Monthly Operating Rept for Dec 1991 for Grand Gulf Nuclear Station Unit 1
ML20091K149
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 12/31/1991
From: Cottle W, Daughtery L
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9201220244
Download: ML20091K149 (6)


Text

_ _ _ ~ _ _ _ _ _ _ _ -

a Entergy Operations,Inc.

i M a si i l

0n.

. _. _ _ _ ~.. _ _ _

W. T. Cottle January 14. 1992 U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C.

20555 Attention:

Document Control Oesk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Monthly Operating Report GNRO-92/00003 Gentlemen:

In accordance witii the requirement of Technical Specification 6.9.1.10, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for December 1991 (attachment).

If you have any questions or require additional information, please contact this office.

Yours truly, w ymum.,

WTC/TKM/cg attachments: 1.

Operating Statas 2.

Average Daily Power Level 3.

Unit Shutdowns and Power Reductions cc:

(See next page)

i 1

M00PDEC l

9201220244 911231 i

PDR ADOCK 05000416 7 6.2. f R

FDR g

January 14, 1992 GNRO-92/00003 Page 2 of 3 cc:

Mr. D. C. Hintz (w/a)

Mr. J. L. Mathis (w/a)

Mr. R. B. McGehee (w/a)

Mr. N. S. Reynolds (w/a)

Mr. H. L. Thomas (w/o)

Mr. Stewart D. Ebneter (w/a)

Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. P. W. O'Connor, Project Manager (w/a)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C.

20555 t

L-

_ r., _-__. - - - _ _ _., _,._

._m

~

-January l14; l992'-

GNRO-92/00003 Page 3:of.3-bec -

Mr.-P. E. Albertstadt (ECH/412) (w/a)

Mr. C. A. Bottemiller (w/a)-

Ms. V. S. Brown

/a Mr. S. A. Burris(w(w/a)

Mr. R. W. Byrd (w/a) )'

Ms.T.'Covington(GE).(w/a)

Mr.= L. F. Daughtery (w/a)

-Mr. M.-A. Dietrich (w/a)

Mr. J. L. Ensley _(ESI) (w/a)

Mr. J. 'J. Fisicaro-(ANO)- (w/a)

. Mr. J. O. Fowler (w/a) L Mr. C. R. Hutchinson (w/a)/a)

Mr. L. W -Laughlin (W3) (w

-Ms. F i-K.~ Mangan-(w/o)

Ms.M.B.sMarkow(ECH/57)(w/a):

- Mr.L J.-~ R.:- McGaha -(w/a)

Mr. M.~:J. Meisner (w/o) p Mr. R. V.,Moomaw w/a) 1 Ms. T. K._Murray w/a

-Ms. C. L.-Muse (w a) )

.Mr. 0/ L.= Pace (w/a)

LMr. R.-L. Patterson (w/a)

Mr.T.:E.> Reaves-_(w/a)/a)

Mr. J. L. Robertson (w Mr. M. J. Wright-(w/a)-

- Mr.;G'A.-Zinke-(w/a)'

File: LCTS) w/2)

File RPTS) w/a)

File NL) -(w a)

-File Central)_(w/a)_(I:7 - )

INP0 Records: Center ~(w/a):

- Suite 1500 1100. Circle--75 Parkway Atlanta, Georgia L30339' Mr._ Marcus Ware (w/a):

Manager of Production South Mississippi Electric Power Association 4

P.O. Box.15849-Hattiesburg, MS 39401

,Mr. Fre'd Yost>

Director Research-Services-Utility Data Institute 1700 K Street, N.W.

~5uite 400

~

sWashington, D.C. 20006 4-

M00PDEC d-w g

9 y

iy-p iy., -

'r-ry we p

--m

--r--'y

=+w'eM

'+d-e-+

+dN--

.~

AttachmentL1 to GNR0-92/00003-00CKET NO.

50-416 DATE 01/07/92 COMPLETED BY L. F. Daughtery TELEPHONE (601)4T/-2334 OPERATING STATUS-

- 1.

Unit Name GGNS UNIT 1 Notes:-

2.-

Reporting Period: -- December-1991 3L Licensed Thermal Power (MWT :- 3833 MWT c 4.-

Nameplate Rating (Gross MWE : TD2.5 MWE 5.

Design Electrical. Rating (Net RWe): 1250 MWE 6.

Maximum Dependable Capacity Gross MWe): 1190 MWE

- 8.

If Changes Occur in Capacity Ratings)(Items Number 3 Through 7) Since-Last-Report.

7.

