Text
r
^
123 Mant Street WNta Pbim. New York 10601 914 681.62(E r~
- > NewYorkPbwer glim-4# Authority
"- o-July 24, 1984 JPN-84-49 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPa ick Nuclear Power Plant Docket No. 50-333 Amendment No. 80 to License No. DPR-59
" Surveillance Requirements for the High Pressure Water Fire Protection System".
Reference 3:
- 1. PASNY letter, J.P.
Bayne to D.B. Vassallo, dated October 28, 1982 (JPN-82-82) regarding the same subject.
- 2. NRC letter, H.I. Abelson to J.P.
Bayne (NYPA),
dated May 22, 1984 regarding the same subject.
Dear Sir:
The Authority submitted proposed changes to the FitzPatrick Technical Specifications via Reference 1.
The NRC subsequently issued these changes as Amendment No. 80.
This amendment clarified the surveillance requirements for the High Pressure Water Fire Protection System in Section 4.12.A.l.e (page 244a) to make the terminology consistent with the res.t of the Technical Specifications.
Our review of the approved changes, revealed that another change was inadvertently made to this same page (244a) during typing.
Specifically, pump test frequency was mistakenly changed from "Once/ month" to "Once/ week" in Section 4.12.A.b on page 244a.
This error was inadvertently introduced by the Authority in our amendment application; a change in pump test frequency was not.
intended.
This is supported by the fact that the safety evaluation included in Refarence 1 makes no mention of pump test frequency.
0N 0
B407270264 840724 PDR ADOCK 05000333
{
P PDR
~
./
' Attached is a copy'of page 244a marked up to indicate both the error and the correction.
Please reissue this page to reflect the correct fire pump test frequency.
In the interim, because this change was introduced.by error, the i~
Authority wil.1 continue to conduct this fire pump test once each
- month, if you have any questions concerning this matter, please contact Mr. J. A. Gray, Jr.- of my staff.
4 Very truly yours, J.
ay Executive Vice President Nuclear Generation State of New York County of Westchester subscribed and Swory to before me' this 3 / day of pt///
-1984..
JEANNE LA LUNA NOTARY PUSUC, STATE OF NEW YORK NO. 60-461430$
Q g j/
TERM EXPIRES MARCH 30th 19..gupTY QUAllflED IN WESTCHESTER C rn...
Notary Public cc:
Office of the Resident Inspector U.S.. Nuclear Regula'_ory Commission P.O. Box'136 Lycoming, New York 13093 P