ML20091J581
| ML20091J581 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/31/1991 |
| From: | Peterson D, Zach J WISCONSIN ELECTRIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-92-001, CON-NRC-92-1 VPNPD-92-008, VPNPD-92-8, NUDOCS 9201140137 | |
| Download: ML20091J581 (9) | |
Text
-. _ _ _ - - -. _ - - - -
g Wisconsin Electnc POWER COMPANY 231 W Michnart PO. Boa 2041 MJmxAeo N $3201 (444)221 2345 VPNPD-92-008 NRC-92-001 January 9, 1992 U.
S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D.
C.
20555 Gentlemen:
DOCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating-reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of December 1991.
Very truly yours, q)we of("
Jamqs J.
Zach Vice President Nuclear Power dpg Attachments Copies to L..L. Smith, PSCW=..
NRC Regional Administrator,' Region III NRC Resident Inspector-
$ (1000 a 3$0"$Do@:
j 6
i R
4 sadiddHintalhem-(l>purn.
~
' OPERATING DATA REPORT l
DOCKET NO. 50-266 1
DATE: January 6, 1992 COMPLETED BY:
D.
C.
Peterson TELEPHONE:
414 /755-2321, Ext. 361 OPERATING STATUS 1.
UNIT NAME:
POINT BEACH NUCLEAR PLANT UNIT 1 NOTES 2.
REPORTING PERIOD:
DECEMBER 1991 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE):
523.8
- 5. DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
509.
7.
MAXIMUM DEPENDABLE CAPACITY (NET MWE) :
485.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 9.' POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
ROT APPLICABLE
- 10. REASONS FOR. RESTRICTIONS, (IF ANY):
NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 8,760 185,424
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7,622.9 153,390.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7
- 14. HOURS GENERATOR ON LINE 744.0 7,525.1 150,428.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 9.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,091,753 11,243,308 210,650,003
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 368,860 3,801,350 71,103,730
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 353,157 3,628,733 67,749,773
- 19. UNIT SERVICE FACTOR 100.0-85.9 81.1
- 20. UNIT AVAILA53ILITY FACTOR 100.0 86.0 81.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 97.9 85.4 74.9
- 22. UNIT CAPACITY FACTOR (USING DER NET) 95.5 83.3 73.5
- 23. UNIT FORCED OUTAGE RATE 0.0 1.3 1.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
April 10, 1992 to May 22, 1992 (42 days)
Refueling and Maintenance Outage 19.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER' DATED SEPTEMBER 22, 1977
POINT BEACH NUCLEAR PLANT DOCKET NO.
M4 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach _IJait 1.-
MONTH DENMBER - 1991 DATE Januarv 6.1992 COMPLETED BY D. C. Peterson TELEPHONE 414/755-2221
' AVERAGE AVERAGE AVERAGE.
- DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWERIIVEL
.DE -
MWe NET PAY MWe NET DAY MWe NET -
1 467 11 4H 21' 492 2'
446
'12 '
496 22 493 3
495 13 387 23 493 4
'496 14 246 24' 491
'5-496-15 414 25 459
~6 496' 16 492 26 458
'7
'495 17 -
483 27 492 8
496 18 491
- 28 493 9
- 495,
- 19 488
- 29 ;
'493-
, 10 -
495' 20 477
. 30 493 31L 494
?
If'
- PDF-0028a (03-4 l.
-,u._.w
,.3
,___..__.______m_,_
_.,_a_,_
a_
ex.___,,,
~ -. - __, __ _, _,. =. _ _ _ _$
POIST BEACH NUCLEAR PIANT Dodet No.
9-2/{t_
Unit Name Point Bgi Unit 1 UNIT SHUTDOWNS AND POWER REDUCTIONS Date Januarv 6. N"2 Completed By D. C. Peterset REPORT MOME DECEMBER - 1991 Telephone No.
414/755-232L t'Q,
Method of
- Shutting '
2 r-No. :
. Date.
Type'
' Duration Reason Down Licensec Event System Component Cause and Correctrue Action
~
.9 911213.
'F NA F-5 N/A WE IFEXCII Power reduction for condenser tube inspectxe and sepair.
/
' I e
t e
e L
!.i s
F t
i f
.- 'F: Forced Reason:
- Method:
' Exhibit G - Instructions
- I 2
S: Scheduled A - Equipment Failure (explain)' Manual Scram data entry sheets 1 Manual B - Maintenance or Testing '
for preparation of.
C -' Refueling
' 3 - Automatic Scram LER file (NUREG-0161)
.! D - Regulatory Restriction -
4 - Continuation of E - Operator Training &
Previots Shutdown
' Licensing Exam -
5 - Redumd Load F - Adminierative ;
6 - Other (explain)
' Exhibit I - Same Source
-l
- G - Operational Error (explain) :
H - Other (explain)
PB N
, (03-90) -
m
. m Ad
--' C b
(
T-w y----
g 9
cyr-.
-.-4-y
.----9
DOCKET No.
50-266 UNIT NAME.
Point Beach Unit 1 DATE January 6, 1992-COMPLETED B'a*-
D.
C.
Peterson
.[
TELEPHONE 414/755-2321, Ext. 361 Unit 1 operated at approximately'474.7 MWe net throughout this report period with one significant load reduction for condenser tube inspection and repair.
