ML20091A259

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 14 to EPIP-03,rev 15 to EPIP-04,procedure Change Notice (PCN) PCN 3 to EPIP-11,PCN 2 to Rev 10 to EPIP-20 & PCN 2 to Rev 7 to EPIP-33.W/920323 Release Memo
ML20091A259
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/01/1992
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20091A262 List:
References
161-04639-WFC-N, 161-4639-WFC-N, NUDOCS 9203260191
Download: ML20091A259 (5)


Text

.-

10 CFR 50, App. E.V Arizona Public Sem.ce Company P O ECX E39W PHOEN ARZONA 8'072-3999 a

l t ECUT v v CE 8 5 E T 161-04639-WFC/NEM U. S. Nuclear Regulatory Commission March 1,1992 ATTN: Document Control Desk Mail Station P137 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station 5'VNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Emergency Plan Implementing Procedure Update File: 92-002 493: 92 056-026 In accordance with 10 CFR 50, Appendix E.V, enclosed please find copies of five updated l

PVNGS Emergency Plan Implementing Procedures (EPlPs). Procedures included with this transmittal are indicated on Enclosure A. The EPIPs, and an updated listing of the PVNGS EPIPs, are included as Enclosure B.

i By copy of tH3 letter, Arizona Public Service Company is forwarding two sets of the revised EPIPs to the NRC Region V Office. A copy of each revised EPIP is routinely provided to the Resident inspector at PVNGS as an update to controlled procedures assigned to the NRC Resident Inspector's Office.

If you have any questions, please contact Nora Meador at (602) 340-4088.

Sincerely,

'/Q#s6 WFC/NEM/nem Enclosures cc:

J. B. Martin (w/ Enclosure A & 2 sets of Enclosure B)

A. C. Gehr (w/ Enclosure A)

D.H.Coe (w/ Enclosure A)

P. M. Qualls (w/ Enclosure A & 1 set of Enclosure B)

[\\

(

A. H. Gutterman (w/Enclosurc /.)

/h. f k

/ gi 9203260191 920301

/.

PDR ADOCK 05o00528

/

F PDR "g

i

/

r. '.t O :., a

'l '

/

,o l

16104639 WFC/NEM March 1,1992 ENC _l._OSURE A EMERGENCY PLAN IMPLEMENTING PROCEDURE UPDATE CURRENT CURRENTL EPIP NO.

REVISION NO.

PCN NO.

MARKED PAGES*

03 14 0

1,6,8,12,14,15,16,19,21 04 15 0

1,7,8,9,10,11,12,14,17,22 4

23,24,28,30 11 10 03 1,14,15,17,18,26,29,34.

20 10 02 1,7,8,12,15 33 07 02 1,5,6,7 Updated IJsting of Procedures l

Dated 02/03/922 Certain EPIPs contain information considered private or proprietary (including names, home telephone numbers, and Internal and external telephone numbers which must remain available during an smorgency). In accordance with Generic Letter No. 81-27, the specific information has been bracketed on the Indicated pages. We request this information be considered confidential and withheld from public disclosure pursuant to 10 CFR 2.790(a) and 10 CFR 9.17(a).

i

l 4

ENCLOSURE B PVNGS EMERGENCY PLAN IMPLEMENTING PROCEDURES DATED FEBRUARY. 03,1992 1

J1

)

e

'- ~ ' -

_________z________