. Number Of Hours Reactor Was Critical.

ER9 6699.6 34297.6 13.ReactorReserveShutdownHours "0"'

~0--.[

14. Hcars 6erierator On-Line 200.0 6622.2 33563.2 15.UnitReserveShutdounHours ~0~ i
16. Cross Thersal (nergy 6enerated MW) 4B0747 21757097 105126177 l

117.GrosstjectricalEnergyGenerated(MWH) 169212 7712400 37175905 10.NetElectricalEnergyBenerated(MW) 166759 7271256 -

34BDB69 19.' Unit Service factor.

26.9 75.6 11J I

'20.UnitAvailabilityF_atter 26.9 75.6.

71.3 21._ Unit Capacity f4Clor (using G C Net) 17.5 73.5 65.4

)

22,UnitCapacityfatter(UsingDERNet) 17.2 72.5 64.7 23.-UnitforcedOutageRate'

~

24. Shutdown Scheduled Over Not 6 Maths (Type, Date, and Duration of Eachh

' 14 6 6.6-13.1 L

-l None 3

. 25. If Shut Down At'End of Report terled.- Estiaated Date of Startop L 26. Units in Test Status (Prior to Cosatrcial Operationh -

Fort *ast_

Achieved q

r L

INiilALCRii!CAllIY INiilALELitiRIClfy

~

~

COM:'ERCIAL OfGATION 1

l t

l-l-

t L

- _. a _.

,,....~.,_.&,._.,_.._____.c___.-..._,.____._.,-_.

_,____.a

't-L P

4 4

e OtUAlthB IATA pit 0Fi i

t i

D0Ctti WD 50 414- _

i M11 tilhtLL._.

i 14f t lipnyuv 15.1991_

COMPT (1[0Bf_ RA.Wijjitti i

illUHONE 704373-$997

-l GMtH

'fer.nttt 1991 i

i

_ QLY AVIRA$tDAILY(0WERLEVIL LA1 AV(AACE DAILY (MR Livil i

(MWe Net)-

(MWt Net) i 1

0 17 0

f 2'

0 IB 0

f 3

_0 19 0

.h 0

to 0

5 0

21 0

~6 0

22 0

l 7-

-0' R3 0

I 8

0 24 Pip l

9 0'

E5 400 I

e 10 :

0 26 693 i

i 11 0

27 731 12 :

~0 IB 1009 3

13 0

29 114P

'14 0

30 1159 t

i 15.

0 31 1158 16 0

1

'l-!

. - -. _.. _,. -.,,. _.. _,... _ _,. _ _ _. _ _ _.. _ _ _ _... _ _,.. _.,.. _,.. _.. - _...., _, _.,.. _.,,,,_ l.?

.~.,, -..

t e

I l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414

)

UNIT NAME CA1AwuA z

?

DATE uk/Lufvz l

{

REPORT MONTH Dece:d>er 1991 COMPLt'itu BY s.

w.

rivdtx i

TELEPHONE t/UM -> U->4bi l

(4)

(5)

(1)

{2) j.

E HOD l

T A

OF LICENSE W

Y S

SHUT EVENT SYS-

. CAUSE AND CORREulvt-O P

DURATION O

DOWN

' REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO, CODE CODE PREVENT RECUPRENCE 8

91 1 5

507.57 C

1

-RC FUELXX END-OF-CYCLE

'4' REFUELING OUTAGE

+

17 91-12-22 F

34.28 A

HH VALVEX-LEAKING AUXILIARY tLtuRATER VALVE 10 91-12-23 S

2.18 B

3 HA TURBIN TURBINE OVERSPEED TRIP TEST i

14-P 91-12-24 S

B RC EVELXX CORE FIUX MAPPING l

15-P

'91-12-25 S

B HH INSTRU TURBINE / FEEDWATER CCNTROL TESTING f

i 16-P 91-12-25 F

HH TURBIN

'2A' FEEDWATER FUMP TURBINE PROBLEMS A

17-P 91-12-26 F

A HH INSTRU IDSS OF FEEDWATER PUMP TURBINE DUE f

l.

