ML20090E291

From kanterella
Jump to navigation Jump to search
NPDES Noncompliance Notification:On 911218,during Discharge of Full Flow Condensate Polishing Demineralizer Sump,Total Suspended Solids Exceeded Instantaneous Value of NPDES Permit.Extensive Cleanup of Sump Conducted
ML20090E291
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/28/1992
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9203090357
Download: ML20090E291 (4)


Text

f o..

I r u::

' ~ ~

Southern Califamin Edison Company FB l' Aim I H H t f4f:[ t IHVif dti, C AL if Of t? ilA pt716

" 't"%Z'2'l"'

,, l,'lT.'O.

m...,~.,m,-.,,_

february 28, 1992 U. S. Nuclear Regulatory Connission Attention: Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket No. 50-362 Report of NPDES Permit Violation, December 1991 l

San Onofre Nuclear Generating Station i

Unit 3 peference: January 29, l'392, letter from H. W. Newton (SCE) to A. L. Coe (California Regional Water Quality Control Board, San Diego Region),

Subject:

NPDES Mcr.itoring Report San Onofre Nuclear Generating Station Unit 3.

Section 3.2 of Appendix B to facility License No. NPF-15 for San Onofre Nuclear Generating Station (SONGS) Unit 3 requires Southern California Edison (SCE) to report violations of the National Pollutant Discharge Elimination System (NPDES) permit.

This letter reports one NPDES permit violation for Unit 3.

The referenced letter is provided as an enclosure.

There are 14 sampling locations for parameters required by the Units 2 and 3 NPDES permit.

In 10 of the 14 locations, sam) ling includes analyzing the samples for total suspended solids. On Decem)er 18, during discharge of the full flow condensate polishing demineralizer sump, the total suspended solids instantaneous value exceeded tne 100 mg/l NPDES permit limit by 31.7 mg/1.

Immed ute corrective action consisted of an extensive cleanup of the sump and certain temporary measures to_ ensure NPDES permit compliance.

Permanent corrective actions to prevent recurrence are expected to be completed this year.

I t

I 9203090357 920228 g

PDR ADOCK 05000362 0

PDC

as.,.,

f % :::

2-February 28, 1992 Document Control Desk If you have any questions, please contact me.

Very truly yours, l {'I'i Enclosure cc J. B. Martin, Regional Administrator, NRC Region V C. W. Caldwell, NRC Senior Resident inspector, San Onofre Units 1, 283 l

l l

_---v,,,

,-.....r..

..,e

..,.,, _ ~

s-

January 29, 1992 Mr. Arthur L. Coe California Regional Water Quality Contrel Board San Diogo Region 9771 Clairemont Mosa Boulevard, Suite B San Diego, California 92124-1331 Dear Mr. Coat

Subject:

NPDES Monitoring Report San onofre Nuclear Generating Station, Unit 3 The NPDES nonitoring reports for San Onofre Unit 3 covering the month of December is-submitted in accordance with the requiromonts of CRWQCD order 85-13 (NPDES Permit No. CA0108181).

A summary of the generating unit's status and significant-analytical results is provided below.

The unit was operational all month.

All sampled water sources were found to be within permit limits, with one exception.

On December 18, the total suspended solids instantaneous value of 100 ppm was exceeded during discharge of the Full Flow Condensate Polishing Demineralizer sump.

Laboratory analysis identified the problem as high resin dischargo to the sump systen.

Immediate corrective action consisted.of a major clean up of the sump and certain temporary naasures to ensure NPDES permit compliance.

Permanent corrective action to prevent reoccurrence is expected to be completed this year.

As you may be aware, in September of d

1991, a full-tine supervisor and additional manpower was assigned to more closely nonitor and control general environmental issues at San Onofre.

The preceding violation is a result of a detailed review of historical practices and methodologies relating to NPDES sampling techniques.

It should be noted that the monthly average for total suspended solids is below the allowed value, however, the calculated average results arc from both the old and new techniques.

4 4

J

=

Arthur L. Coe January 29, 1992

\\

Pursuant to Ordor No. 85-13, Reporting Requirement 12, your letter dated June 25, 1985, authorizes.the following representativo to sign and cortify all roports required by this order:

Arthur Knoisol, Environmental Engineer.

I certify under penalty of law that I have personally examinod and am familiar with tho information submitted in the attached document, and based on my inquiry of thoso-individuals immediately responsible for obtaining tho information, I believo the submitted information is truo, accurato, and complete._

I am aware that there are significant penalties for submitting falso information, including th3 possibility of fino and imprisonment.

H.

W.

Newton ak 91DEC3.HPD cc:

Environmental Protection Agency, Region IX bcc:

R. M. Rosenblum J. T. Reilly H. W. Newton /M. J. Johnson vL.