ML20091G633

From kanterella
Jump to navigation Jump to search
Confirms 840525 Telcon W/Pb Bloch Granting Extension of Time Until 840611 for Applicant to Respond to Ohio Citizens for Responsible Energy 840514 Twelfth Set of Interrogatories Re Issue 16.Related Correspondence
ML20091G633
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/25/1984
From: Swiger M
CLEVELAND ELECTRIC ILLUMINATING CO., SHAW, PITTMAN, POTTS & TROWBRIDGE
To: Bloch P, Bright G, Kline J
Atomic Safety and Licensing Board Panel
References
OL, NUDOCS 8406040327
Download: ML20091G633 (3)


Text

1 4,.35 E

RELATED CORRESPONDM

~

SHAw, PITTMAN, PoTTs & TROWBRIDGE A PARTNERSHIP OF PeorESSsONAL CORPORATIONS nLOD'ETEP 1800 M STREET, N. W.

UMd5 WASHINGTON D. C. 20036 (aozl eaz iooo otsORAM uffMuSEsE nf m

TM OONE ROWAN

  • RAMSav o. POTTS. P C JOHN ENoEL. P C.

SCOTT A. A sumE RGij; est E

MILL E R t TEuaNT L PITTMAN. P C.

C. THOMAS MICMS.se. P C.

O ORGE F. TROwensooE, P C.

CMARLE S s. TEMulN. P C.

CAMPSELL MILLEFER WEND LBf A weeeTE m

CMA F

,P NT P 96

'P C TELECOpfER s"*$ "p'. #"R g'g"$fg*[t$MS"O H

L 8

g OTM'Y AN N PC AND LE REL, C ODO IEO22*88 THE N P C b

i

'Jf"i'."# t[1"? "" "'

"R8:!"R ".'O".'4"IFC.

S'a'D J MO

fet'A '0R.

x !"em ""a*Ch'"AL JCMM 5 #898ME ANDER PC S TE VEN M. LUCA S. P C.

DELIS SA A. E80Gway !. 'g & % - STEPMEN 8 ME *M A NN S

.' N MOL N

R P C.

Ma t S. TRAv ES IAZ.

C.

Da O WREN E lek (

EL NL B ROWN E LL MARTsN O. umALL. P C.

V8CTOmsa 4 PERouhS. P C.

(20 4 8224072 FmEoEmeCm L MLEIN PAMELA M ANDE RSON L1CMARO J. mENDALL. P C.

JOMN M. O N EILL, J m.. P.C.

S'E V E N P. PtTL E R ALEM ANDER D. TOMASZCZUM R

M SS TTI, P C.

FERY. An'LO, P C.

N RED UN NC w EN uf"i,*,,fSOOC."

"c-1'!"A"to"Po"A N M2"'E"PoAA'N"o"

"A'"EU S"J'o"ER rfN$

STEIN MA M NE P REND R P C.

Mr M GLASSP L

D ANE. s'URmLEY TA J N""S'T".'."L A'4",:;'P C.

L" "A** N#2""'c" c^*~5"'"'^*~

HAT"'A". E ""E.E RM AN

  • c E'

'o"."S?h%'"'"

N CARLETON S. JONES. P C.

CM# RLES M. MONTANGE JbosTM A. SANDLE R C. 80wDosN TmanN YMOMAS A. SAJrTER, P C.

JE AN M. GALLOwAv EO*ARD O. young, Ott JEFFREY W, M AMPELMAN

[ME oON JUw SdL C.

M L7P J.

A Ev CMAR

. AN mkNN!

. u ReACM Me",',S "n"M.% C.

."?"!".!A"#f0"#E"

" ** " c"*" ""-

TC3"^.*JJo" 3*'" ""-

^i0"o b TEvt N L. MELTZE R. P C SONNIE S. GOTTLtE S COUNSEL PETER J FERRARA RICHARO K A. SECRE R DEAN D. AuLICK, P C.

MOWARD M. SMAFFERMAN MELEN TORELLt wateERT WASMINGTON II

  • aeot aceeptso eos o c May 25, 1984 w..TE R S o, ECT o.A

,~M.E R (202) 822-1178 Peter B. Bloch, Chairman Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Dr. Jerry R.

Kline Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Glenn O. Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Re:

In the Matter of The Cleveland Electric Illuminating Company (Perry Nuclear Power Plant, Units 1 and 2) Docket Nos. 50-440

& 50-441 i Gentlemen:

This is to confirm my telephone conversation today with Chairman Bloch granting an extension of time until June 11, 1984, for Applicants to respond to Ohio Citizens for Responsible Energy Twelfth Set of Interrogatories to Applicants, dated May 14, 1984 (served May 15, 1984),

n 8406040327 840525 h

PDR ADOCK 05000440 9

PM

?

SHAw, PITTMAN, PoTTs & TROWBRIDGE A PARfM'.RSHID OF pmOFteseONAL ComponATtONS Peter B. Bloch Dr. Jerry R. Kline Mr. Glenn O. Bright May 25, 1984 Page Two concerning Issue No. 16.

The NRC Staff and OCRE did not object to the requested extensions of time.

Because Applicants' answers were not due until June 4, 1984, the extension will not affect the June 1, 1984 extended discovery deadline set by the Licensing Board in its Memorandum and Order (Discovery About Transamerica Delavel Diesels), dated May 8, 1984.

Respectfully submitted,

&ichmQ Q. jD(p MICHAEL A.

SWIGER Counsel for Applicants 9

d Service List, cc:

?

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of

)

)

THE CLEVELAND ELECTRIC

)

Docket Nos. 50-440 ILLUMINATING COMPANY

)

50-441

)

(Perry Nuclear Power ' Plant,

)

Units 1 and 2)

)

SERVICE LIST Atomic Safety and Licensing Pater B. Bloch, Chairman Appeal Board Panel Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Connaission Washington, D.C.

20555 Washington, D.C.

20555

.~

Dr. Jerry R. Kline Docketing and Service Section Atomic Safety and Licensing Board Office of the Secretary U.S. Nuclear Regulatory Con: mission U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Washington, D.C.

20555 Colleen P. Woodhead,, Esquire Mr.'Glenn O. Bright Office of the Executive Legal Atomic Safety.and Licensing Board Director U.S. Nuclear Regulatory Connaission U.S. Nuclear Regulatory Commission Washington, D.C.

20555

/

Washington, D.C.

20555 Christine N. Kohl, Chairman Ms. Sue Hiatt Atomic Safety and Licensing OCRE Interim Representative Appeal Board U.S. Nuclear Regulatory Commission 8275 Munson Avenue Washington, D.C.

20555 Mentor, Ohio 44060 Terry Lodge, Esquire Dr. W. Reed Johnson 618 N. Michigan Street, Suite 105 Atomic Safety and Licensing Toledo, Ohio 43624 Appeal Board U.S. Nuclear Regulatory Connaission Donald T. Ezzone, Esquire Washington, D.C.

20555 Assistant Prosecuting Attorney Lake County Administration Center Gary J. Edles, Esquire 105 center Street Atomic Safety and Licensing Painesville, Ohio 44077 Appeal Board U.S. Nuclear Regulatory Connaission John G. Cardinal, Esquire Washington, D.C.

20555 Prosecuting Attorney Atomic Safety and Licensing Ashtabula County Courthouse Jefferson, Ohio 44047 Board Panel U.S. Nuclear Regulatory Conunission Washington, D.C.

20555 O

i mas a si sim as eiieimi ii iin si

- i eii