Monthly Operating Repts for Feb 1992 for San Onofre Nuclear Generating Station,Units 2 & 3
ML20090M240
Person / Time
Site: San Onofre  
Issue date: 02/29/1992
From: Farr M
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML13309A977 List:
References
NUDOCS 9203240098
Download: ML20090M240 (12)


Text

._

NRC MONillLY OPERAllNG REPORT DOCKEl NO: 10-161_ __

i UNIT NAME: J ONGS - 2 DATE:

3-13-92 COMPLETED BY:

, igr TELEPHONE:

1 368-9787 QPERATING STATUS 1.

Unit Name: Jan _Onofre Nuclear GentEdino Station. Unit 2 2.

Reporting Period _f.Druary 1192 3.

LicensedThermalPower(MWt):

4.

NameplateRating(GrossMWe):

390 2L 5. Design Electrical Rating (Net MWe): ._1QZ9 6. MaximumDependableCapacity(GrossMWe):,__1127 7. Maximum Dependable Capacity (Net MWe): 1070_ 8. IfChangesOccurinCapacityRatings(ItemsNumber3Through7) Since Last Report, Give Reasons: __l{A 9. Power Level-To Which Restricted, If Any (Met HWe): NA

10. Reasons For RestrMtions, if Any:

NA This Month Yr.-to-Date Cumulative 11. Hours in Reporting Period 6%2Q ld49AQ 74.831dQ.. 12. Number Of Hours Reactor Was Critical _696.09 Id40.00 53.9R,2S_ 13. Reactor Reserve Shutdo.<n Hours O qQ 0.0Q, _ 0.00 t 14. Hours Generator On-Line 696.QD 1.440dQ._ 52.BDJ.dS_ 15. Unit Reserve Shutdown Hours 0.00 0.00 O JQ._ 16. Gross Thermal Energy Generated (MWH) 2.347.4 0 d2 _. 105 481.87 J72.327 J17.30 17. Gross Electrical Energy Generated (MWH) 826.733.09 1,648.191.00 J8.44L 493.50_ 18. Net Electrical Energy Generated (MWH) 768.963.00 LS71.03L.Q9 55.383 316 81_ 19. Unit Service factor 100a00% 100 093 _70.67% 1 2 20. Unit Availability Factor __ 100.q0,1 100.00%,_ 70.6]3 21. UnitCapacityFactor(UsingMDCNet) 103.26% 101.9Qi 69 113 22. Unit Capacity factor (Using DER Net) 103.26% 101 S i 69.17% 1 23. Unit Forced Catage Rate 0.00% 0.00% - C. 7_Qi 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): None NA 25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA mor.feb/2 ) 9203240098 920313 PDR ADOCK 05000361 i R PDR i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO: E-M1 UNIT NAME: J! iqs - 2 DATE: 3-13-92 COMPLET[0 BY: _L M. fatr TELEPHONE: _(114). 368-9J87 h0N1H: Februaryjl92 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWeNet) 1 1100.67 17 1106.00 2 19J811 18 1107 71 i 3 1109 21 19 1108.04 4 1094.83 20 1107 63 t 5 1110.ifz 21 }10P.04 q 6 U1).96 22 1197.00 7 1112.21 23 1106 17 8 1101.33 24 1196.50 9 1110.42 25 1105.13 10 1109.83 26 UO4.67 -11 1109:00 27 1100.75 12 1107 50 28 1095.75 l 13 1107.38 29 __J102.04 14 1101.46 15~ 1107.92 16 11.05.71 mor.feb/3 i _ ~ -... _ - _. - - - _ _ - _ _ - -,. -. -.

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-361 UNIT NMtE: SONGS - 2 REPORT MONTH: Februarv 1992 DATE: 3-13-92 COMPLETED BY: M. M. Farr TELEPHONE: (714) 368-9787 3 l Method of Shutting Cause & Corrective Duration Down LER System Component Action to l 2 3 No. Date Type (Hours) Reason Reactor No. Code

  • Code' Prevent Recurrence NA NA NA NA NA NA NA NA NA NA f

i I 1 i l l i i I t '[ I 3 I F-Forced Reason: Method: 'IEEE Std 805-1984 S-Scheduled A-Equipment Failure (Explain) 1-Manual i B-Maintenance or Test 2-Manual Scram. 'IEEE Std 803A-1983 C-Refueling-3-Automatic Scram. D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Administrative 5-Reduction in the Averaga 1 G-Operational Error (Explain) Daily Power Level of more H-Other (Explain) than 20's from the previous day i 6-Other (Explain) mor.febl4 ~

