James P. O'Reilly /
Directorate of Rebalatory Operations Region I 631. Park Avenue King of Prussia, Pennsyhania 19406 PT.0H Jersey Central Power G Light Company Oyster Creek Nuclear Generating Station Docket #50-2'.
Forked River, New Jersey 08731 A
SUBJECT
- Abnormal Occurrence Report No. 50-219/75/ 21 t
The following is a p2tlininary report being submitted in compliance with the Technical Specif.ications, paragraph 6.6.2.
t 4
Preliminary Approval:
Q
/
P/
<muf r-
. t. Carroll, Jr.
Date S 75 CC: Mr. A. Giambusso f
g W --
=_
o l
8302250449 750804 l
PDR ADOCK 05000219 l
S PDR
r y
~
O O
~
- 3 -
Initial Telephone Date of
.= Report Date:
8-1-75 Occurrence:
8-1-75 Initial h~ritt en Time of Report Date:
8-4-75 Occurrence:
10:40 OYSTER CREEK NUCLEAR CENERATING STATION FORKED RIVER, NEW JERSEY 08731 Abnormal Occurrence Report No. 50-219/7A/ 21 5
,t.,
IDENTIFICATION
< Failuro of isolction consenser systen 5 stema mane valve OF OCCURRENCE:
close on simulation of a high steam line (V-14-32to flow signal This event is considered to be an abnormal occurrence as de-fined in the Technical Specificaticns, paragraph 1.15 DEG.
CCNDITIDSS PRIOR 1 Steady State Power Routine Shutdown TO OCCURRENCE:
Hot Standby Operation Cold Shutdeen Load Changes During Refueling Shutdown Routine Power Operation Routine Startup Other (Specify)
Operation s
P'o v e r :
Core 1661 MWt Electric 549 MWe Plow:
Recire.
15.S x 104 GPM Pecd.
6.04 x 106 IB/HR
-' Stack Gas 10 800 o C 1, nec DESCRIPTIE OF N On Friday, August 1.
1975, at approximately 10:40 while perforcing routine surveillance on the "B"
isolation condenser systen, steam line valve V-14-32 failed to close on simulation of stean line high flow.
The motor operated isolation valves and condensate make up valves on."A" isolation condenser were tested for operability and V-14-32 was closed manually.
Further investigation revealed that V-14-32 had failed to close because the motor operator torque switch had tripped.
The failure of V-14-32 to close is attributed to a low setting for the motort0Perator torque switch.
The setting for the increased to a higher valve within the
~
torque was recommended manufactuger's rzuge( The valve was. check ed-*
- Perable and "B" isolation condenser was returned to service.
~
. & n_ -.
b
= + - - -.
9, 6
13 n-
- i s
O-O drt No.50-21J' /75/ 21
'RD T CAUSE Design lCCIITJtC;CE:
X Procedure tianufacture q
Unusual Service Condition p
Installation /
Inc. Environmental y
Construction Component Faf:ure Operator L
Other (Specify) i a
.YSIS OF MCE:
The signigicance of this event was a loss of' redundancy for "B" isointion condenser to isolate on steam lino high flow.
The other valves in the system had demonstrated their operability during the surveillance.
In addition "A" j
isolation condenser system was checked operable and would i
have performed the purpose of the system had it been needed.
Q w
a, t
s liCTIVE M:
The setting for V-14-32 notor operator torque switch was
~~
increased and the valve was retested.
Further corrective action is under investigation.
ii
(
.itE DATA:
?
i tred by:
Jim Edelhauser.
Date:
August 4, 1975 i