ML20091K129
| ML20091K129 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/13/1992 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9201220131 | |
| Download: ML20091K129 (1) | |
Text
-" ?
-. +
4.
l l
+p 1
+
n,, nw,.
AhGuire VudewStation 1-
!!hm Hqrts ferry Road
\\
y>
[ Honterintie SCN0h.m3 SATGUARDS E01MC03 L^
DUKE POWER f,
FROTECllVE MARKING CANDELED January; 13,-1992' g.M EPWTED M i
ATTACHMENT l
1 l
p U. S.cNuc. lear Regulatory Commission ATTNr Docunent Control Desx Washington D~
C.
20555
- s
Subject:
McGuire Nuclear StutLon Docket Hos. 50 369, -370
. Physical-Security Plan, Rev. 44
- l. -
Safeguards Contingency Plan, Rev. 7 Gentlement As requirtid by 10.CFR 50.54(p), enclosed are four (4) copies-of.the McGuire Physica?. Security Plani (Rev. 44 Additional Pages) and SafeguardscContingency Plan (Rev. 7 Additional Pages). 'Tho pur, pose ofLthese additional pages is minor-p
=clarlfications of the revisions submitted December 23, 1991.
Primarily, this~ change results in insertion of additional text regarding the Cargo-Access Portal and'the annual yi j,,.
security' program audit.
These plan revisions:do not dac % e +he-effectiveness of;the-Physical' Security Plan or Safeguards Contingency Plan.
-Since this information provides details'of-the' physical protection system at McGuire Nuclear Station, I request that this~1nformation'be' withheld from public disclosure in-accordance with 10 CFR 73.21.
t b
yth/
-T. C. McMeekin L
McGuire Site Vice President xc: S. D.
Ebneter Regional Administrator, Region II n00()& (w/2 Copies of Attachmentsi j
L'i 9201120131 920113 14 PDR ADOCK G3OOO369
'I e
<~m F