MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
/ - N -C mmonwrith Edison
,/ ) Byron Nuclear Station
. ; u 7 4450 North Gerrnan Church Roao
\%- / Byron, illinois 01010 January 6, 1992 l
I LTR BYRON 92-0024 FILE: 2.7.200 l
Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C. 20555 l ATTN Document Control Desk l Gentlemen:
C.) closed for your information in the Monthly Performance Report ;
covering Byron Nuclear Power Station for the period December 1 through December 31, 19 M .
l l
Sincerely, Station Manager ',/
Byron Nuclear Power ' Station RP/DE/bl (3767M/VC) cc A.B. Davis, NRC, Region III NRC Resident Inapector Byron Ill. Dept. of Nuclear Safety M. J. Wallace/E. D. Eenigenburg Nuclear Licensing Manager Nuclear Fuel Servicer, PWR Plant Support D. R. Eggett, Station Nuclear Engineering INPO Records Center A. Hsia - USNRC F. Yost - Utility Data Institute, Inc.
e
, r.
/
9204140215 911231 4 DR ADOCK 0500 y 7
BYRON NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTilLY PERFORMANCE REPORT ,
COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 NRC DOCKET NO. 050-455 LICENSE NO. HPF-37 LICENSE NO. NPF-66 P
/
(3767M/VS/1)
I. Mnnthly_Rosct_InL_Dyron_UNII_1_ fat.1he month of December 1991 A ufmmmnEy_n L_Dparating_IKpellence__isLNail_1 The unit began this reporting' period in Mode 1 (Power Operation) and continued there all month. The power level varied due to load followi>g requirements.
um (3767M/VS/2)
F .
l r i
'C .
.i i
D2_iDFIRAIlt4G DATA _ REPORT DOCKET HO.: 050-454 UNIT: Byron One DATE: 01/06/92-COMPILED BY: D. Ehle TELEPHONE: (815)234-5441 x2263 OPERATING STATUS
- 1. Reporting Periods- December, 1991. Gross Hours: 744 g
-2. Currently Authorized-Power Level 3411 (MWt) o' Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Cepacityr'1105 (MWe-net)
- 3. _ Power Level-to Which Restricted (If Any): None 4.. Reasons for Restriction (If Any): h/A THIS MONTH YR TO DATE CUMULATIVE *
- 5. _ Report Period-Hrs. 744 8,760 L5,153
- 6. Rx Critical Hours 744 7,242.7 44,926.9 7.- s- Reserve Shutdown Hours 0 0 3G
- 8. Hours Generator on Line 744 -7,148.3 44,303.9 9 .' Unit Reserve' Shutdown Hours O G 0-
- 10. Gross Thexnal Energy (MWH)- 2,400,177 19,930,976 132,803,580
- 11. Gross Elec. Energy .(MWH) 815,562 6,692,169 44,773,249
- 12. Net-Elec. Energy (MWH) -777,885 6,307,232 42,219,497
- 13. Reactor Service Factor 100.00 82.68 81.46
- 14. Reactor Availability Factor. -100.00 82.68 81.53'
- 15. Unit Service Facter 100.00 01.60 80.33 16.-Unit Availability Factvr 100.00 81.60 80.33
- 17. Unit Capacity Factor (MDC net) 94.62 05.16 69.28 l 18. Unit Capacity Factor-(den net) 93.35 64.29 68.35
- 19. Unit Forced. Outage Hrs. 0 -76.1 1,342.5 20.-Unit Forced Outage Rate 0 1.05 2'.94
.21. Shutdowns Scheduled Over Next 6 Months: N/A
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 'N/A
.23. Units.in Test Status (Prior to Commercial Operation): None
!1 j - . '
- . Note - The cumulative numbe s do not reflect-power L
generated _pr*,or to commercial service.
L (3767M/VS/3) w-g
C. MLEEAGE._DAlLX.3Rl*[._ECMEB _LERL DOCKET NO.: 050-454 UNIT: Byron One DATE: 01/06/92 COMPILED BY: D. Ehle TELEPHONE: (815)234-5441 x2263 MONTH: December, 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 1Qfii_1M 16. 1058 MW
- 2. 1010_14W __ 17 U 10_Kd
- 3. .