SUMMARY

Of OPERATING EXPERIENCE FOR THE HONTH DOCKET N0: _%-361 UNil NAME: 10L(G1 2 DATE: _3,,r-r COMPLETED BY: Mr M farr TELEPLIONE: _11_)4)368-9787 DJLig 1ime bin _t February 1 0001 Unit is in Mode 1 at 100% reactor power. Turbine load at 1040 MWe gross. 0015 lurbine returned to full load, 1155 MWe, 2215 ItP governor valve UV2200B tripped closed. Unit stabilized with SBCS. 2250 Commencej reactor power decrease to 93% to close SBCS valves. 2400 Reactor at 95% power, SBCS valves closed. february 2 0808 Commenced reactor power increase to 100% following UV2200B return to service. 1025 Reactor at 100% power. february 4 0120 HP governor valve UV2200B tripped closed. Unit stabilized with SBCS. 0135 Commenced reactor power decrease to 95% to close SBCS valves. 0220 Reactor at 95% power, SBCS valves closed. 0545 Commenced reactor power increase to 100% folle,'ing UV2200B return to service. 0645 Reactor at 100% power. February 29 2400 Unit is in Mode 1 at 100% reactor power. Turbine load at 1150 MWe gross. mor.feb/5

REr0ELING INFORMATION DOCKET NO: _5h]61 j UNIT NAME: SONES - ? DATE: 3-13-92 COMPLETED BY: __M. M_Ferr 1ELEPHONE: (714) 368-9787 HONTH: February 1992

1. Scheduled date for next refueling shutdown.

Cycle 7 refueling outage is forecast for May 1993.

2. Scheduled date for restart following refueling.

Restart from Cycle 7 refueling outage is forecast for July 1993.

3. Will refueling or resumption of operation thereafter require a Techni,al Specification change or other license amendment?

Not yet determined for Cycle 7. What will these be? Not yet detarmined.

4. Scheduled date for submitting proposed licensing action and supporting infoimation.

Not yet determined.

5. Important licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Not yet determined. l mor.feb/6

7 REFUELING INFORMATION DOCKET NO: _50-16] UNIT NAME: SONGS - 2 DATE: J-13-92 i COMPLETED BY: M. M. FAr.I TELEN10NE: _[1141 W 9787 MONTH: Febrgry_)33jL

6. lhe nutber of fuel assemblies, a)

In the core. 217 b) In the spent fuel storage pool. 554 (484 Unit 2 Snent fuel Ajsembjlth 70 _j) nit 1 Socal fpel _f_ng_mbIies). _..

7. Licensed spent fuel storage capacity.

1542 Intended change in spent fuel storage capacity. -1None

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately 2001 (full of f load capability) l' l l ? mor feb/7 i g --e m v T e*- e--*-y '-w-.1 ew-4 e7-y r- -n,---+-n- -9 e. p w-s-- w- + -q-aw-3 wr--ww----et+ WVut g

NRC HONTHLY OPERATING REPORT DOCKET NO: J0)fi 2 UNil NAME: J ORGS,. 3 DATE: _3-13-D i COMPLElli BY: _L M. farr 1ELEPil0NE: _(JJ4) 368-978_7 Qf[ RATING STATUS . Unit Narae: _, San _0nofrthuglut_Sfngrtblm Stajion. UJ11L3 t 2. Reporting Period: _Lt' iary 119L 3. Licensed thermal Power (MWt): 3)90 4. Nameplate Rating (Gross MWe): LR7 5. Design Electrical Rating (Net HWe)_: 103 1 _. 6. Maximum Dependable Capacity (Gross MWe):._U2 7 7. Maximum Dependable C6pacity (Net HWe):. 10S9 8. IfChangesOccurinCapacityRatings(itemsNumber3Through7) Since Last Report, Give Reason >: NA 9. Power Level To Which Restricted, if Any (Net MWe): f{& 10. Reasons for Restrictions, If Any: NA This Month Yr.-to Date Cumulative 11. Hours in Reporting Period .6 L QQ _,_, 1.440.0Q 3L101199_ 12. Number Of Hours Reactor Was Critical 0.00 _hh k e,__ 53.007.68 13. Reactor Reserve Shutdown Hours 0._00 JJQ 0.00 14. Hours Generator On-Line 0.00 569_J 2 _ 51 h49243 15. Unit Reserve Shutdown Hours _hpp __ .._q109. 0. 09., 16. Gross Thermal Energy Generated (HWH) OAQ_1Jp3J'923 d,_.,l21J04.44 17. Gross Electrical Energy Generated (MWH) 0.00 649.1716 dQ _561010J61199_ 18. Net Electrical Energy Generated (MWH) _(229EJ11_Jp4_.01Q 4Q J?J22145.69 19. Unit Service factor 0.00% 39.54%,, 74.Q3 20. Unit Availability factor 0 0D1 3L54% 14.43% 1 21. UnitCapacityfactor(UsingMDCNet) 0.00.3 38,#1) 70.623 22. Unit Capacity factor (Using DER Net; 0.003 30u8,1) 70.62% 23. Unit forced Outage Rate 0.00% 0.00% 7.67% 2a. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): [ysle 6 refuelina outaae commenced on January 2h 1992, in proaress. Outage duration scheduleri for 85 @_yL_ 25. If Shutdown At End Of Re;. ort Period, Estimated Date of Startup: Ap ri l 19,92__., 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY .NA NA INITIAL ELECTRICITY N A.__ NA COMMERCIAL OPERATION NA NA mor.feb/8

