ML20090E082

From kanterella
Jump to navigation Jump to search
Forwards Licensee to M Resnikoff Clarifying Relationship Between Site Spent Fuel Situation & Safety of Plant Operation,In Response to 750404 Request
ML20090E082
Person / Time
Site: Nine Mile Point 
Issue date: 04/22/1975
From: Gavin E
FEDERAL POWER COMMISSION
To:
NRC
Shared Package
ML20090E051 List:
References
NUDOCS 8303110481
Download: ML20090E082 (2)


Text

-

o o

FEDERAL PowEn COMMISSION WASHf NGTON. D. C. 2 0426 l

April 22, 1975 j

orner or tsc cs4:asa,4 i

I Nuclear Regulatory Commission Washington, D. C.

20555 1

The attached is referred to your office I

as a matter coming under your jurisdiction.

Emmett J./Gavin Assistan't to the Chairman Enclosure

' ' ~ '

Ltr from Senator James' L. Buckley, dated April 18, 1975 2

l

/

8303110481 750514 PDR ADOCK 05000220 U

FDR

\\

,WDA@ ARA MOHAWK POWER CORPORATION _ _ - - _ - -

O

"'^= a a o

~~ O 300 ERIC DOULEVARD WCsf SYRACUSE. N. Y. 83JO2 April 2,1975 Dr. Marvin Resnikoff 174 West Avenue Buffalo, New York.14201

Dear Dr. Resnikoff:

Regulatory Commission, which begins with a stateI have e Nuclear ~

to my attention, through Dan Greene (sic) of Niment "it has come Reinert of Ecology Action of Oswego, that Nine Milagara Mohawk and Sue operating in an unsafe condition. "

e Point I may be

. ment is that I have made allegations to you with respect to theThe cle ottr Nine Mile Point facility.

safety of You have never contacted me directly on this mattNo you well know.

and frankly, I resent the tise of my name in this cont

, as e r, ext.

The interpretation of the spent fuel MSution u Ni v.np=:t ts sahty is strictly your own ne Mile Point with of the reactor vessel to keep the existing inventoryWe firmly believe that the virtually all operating conditions maintains required lof fuel cool under situation which might warrant removal of the core fo evels of safety. A or corrective maintenance, would allow time to con idr inspection purposes options.

maintain the core in.a safe shutdown condition indefinitelA s

are installed to y.

to safety is in error.In'short, your interpretation of the spent fuel situ ti a on with respect Si cerely, t

.h

,0 A DDG/ch Daniel D. Green cc: S. Reinert Manager - Corporate Information J. Buckley/

J. Javits L. Lefkowitz M. DeMichele 36j.3 Nuclear Regulatory Commission Rec'd Off. Cir.

03tg y [

n=a 9,,

-~ ~-

L

_ _ - -