TO LOSS OF DC CONTROL POWER

'18-P 91-12-27 F'

A HH INSTRU HOLD DUE'TO TURBINE RUNBACK ALARM I

i i

19-P 91-12 S B

RC ruEtXX CORE FLUX MAPPING e

t

! (1)

[

(2)

(3)

(4)

}

F Forced Reason:

Method-Exhibit G - Instructions i

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of,Dats

[

i B-Maintenance or test 2-Manual Scran Entry Sheets For Licensee C Refueling 3-Automatic Scram Even Report (LER i

D-Regulatorv Restriction 4-Other (Explain)

File (NUREG-Ol61))

t E-Operator Training & License Exanination

?

F-Administrative (51 G-Opdier (Explain)(Explain) erator Error r.xhibit I - Same Source

{

H-O l

t E

i-i I

i f

I

t I

DOCKl:T NO:

$0 414 UNIT:

Catawba 2 i

DATE:

1/15/92 NARRATIVE

SUMMARY

i MON 1ti:

DoW nber 4991-Catawbs Unit 2 began the south of December a. hut down for its end of.

cycle4' refueling outacc. The unit was placed on.11ne at 1351 on 12/23 to end the refueling out age. - The uutt was tripped back off 11oo at 2059 on 12/2"8 for tlw turbine overspeed trip tent,- At,2310 on 12/23, the unit was placed back on line, and-a power increase-was l

begun.. The unit was held at approximately 204 power from 0810 to 1024 l

on 12/24 for core flux napping, at approximately 304 power from 0100 to 0550 on 12/25 for tuxbine/feedwater control testing, and a';

approximately $04 powter from 1104 on 12/25 to 0030 on 12/26 due to '?A' feedwator pump turbino problean. Tbc unit was then held at approxiv,ately 604 power from 0400 on 12/20 to 1020 on 12/27 due to the loss of a feedwater pump turbine on loss of DC control power, At 1033 on 12/27..the unit vna huid at approximately 624 power unt.fil

- 1$42 on:12/27 due te A [4180 turbine ruDbach 4) Arm, The unit was Dex(,

held at approximataly 754 power from 2245 on 12/27 to 0450 on 12/28 for core flux mapping.

The unit reached 1006 full power at F943 on 12/28, and operated at 100% full ower for the remainder of the month.

r

~?

t i

b t

c Prepared by:

S. E donar

.. Telephone:

704 373 5762 f

i

-, u ;_-,,, A,,_,,~- w u,...._a.,_-~.___,,--...---.-.-,,,..,,-,4-c.-,,--.

w

/~.-

1 liq 11T11LLign!ELING INPQBMATION igQUEST 1.

Facility namos catawhn,_UJ)1tj 2.

Scheduled next refueling shutdowns January _,J122 3.

Scheduled restart following refueling: April 1993 Tilt PROJECT MAllAGER !!AD DEElf ADVISED BY SEPARATE COM!4UNICATION 01 ANY T.S.

CilANGE OR LICEllSE AMENDMENT.

TilEREFORE, QUESTIONS 4 THROUGli 6 WILL NO LONGER DE HAINTAINED IN TilIS REPORT.

4.

Will refueling or renumption of operation thoroaf ter require a technical specification change or other licenso amendment?-

If yes, what will those bo?

If no, has roload donign and coro configuration boon reviewed by Safety Rovjew Committoo rogarding unroviewed safoty questionn?

,5.

Scheduled date(n) for submitting proposod licensing action and supporting-information.

f 6.

Important licensing conaldorations (new or different donign or

supplior, unroviewed design or performance analyain
methods, significant changes-in donign or new operating procoduros).

7.

Number of Puol assemblion (a) in the coro: 121 (b) in.tho spent fuol pool:-10,Q 8.

Present ' licensed fuel piool capacityi Alla Size of requestod or planned increases -

9.

Projected date of last refueling which can be accommodated by 4

present licensed capacity: Eentember 2011 DUKE POWER C011PANY

'DATE:

January 15. 1991 1

Nano of

Contact:

R._ A. WilligJng Phonet 704-373 DSS.L i

'ii g

'i g.

IJ I

l l-r

+

_. _. ~. _. _, _ _. _, - _.. _. -.