t AVERAGE DAILY UNIT POWER LEVEL 00CKL1 NO: _50.}st i UNIT NAME: _ SONGS - 3 DA1Et _3-13-92 COMPLEIED BY:,Jh h _[jrr IELENIONE: _.(714i368-9787 i MONTH: _Jd nuary 1992 I 1 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0.00 17 0.00. 2 0_. QQ_ 18 0.00 3 0.00 19 0.00 4 0.00 20 0.00 5 0a.qq._. 21 0.00 6 0.00 22 0.00 7 0.00 23 0.00 8 0.00 24 0.00 I 9 0.00 25 0.00 10 0.00 26 0.00 __. 11 0.00 27 0.00 12-0.q0 28 0.00 13 0.tq0 29 0__. 00 14 0 00 1 15-0.,,q0 1 16 0.00 t mor.feb/9 9 ~ ~ . \\.,,;. . ~. -,,....,~.,.,,...,,,,._..,,..,,_....r., ..,.,4,_.,,,,,..,, e r-~,._.-

4 3 8 8 9 9 1 1 e 5 A g 0 3 7 a 8 0 8 t 8 7 u d 9 o t d r e e S t 3 r 8 v c g S a 6 i n n E 2 F 3 t e E E y i 2 9 c r l E E a 6 S . ) eor e I E d 3 G 3 M 4 rt u u I - N 1 1 r c f S s 0 O . 7 one e eu 5 S 3 M ( CoR r ero i goi &tt 6 amv cn r e OEEYE eAe e ef r NMTBN s v l vop AA O u e c A TN iDH a r y m l e E EP C P C .o eeh KT TE mr h vt) CI EL afhte n ON LE . r t Lmi DU PT ncnnn oa M aSooirrl O r iM ef p C cct nw x Siasoo%E t t uuiP0( S n

ll anot 2

N e5 daamiicy r O ne o uuot vul ne I od A h nnt n e di a h T po N taauoraaht C 2 .mC eMMACPRDtO U 9 o M - - - - D 9 C 3 1234 5 6 E 1 R y m R r e'e E a td A W u O r so N P b yC e S n D F N o i A ta S N H n W T R. i O N Eo A m D O LN N ax T M E UH T ) e ) S RO n s n T P 'r i n i f a e a I E N R og o l c l U n t p ai p di n c x cL x ot w a E i E hto e 5 (t t& ( t uD R s c eh ee ig r MS rT rn o u ti r) 2n l r snern i o eivEi os a Rai a a Fe rt y T a 2. lo e c R C t ngr - r c nanorteE enit osi( mel atit n n pt el anar o )s 0 oinuurire s uif gemeh ir 0 t u a q a e e pd pt eEMRROA.OO a o 6 rH 9 R u 6 2 ABCDEFGH D( l epy S T e 4 t 2 d a 1 e D 0 l 0 2 d u 1 9 ed / c e b rh e o c f F S r S o o 3 F m N 6 I

t

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH DSCKET NO: _@-162 UNIT NAr4E:. SONGS - 3 DATE: _3_-13-92 COMPLETED BY: lej.Arr TELENIONE: J 714) R E2787 DMI Eme Eyini february 1 0001 Unit is in Mode 6, day 15 of the Cycle 6 refueling outage. february 5 0912 Conenenced core alterations and off loading. february 9 0804 Completed off loading the core. Alterations secured. February 19 0521 Conenenced reload of fuel assemblies into the reactor core. Entered Mode 6. Core alterations in progr'.ss. february 23 0800 Completed reloading the core. Alterations secured. february 26 0525 Completed installation of reactor head, february 27 2225 Entered Mode 5. February 29 2400 Unit is in Mode 5, day 43 of the Cycle 6 refueling outage. L mor.feb/ll l l

RETUJLING INf0kHATION DOCKET NO: Jh3fi? UNIT NAMEt _10f(GS_ - 3 DAlf. 3-13-92 i COMPLE1[D B); M J. farr TELEPHONE: 3,/141_318-9781_ MONTH: Februar1J192

1. Scheduled date for next refueling shutdown.

Cycle 6 refueling outage began January 24, 1992,

2. Scheduled date for restart following refueling.

Restart from Cycle 6 refueling outage is forecast for April 1992.

3. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes. What will these be? All license amendments associated with the Cycle 6 refueling mat.1ge have been approved.

4. Scheduled date for submitting proposed licensing action and supporting information.

Not applicable. .5. Ir.portant licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures. None. l l i l' mor.feb/12 ~

1 l l REFUELING INFORMATION DOCKET N0: JO-3(( UNIT NAME: J @ T-92 GS - 3 DATE: 3-1 COMPLETED BY: _!ju!!g[afr TELEPHONE: _(7141J08-9787 MONTH: February 1992

6. The number of fuel assemblies.

a) in the core. _ZJ b) In the spent fuel storage pool. _f>53 L4M_1Init 3 Spent In L hsemblieb _69 Unit I_Spfnt fuel Asssmtilies)

7. Licensed spent fuel storage capacity.

1542 _ intended change in spent fuel storage capacity. None

8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

Approximately2003(fulloffloadcapability) L mor.feb/13 ..}}