1068 FM 18. 1083 Kd
- 4. 1045 MW 19. 1078 MW 5, 1077 MW lo. 1.169 MW 6, 1031._tf(, 21. 1050 MW
- 7. 1031 MW 22, 1059 MW kEt
- 8. 942 MW 23, 1040 MW '
9, 1059 MW 24. _LQfi3 MW
- 10. 10.13 MW 25, 1022 bN 11, 1011 MW 2 6 . ___ 1045 MW 12, 1013 MW 27._, 1102 MW
- 13. 970 MW __
2 8 . _,, 1094 MW 14, 1019 MW 29. 1033_MW 15 992 MW '5 0 . 1003 MW
- 31. 1061 MW INSTRUCTIWS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit tnere may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power-output sheet should be r ootnoted to ex' plain the apparent anomaly.
(3767M/VS/4)
BYRCN
- UNIT SHUTDOWNS / REDUCTIONS .*
1eport Period December, 1991 **************************
(UNIT 1)
Date Tvoe Hagra Reason Method ___LER Number System Component Cause & Corrective Action to Prevent Recurrence No.
No Shutdowns or major reductions for Unit 1.
o**ooo*********
O Summary *
Method SySigm & Comp _gnent __
TYPE Renop t
1-Manual Exhibit F & H F-Forced A-Equip Failure F-Admin Instructions for B-Maint or Test G-Oper Error 2-Manual Scram S-Sched Preparation of C-Refueling H-Other 3-Auto Scram 4-Continued Data Entry Sheet D-Regulatory Restriction Licensee Event Report E-Operator Training 5-Reduced Load
& License Examination 9-Other (LER) File (NUREG-0161)
(3757M/VS/S)
I t
Tu.__ UR100E REPORIIRG__EEQUIREMENTS (UNIT __11_EQLthe_ month nLHerember 1991
- 1. Safety / Relief ve'.ve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIP". ION DATE ACIVATED AGbATION COND1210H RE_EEERT None
- 2. Licensee generated changes to ODCH.
None.
- 3. Indications of failed fuel.
Fuel Reliability Indicator:
Yes FRIt 1.1E-2 pCi/cc
- 4. 10CFR50.46 Reporting Requirements: Peak Clad temperature (PCT) changes resulting from change or errors to the ECCS evaluation model.
Current licensing basis FCT plus margin allocation (*F)
Lage_BI.eALLQCA Small_BrenLLOCA ,
2051.3 1510.1
- Explain differences from previous report:
None e
(3767M/VS/6)
R J INSEI_E M T REPSRTS (UNIT _11 The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, subnitte.d during the reporting period, December 1 through December 31, 1991. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licennet.Iygst Report fumber Ibialt Title of Occyigene_g 91-006 11 14-91 Emergency Diesel Generatir Inoperable.
g.
l I
1 0
e l
l.
r
, .(3767M/VS/7).
u
.... . ~
II . Monthly _Reporifor_ByI_un_Ull17_l_loI_.the_nonth__oLDerember_1191 A. S umm atty _of_Opf ; atingl KP_ellencs_fa r_llai.t._2 The unit began the reproting period in Mode 1 (Powar Operation) and continued there all month. The power level varied due to load following requirements.
i i
'I (3767H/VS/8)
. . . . -. - - . , - , - - .- . -- - . - .- - - .~ _
- g' A
- a. .
6-
.Dj .. OPERATING-DATA _RIPORT V' .-..
DOCKET NO. 050-455 2
UNIT: Byron Two DATE: 01/06/92 COMPILED BY - D. Ehic TELEPHONE: (815)234-5441 x2263
' OPERATING STA7US
- 1. Reporting Periods. Dect .nbe r , 1991. Gross Hours: 744 f2. Currently Authorized PJwer Levels.3411 (MWt)
- Design Elect'ical r Ratings.1275- (MWe-gross)
Design Electrical Rating: 1120 (MAc aet)
Max Dependable' Capacity: 1103 (MWe-net) '
J3. Power Level to WhichLRestricted (If Any). N/A
- 4. Eeasons for Restriction (If Anyf THIS MONTH YR TO DATE CtMULATIVE* -
- 5. Report 1 Period Hrs. 744 8,760 38,257 6.c Rx Critical Hours 744 8,502 '33,234.1 ,
. -7. -Rx Reserve Shutdown Hours 0- 0 0 p :8. Hours Generator on Line' 744 8,490.5 32,775.1
.9. Unit Roserve Shutdown Hours 0 0 0 3: 10.JGross Thermal. Energy (MWH) .2,455,371 27,207,328 91,518,720 L. 11.LGross;Elec. Energy-(MWH) .833,346 9,218,674 30,956,769 112. Het.Elec. Energy (MAH) 705,507 8,772,679 29,177,008 d
=13.. Reactor Service factor 100.00 97.05 86.87
- 14. Leactor' Availability Factor 106.00 97.05 86.87 115. ' Unit Service Factor . 100.00- 96.92 85.67-
~
l+ ,
'16. Unit Availability Factor 100'.00 96.92 85.67
- 17. .dcit-Capacity Factor (MDT net) 96.76- 90.03. 69.02:
- E l 18. Uniticapacity Factor-(DER' net) 95.47 89.41 68.02' l 19. Unit' Forced ~ Outage Hrs.