Maximum Dependable Capacity Net MWe : 1143 MWE Give Reasons:

N/A-

'9.- Power Level-To Which Restricted,'In Any (Net MWe):

h/A

-10.. Reasons;For Restrictions,.'If Any:

N/A l'

This Mon _h Yr to Date-Cumulative t

744 8,760-63,032 11.: Hours'In Reporting Period 694 8,230.3 50,19f.T 12.l Number of Hours Reactor Was Critical

13. Reactor Reserve Shutdown Hours

'O O

O 114. Hours Generator On-Line 594 8,036.7 48,050.4 f!

15.. Unit-Reserve Shutdown: Hours 0

0 0-D

-16.2 Gross-Thennal: Energy. Generated.(MWH) -

2,602,303 29,815,113 165,723,184y 17'GrossElectricalEnergy. Generated (MWH).

832,426

-9,506,596 52,570,110--

18." Net Electrical--Energy Generated'(MWH) 799,195 9,118,716 50,260,715 4

19., Unit Service Factor 93.3 91.7 78.9 L

20. L'ait Availability Factor-93.3 91.7 78.9
21. Unit Cipacity Factor _(Using MDC Net ;

94.0 91.1-75.0-

23.: Unit Forced Outage Rate 6.7 8.3.

68.0-

22. Unit Capacity Factor (Using DER-Net :

-85.9_

83.3 6.5 L24.1 Shutdowns Scheduled Over Next-6 Months (Type, Date, and Duration of Each):

Begin'Refuelino Outage --5-on 04/17/92 for an estimated duration of 46 days.

h: 125. If Shut Down At Eht of Report Period.' Estimated Da#

af Startup:-

NA s

L i26. Units In Test Status-(Prior to Commercial.0peration).

ln

[.

Forecast Achieved p

08/18/82

-INITIAL CRITICALITY INITIAL-ELECTRICITY 10/20/84 COMMERCIAL OPERATION

-07/01/85 L

L I

.M00PDEC/SCMPFLR

=-

$ to'GNRO-92/00003 DOCKET NO.

50-416 UNIT 1

DATE 01/07/92 COMPLETED BY E. F. Daughtery TELEPHONE B01-4T7-2334 MONTH. December 1991 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-(MW6-Net)

(MWe-Net) 1 1152.9-17 1168.8 2

1118.4 18 1168.4 3

1198.6 19 1172.7 4

1199.6 20 1135.4 5

1195.1 21 811.2 6

1188.5 22 1119.3 7

1170.5 23 1170.0 8

1176.0 24 1193.0 9

1172.4 25 1196.4 10 1182.3 26 1188.1 11-1175.8 27 1172.4 12 1163.4 28 1184.9 13-

, 1165.2 29 818.5 14=

1183.1 30 0

15 1197.3 31 0

16 1193.4 l

l M00PDEC/SCMPFLR

~.

-

  • toGNRd-92/00003

~

^

UNIT SHUTDOWNS AND POWER REDUCTIONS

~

DOCKET NO.

50-416 UNIT NAME 1

DATE 01/07/92 COMPLETED BY L. F. Daughtery TELEPHONE 601-437-2334 REPORT MONTH' December 1991 l

l l_

l Shutting'Down!

Event l System lCompcnent l Action To l

Method of i Licensee l l

l Cause & Corrective l

l No.-l Date l Type Duration Reason l l'

l (1)-

Hours

-(2)

Reactor l Report #

l Code l

Code l

Prevent Recurrence l

l l

l l

(3) l (4) l (5)

(C&CA) l I

91-12/21/91 S

53 l

'B 5

N/A N/A N/A Rx thermal power reduction to l

013 l

l l'

1 lapproximately 60% for control rod'l l

l l

l l

L l sequence exchange.

l l

1 1

l l

91-12/29/91 ;

F l

10 A

l 5

[

N/A N/A N/A l Reduced power to cold shutdown forl 1014 l

l jforced shutdown to replace kecirc,

l l

l l

l l Pump 'B' shaft.

[

1 I

I I

l

. 12/29/91!

F 50.0 l A

l 5

l N/A l

AD l

P l Forced shutdown for Recirc Pump l

!91-015 l

l l

l l

l'B' shaft replacement l

l 1

l l

1 l

i l

l

.I I

I I

I UNIT SHUTDOWNS AND POWER REDUCTIONS 1

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure 1-Manual for Preparation of Data (Explain) 2-Manual Scram Entry Sheets for Licensee B-Maintenance or Test 3-Automatic Scram Event Report (LER)

C-Refueling 4-Continued File (NUREG-0161)

D-Regulatory Restriction 5-Reduced load E-Operator Training &

6-Other Licensing Examination F-Administrative 5

G-Operational Error Exhibit 1-Same Source (Explain)

H-Other (Explain)

M00PDEC/SCMPFLR