ML20090K954

From kanterella
Jump to navigation Jump to search
Applicant Exhibit A-49,consisting of Supplemental Insp Instructions for Fabrication of Electrical Cabinets
ML20090K954
Person / Time
Site: Catawba  
Issue date: 11/17/1983
From:
DUKE POWER CO.
To:
References
A-049, A-49, NUDOCS 8405240501
Download: ML20090K954 (1)


Text

._ _

_ _ ~ _

htl@

O f

DUKE POWER C0'APA N r CONS T R U CTION DE PA RT fAENT 5 8 f 801 "'

' h ' *

' of 0

PROJECT Catawba Remion no O

UPPLEMENTAL INSPECTION INSTRUCTIONS M

j I

E l e c t r i c a l Ca b i n e t M..,_C A D t a.rrT. V. D.. A A.T. M1 EQUIPMENT DESCRIPTION TYPE OF INSPECTION Fabrication N-MrsMDhfthnAM7R CATAWB(

l DOCUMENTATION REQUIRED M-41A

.,,no1 INSPECTION INSTRUCTIONS

  • h, 3,f;%kt,- gj swt w
,y t 1.

Inspect nuclear safety related weld n'accordanc % ),th QA Procedure M-21.

~

i QQ : '

2.

Verify that materials specified by design draw ngs are used in fabrication.

3.\\ Verify that components, equipment, and wire (size and type) specified by l

Design drawings are used.

4.

Verify that location of equipment, seismic bracing, blank cutouts, mounting channel, etc.,is in accordance with design drawings. This will be to " eyeball" accuracy, calibrated instruments are not required.

9.

Examine on a sampling basis, terminations for proper wire. skinning, insulation

~

5 crimp, lugs, tightness, etc.

j k

6.

Verify on a sampling basis that the proper tool (T & B type WT-145 ) is being used for terminations.

1"

' "" ' 9 J

=

7.

Verify that all wiring conforms to applicable se i3 1cri gr

,,s 8.

Verify that grounding is in accordance with applicable Design drawings.

9 Check components for obvious damage and free operation. g g g 10.

Check wiring for obvious damage (nicks, breaks, etc.). g g g g g l

' 11.

Inspect component and wire identification for comformance to Design requirements.

12.* Verify on a sampling basis that specified ' torque requirements are met.

Record type of device and serial number in remarks section of M-41 A when torquing is inspected.

13.

Verify correctness of wiring by point to point continuity test.,

14.

Inspection of items 2 thru 13 shall be documented by sign-off of the "QC Inspec-tor /Elec. blank of the M-41 A for each cabinet. The inspection of item I shall be documented by' sign-of f of the "QC inspector /NDE" blank of each M-41 A.

8405240501 831117 PDR ADOCK 05000413 i

0 PDR

?REPARED DATE

/

W77

/

.n i innnauii M

=

.fvm.//J11 /ll

l e

I l

I I

i

/

.l l

\\,

i f

/

/

/,

i u

'/

~i

/

,'/

/ / /

\\

/

/

t

/

l'

., ),. J,]/ / :'

/ -

,/

/ /

/f /

-,/

'>7,/

Id 9

.e m/

t,, / sx

/

,r Y',&w r(y 9'y / n i

W 4

ia

J

,. ' ef

\\

4)y i

,e

~. N+,

\\

i

. /,,'

l'

^

( -

,'M( ', '

f

\\

/

0 l

4: g,8 7

/

4%

',/,/

,/ x) i 4

i

(.. f i

0

/N

/

/

  • E 4

4

/

('

s' s "

Q l

i l

l l

l 4

-