Safety-related maintenance included the following:
_ cleaned _ seat and plug of fuel oil _ transfer __ discharge check. valve-to stop back 3eakage; rebuilt fuel oil transfer _ pump-and installed new pump; housing; moved actuating arm and repositioned _the.close limit on eaxiliary feodwater pump mini-recirc' control' valve; replaced auxiliary feedwater pump suction relief-valve;_ checked lug torques on all_ breakers with' field; wiring-attached on_125 DC distrjbution-panels D-11 and D-13;_ changed high alarm _setpoint on inverter room alarm temperature switch; replaced, calibrated:and-verified proper operation:offsafety injectionipump-discharge flow:
transmitters; replaced -25Vfpowar supply on N-44 nuclear.
instrumentation power range: channel; and replaced breakers in-DC-distribution panel D-13.
t.
=
OPERATING DATA REPORT DOCKET NO. 50-301 DATE: January 6, 1992 COMPLETED BY:
D.
C.
Peterson TELEPHONE:
414 /755 -2 3 21, Ext. 361 OPERATING STATUS
- 1. UNIT NAME:
POINT BEACH NUCLEAR PLANT UNIT 2 NOTES
- 2. REPORTING PERIOD:
DECEMBER 1991 3.
LICENSED THERMAL POWER (MWT):
1518.5 4.
NAMEPLATE RATING (GROSS MWE):
523.8 5.
DESIGN ELECTRICAL RATING (NET MWE):
497.
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :
509.
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
485.
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NOT APPLICABLE 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
NOT APPLICABLE
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
- 11. '-'OURS IN REPORTING PERIOD 744 8,760 170,209
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 733.0 7,645.2 148,729.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 216.7
- 14. HOURS GENERATOR ON LINE 726.0 7,569.7 146,489.0
- 15. UNIT RESERVE' SHUTDOWN HOURS 0.0 0.0 302.2
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,064,971' 11,302,748 209,467,157
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 362,530 3,862,120 71,159,380
- 18. NET ELECTRICAL ENERGY. GENERATED (MWH) 346,784 3,687,712 67,819,778
- 19. UICT SERVICE FACTOR 97.6 86.4 86.1
- 20. UNIT AVAILABILITY FACTOR 97.6 86.4 86.2
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 96.1 86.8 81.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 93.8 84.7 80.2
- 23. UNIT FORCED OUTAGE RATE 0.0 0.4 1.1
- 24. SHUTDOWNS SCHEDULED OVER NEX"I 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
NONE
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NOT SHUTDOWN
)
DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
' POINT BEACll NUCLEAR PLANT DOCKET NO.
A9h AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach.' Unit 2 MONTII DECEMBER - 1991 DATE January 6.1992 -
COMPLETED BY D. C Peterson TELEPHONE 414/755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL
~ DAY MWe 1:ET DAY MWe NET DAY MWe NET 1
500 11 408 21 500 2
4%
12 500 22 501 3
499 13 499 23 501 4
498 14 448 24 498 5
499 15
.251 25 500 6
500 16 42 26 500 7
498 17 205 27 500 8
498 18 147 28 500 9
498 19 496 29 501 10 408 20 498 30 500 31 501 PBF-0028a (03-90)
POINT BEACII NUCLEAR PLANT Docket No.
50 301 Unit Name Point Beach. Unit 2 UNIT SHUTD0%'NS AND POWER REDUCTIONS Date Januarv 5.1992 Completed By D. C. Peterson
~
REPO"T MONTH DECEMVER-1991 Telephone No.
414/755-2321. Ext. 361 ~
' Method of Shutting -
i No.
Date Type' Duration Reason Down IJcensee Ihent Systers Component
. Cause and Corrective Action 2
' (1 tours)
' Reactor -
Revort No.
Code' Code To Prevent Recut ence
[
8 8
t 2
911214
.F rN/A-F 5
WE IIIEXCII Power Reduction for Condenser Tube Sspection and repair.
I 3
911217 F
17A A
3 301-91-006 IA 11ECX)N Suppiy lead to a DC Btuker was paned loose stile pening cabic, causing reactor protection '
curui*s to deenerpze, stich caused tir reactor to trip
- y r
L e
. 'F: Forced'
-Reason:
? Method:
'Exhdnt G - Instructions
.S: Scheduled
' A - Equipment Failure (explain)'
1 - Manual
' for preparation of.
L B - Mabtenance or Testing
. 2 - Manual Scram -
. data entry sheets -
C - Refueling -
3 - Automatic Scram I.ER file (NUMG-0161)
D - Regulatory Restriction 4 - Continuation of E - Operator Training &
. Previous Shutdown
" r Ice cine Fram 5 - Reduced Imd -
- F.- Administrative 6 - Other (explain)
'Fuhibit I - Same Source
' G - Ogeisesel Error (explain)
H - Other (czplain)
F I
1PBF N b t
- (os.9o) r t
.2
~.
DOCKET NO.
50-301 UNIT NAME Point Beach Unit 2 DATE January 6, 1992 COMPLETED BY D.
C.
Peterson TELEPHONE 414/755-2321, Ext. 361 Unit 2 operated at approximately 466.1 MWe net throughout this report period with one significant' load reduction and one reactor trip.
The load reduction was a result of condenser tube inspection and repair; the recutor trip was caused by a supply lead to a DC breaker pulling loose, which deenergized DC distribution panel D-22 and resulted in a reactor trip.
During this period, Unit 2 experienced one reportable event in accordance with 10 CFR 50.73, LER 91-006, Unit 2 Reactor Trip, due to modification work.
Safety-related maintenance included the following:
replaced and calibrated signal process assembly in gamma metrics startup rate meter; inspected and retightened coupling on steam sensing line to auxiliary feedwater turbine driven pump; replaced turbine independent overspeed protection Channel A speed control card;.
and replaced nut and retorqued safety injection piping support.