ML20091J783

From kanterella
Jump to navigation Jump to search
Forwards Part I of Piping Design Review, & Part Ii,Vols 1 & 2 Piping Design Review, Final Rept.Part I Describes Overall Program,Consultant Observations & Generic Implications.Part II Is Consultant Detailed Review
ML20091J783
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/29/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20091J786 List:
References
NUDOCS 8406060189
Download: ML20091J783 (1)


Text

.

s H E C L E V E lli ti b E E C T !? l: lLLUici !. , T; :a t P.o. box 5000 - CLEVELAND, oHlo 44101 - TELEPHCNE (216) 622-9800 - ILLUMINATING OLDG.

MURRAY R. EDELMAN

- 55 PUBLICSOUAHE Serving The Best Location in the Nation VICE PRESIDENT NUCLEAR May 29, 1984 PY-CEI/NRR-0117 L Mr. B. J. Youngblood, Chief

' Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20555 Perry Nuclear Power Plant, Units 1 & 2 Docket Nos. 50-440; 50-441 Piping Design Review

Dear Mr. Youngblood:

This letter is to provide you with a copy of the final report on the Piping Design Review program. This program was discussed with the NRC staff on March 12, 1984 and in our April 5, 1984 letter (PY-CEI/NRR-0103 L).

The piping design review program was undertaken as one element of the overall Design Verification ef fort. This final report consists of two parts.

Part I describes the overall program, CEI's review of the consultant's (Cygna Energy Services) observations and our evaluation of generic implications. Part II is the final report of the consultant's detailed review of selected piping systems. (Volumes 1 and 2).

Based on this combined review eifort, and the resulting programs that are underway and being tracked to resolve the observations and generic concerns, CEI believes that the mechanical design adequacy at the Perry Nuclear Power Plant is assured.

We hope that this information is helpful in the development of any initiatives you may plan. If you have any questions please contact us.

Very truly yours, Murray R. Edelman Vice President Nuclear Group MRE:nje Attachments s cc: Jay Silberg, Esq.  !

John Stefano 8406060189 840529 e l' Max Gildner PDR ADOCK 05000440 l A PDR

+- 1