0 269.5 1155.9
- 20. Unit Forced Outage Rate-- 0 3.08 .3.41 L -L21. Shutdowns Scheduled Over Next 6 Months: Unit 2 third refuel outage, s
- 22. IfEShutdown at End:of Report Period, Estimated Date of Startup:
L23.1 Units in' Tost-Status (Priot-to Commercial Operation): Nono l
.
- Note - The cumulative' numbers do not reflect power l'
' generated prior to ' commercial service.
E (3767M/VS/9)
. . .. ._ . . . - . ,- . w., u , ,
q .. <
i A J RAGE._ DAILY UNIT PO W EEEL-DOCKET NO. 050-455 UNIT: Byron Two DATE: 01/06/92-COMPILED BY: :D. Ehle ,
TELEPHONE: (815)234-6441 x2263 MONTH:- December, 1991
~~i.
Y : DAY AVERAGE !)AILY POWER LEVEL (MWe -Ne t )
- 1. 2 005 M'd __
1.5 . -1067 MW
- 2. 1Q7), MW 17. ~ 1058 Rf4
- 3. 1079 MW 18. 1082 MW 4 '. . 1088 MW 19. 1081 MW
- 5. _, 1057 MW- 20. 1067 MW
- 6. 1058 MW 21. 1056 MW
~
.. -1013 Ed 22, 1066 MW
.8. 982 MW 23, 1077 MW-
- 9. _. 1025 MW 24. 1105 W4 _.
- 10. _ 1098 MW 25. 1106 MW
- 11. 1100-MW _
- 26. 1103 MW
- 12. _lqQI-MW 27 . ,, 1106 MW ,
, 13. 103_7 MW .- '28.- '11QD._MW :
- 14 . - 1015 MW 29 1107 MW l'i , 1060 MW 30.. 1108 M}f 3 2. . 1108 MW INSTRUCTIONS-
.On this form list the' average daily unit power le'rC .n MWe-Net for each day-
~1n the-repotting month. Compute to the nearest whole megawatt. These figures
.will be'used to plet a graph for each reporting. month..; Note '. hat when maximum
' dependable capacity is used for the net electrical rating of the _ unit .there may be occasions' when the daily average power level exceeds the 100% line
'(or-the~ restricted power level.line.) 'In such cases the average daily unit power-output. sheet should be. footnoted to explain.the apparent anomaly.
( 3? 6711/VS/10)
.c , . _
h.
~
' Report Period December, 1991 UNIT SHUTDOWNS / REDUCTIONS t BYRON *
(UNIT 2) **************************
- _RL_.. _Itate___ Iyge ours Reason tiethqd LER Number System Component __ Cause & Corrective Action to Prevent RecurySpee No Shutdowns or major reduction.s for Unit 2.
IXEE Reasan ~Hetimd _ _. Sydtem_Il cmpomen t F- Fo rced A-Equip Failure F-Admin 1-Manual Exhibit T & H S-3cdc4 B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Oontinued Data Entry Sheet E-Operator Training 5-2 educed Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(3767M/VS/11) 2 l
EJ10UI EEEDETING REWlEf2iENIS_LUMIT 2) for_themonth of DarembnI_19.91
- 1. Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED AC211AT10ti CWDlTlW OI fv1NT None
- 2. Licensee generated cLnges to ODCM.
None.
- 3. Indications of failed fuel.
Yes Fuel Reliability Indicator FRI :: 1.2E-3 pCi/cc 4, 10CFR50.46 Reporting Requirements: Peak Clad temperature (PCT) changes tesulting from changes or errors to the ECCS evaluations model.
Current licensing basis PCT plus major allocations (*F)
Large BI.gak LOCA Small Break LOCA 2064.1 1510.1 Explain differences from previous report:
None 0
(3767M/VS/12)
4 P. - - LLCINEEL_IYElfLFIEORTS_LUNIT_31 The fellowing is a tabular summary of all Licensee Event Reports for
. Byron Nuclear Power Station, Unit Two, submitted during..the reporting period, December 1 through. December 31, 1991. This information it. provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence LICangre Event Report Number Date Title of,Occurrengg 91-005 11-07-91 Unit 2 reactor trip on low 2 Steam Generator Lovel.