Monthly Operating Rept for Apr 1991 for Callaway Plant Unit 1
ML20091A347
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/30/1991
From: Blosser J, Mccann R
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2406, NUDOCS 9105150143
Download: ML20091A347 (5)


Text

_

.!4 b

4 May 6, 1991 UNION ILLECTRIC

?3 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-2406

Dear Str:

DOCKET NUMBER 50-483 CALIAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT APRIL 1991 The enclosed Monthly Operating Report for April, 1991 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

[

. D. Blosser Manager, callaway Plant 0

t h T9 fr-M' JDB/DEY/RDA/ TAM /RJM/ crc Enclosure cc:

Distribution attached hh 3

O J

dby a

i

\\

......... ~.

. +"

g cc distribution for ULNRC+ 2406 with enclosures Mr. Richard Hague, Chief Project Section 1A-U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. H. D. Lynch (2 copies)

Office of Nuclear Reactor Regulation U. S, Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville, MD 20852 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO 65102 i

l:

w't-Ymr

I DOCKET No.

50 483 UNIT NAME CALLAVAY UNIT 1 DATE 5-06 91 COMPLETED BY R. J. McCann TELEPil0NE 314/676-8243 PART A OPERATIONS

SUMMARY

The plant operated at approximately 1004 power for the entire inonth with the following exception.

On 4/16/91, load was reduced to 804 to repair an air line leak on AFIN0071A (heater drain pump discharge control valve). Full power operation resumed on 4/17/91.

PART B PORV AND SAFETY VAINE

SUMMARY

None Page 1 of 4

.. _ _ _ _. _ _. _. _ _. _ _. _ _ _ _ _ _ _. _.. _.. _.... _.. _ _ _ _ _ ~ _. _ -. _ _. _ _... _ _ _.

PART C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50 483 UNIT Callaway Unit 1 i

DATE 5 06-91 COMPLETED BY R. J, McCann TELEP110NE 314/676 8243 i

MONTil: APRIL 1991 AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (MVe Net) 11AJ (MWe) 1

-1149 17 1091 2

1142 18 1168 3

1143 19 1177 4

1139 20 1171 5

1131 21 1180 6

1141 22 1180 7

1157 23 1174 8

1154 24 1178 9

1174 25 1178 10

-1181 26 1163 11 1165 27 1125 12 1142-28 1161 13 1119 29 1161 14 1139 30 1170 15-1147 31 16-1135 Page 2 of 4

-._.._._.m

(.-

a,1 4

Pa r t. D OPERATING DATA REPORT DOCKET NO.

50-483 UNIT NAME CALIMAY UNIT 1 DATE 5-06-91 COMPLETED BY R. J. McCANN TELEP110NE 314/676 8243 OPERAi!NG SIATUS (IJTg g!M) 1.

REPORilNG PERIOD: April 1991 GROSS HOURS IN REPORTING PERIDO: 719 2879 55,740.$

?.

CURREN!LY AUTHORIZED POWER LEVEE (MWt): 3565 MAX. DEPEND. CAPACITY (MWe-Net): 1125 DESIGNELECTRICALRATING(Kde-Net): 1171-3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net):

4.

REASONS FOR RESTRICTION (lF ANY):

THIS MONTH TRTODA3 CUMut ATIVE 5,

NUMBER OF HOL'R$ REACTOR WAS CRITICAL.. 4 719.0 2879.0 48,224.4 6.

REACTOR RE!ERVE SHUTOOWN HOURS..

0 0

0 7.

HOURS GENERATOR UN'LINE.,

719.0 2879.0 47,002.2 8.

UNIT RESERVE SHU100WN HOURS...,..

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH).

2,532,714 10,166,585 156,054,180

10. GROSS ELECTRICAL ENERGY GENERATED (MWH)..

868,479 3,511.543 53,123.124 11, NET ELECTRICAL ENERGY GENERATED (MWH)..

830,043 3,357.741 50,457,918

12. REACTOR SERVICE FACTOR.

100.0 100.0 86.5

13. REACTOR AVAILABILITY FACTOR..

100.0 100.0 86.5 14, UNIT SERVICE FACTOR..

100.0 100.0 84.3

15. UNIT AVAILABILITY FACTOR.

100.0 100.0 84.3 l

16, UNIT CAPACITY FACTOR (Using MOC).

102.6 103.7 80.5 17, UNIT CAPACITY FACTOR (Using Design MWe)..

98.6 99.6 77.3

18. ' UNIT FORCEO OUTAGE RATE.

0,0 0.0 3.3

19. ~ SHUTDOWNS SCHEDULEO OVER NEXT 6 MONTHS (TYPE. DATE, AND DURAi10N OF EACH):

2 0,-

IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STAR 1UP:

Page 3 of 4 l

=

wL PAGT E UNIT SHuiOCWNS AND PL%ER REDUCTIONS DOCKET NO.

50-483 UNIT %AME CALLAVAY UNIT 1 OATE 5-06-31 COMFLETED BY R. J. "ccenn TELEFn0%E 314/676-8243 REPORT MONTH: AFRIL 1991 PETHOD Or 5HLTTI%S DOWN TYFE F: FORCED DUCATION THE REACTOR OR No.

DATE 5: SCFEDULED (HOLRS)

REASON REDUCING POWER CC;RECTIVE ACTIO45/CO*wENTS On 4/16/91, Icad was redaced to 80% to repair en cir Tine 3

4/15/91 F

0 A

1 leak on AFLVD071A (heater drain pu-p discharge cortrol operation resu ed en 8/I7/91.

valve). fuli power m

EUMvARY:

REASON FETHGD A: EQd!Pw!NT FAILURE (EAPLAIN) 1: WANUAL B MAINT. OR TEST 2: MA%UAL SCRA*

C, REFUELING 3: AuiDMATIC SCRA*

D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AN3 LICENSE EXA"INATION l

F: ADMINISTRATIVE G: OPERATIchAL EFRCR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 4 of 4 l