ML20091F190

From kanterella
Jump to navigation Jump to search
Corrected TS Pages to Amends 155 & 146 to Licenses DPR-77 & DPR-79,respectively Re Surveillance Requirements for Power Distribution Limits
ML20091F190
Person / Time
Site: Sequoyah  
(DPR-77-A-155, DPR-79-A-146)
Issue date: 04/15/1992
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20091F194 List:
References
NUDOCS 9204200189
Download: ML20091F190 (3)


Text

. _ - _ _ _ _ _ _ _ _ - _ - _ - - _ - - - - _ - - - - - - _ -. - _ - _ _ - - - - - _ - _ _ - _ - - ----- --_-- - _ _ --

POWER DISTRIBUTION LIMITS SURVEllt.ANCE REQUIREMENTS (Cont,inued) e.

With measurements indicating maximum II) over z K(z)

N has increased since too previous determinatin of F9 (z) either of the following actions shall be taken:

N 1.

Fg (z) shall be increased by 2 percent over that specified in 4.2.2.2.c, or N

2.

Fg (z) shall be measured at least once per 7 etfective full power days until 2 successive maps indicate that F (2) maximum is not increasing, over z K(z) f.-

With the relationships specified in 4.2.2.2.c above not being satisfied:

1.

Calculate the percent F (z) exceeds its limit by the following exnrossion:

n M

Fq (z) x W(z)

-1 x 100 for P > 0.5 maximum over z IP p

x K(z)

P s

F "(I) x W(z) maximum n

-1 x 100 for P < 0.5 1

over z RlP p

x g[g)

.5 2.

Either of the following actions shall be taken:

L a.

Place the core in an equilibrium condition where the limit in 4.2.2.2.c is satisfied.

Power level may then be increased provided the AFD limits of Specifi-cation 3.2.1 are reduced 1% AFD for each percent F (z) l l

exceeded its limit, or g

b.

Comply with the requirements of Specification 3.2.2 for F (z) exceeding its limit by the percent calculated above.

9 SE0VOYAH - UNIT 1 3/4 2-7 Amendment No. 19, 95, 140, 155 9204200189 920415 PDR ADOCK 05000327 1

'P PDR

1 i

4 POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued) e.

With measurements indicating I (*)

maximum over 2 z

has increased since the previous determinatin of Fq (z) either of the following actions shall be taken:

N(z) shall be increased by 2 per;ent over that specified in 1.

Fq 4.2.2.2.c, or N

2.

Fq (z) shall be measured at least once per 7 effective full power days until 2 successive maps indicate that Fh(2) maximum is not increasing.

over z K(z) f.

With the relationships specified in 4.2.2.2.c above not being satisfied:

1.

Calculate the percent F (z) exceeMs its limit by the following expression:

g N

Fg (z) x W(z)

I x 100 for P > n.5 maximum 4

over z A

plRTP /

x K(z)

(Z) * (*)

maximum

-1 x 100 for P < 0.5 4

over z RTP..

p x K(z)

0. 5 2.

Either of the following actions shall be taken:

a.

Place the core in an equilibrium condition where the limit in 4.2.2.2.c is satisfied.

Power level may then be increased provided the AFD limits of Specifi-cation 3.2.1 are reduced 1% AFD for each percent F (z) exceeded its limit, or q

b.

Comply with the requirements of Specification 3.2.2 for F (z) exceeding its limit by the percent calculated above.

q SEQUOYAH - UNIT 2 3/4 2-6 Amendment No. 21, 95, 131, 146 l

POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued) e.

With measurements indicating IQ (I) maximum over z K(z) has increased since the previous determinatin of f0 (z) either of the following actions shall be taken:

N 1.

Fq (z) shall be increased by 2 percent over that specified in 4.2.2.2.c, or N

2.

Fq (2) shall be measured at least once per 7 effective full power days until 2 successive maps indicate that F (z) maximum is not increasing.

over z K[iT f.

With the relationships specified in 4.2.2.2.c above not being satisfied:

1.

Calculate the percent F (z) exceeds its limit by the following expression:

q N

~g (z) x W(z)

F maximum

-l x 100 for P > 0.5 4

over z RTP k

l x K(z)

)

N 3

Fq (z) x W(

3 x 100 for P < 0.5 maximum 4

over z RTP p

x g(7)

.5 2.

Either of the following auf ons shall be taken:

a.

Place the core in an equilibrium condition where the limit in 4.2.2.2.c is satisfied.

Power level may then be increased provided the AFD limits uf Specifi-cation 3 2.1 are reduced 1% AFD for each percent F (z) exceeded its limit, or 0

b.

Comply with the requirements of Specification 3.2.2 for F (z) exceeding its limit by the percent calculated above.

9 SEQUOYAH - UNIT 2 3/4 2-6 Amendment No. 21, 95, 131, 146

. -