ML20090C529

From kanterella
Jump to navigation Jump to search
Informs of Correction to Re post-accident Backup Sampling Capability Open Item 8135-27.Open Item Number Referenced Incorrectly as 8135-02
ML20090C529
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/30/1984
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
LIC-84-153, NUDOCS 8407130333
Download: ML20090C529 (1)


Text

_ _

i Omaha Public Power District 1623 Harney Omaha. Nebraska 68102 402/536-4000

'd May 30, 1984 LIC-84-153 3 M@MDMM %

)

Mr. Richard P.

Denise, Director k

M - d l984 Division of Resident, Reactor Project and Engineering Programs I

U.

S.

Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

References:

(1)

Docket No. 50-285 (2)

Letter to R.

P.

Denise from W. C. Jones dated April 23, 1984 (LIC-84-099)

Dear Mr. Denise:

Post Accident Backup Sampling Capability Open Item 8135-27 In a letter dated April 23, 1984, the District provided you the re-sults of its evaluation of the post accident backup sampling cap-abilities.

The open item number referenced in that letter was in-correctly stated as 8135-02 instead of 8135-27.

Sincerely,

' }IN W.

C.

ones Divis1'on Manager Production Operations WCJ/JJF:jmm cc:

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 l

l Mr.

E.

G.

Tourigny, Project Manager a\\.0 Mr.

L.

A.

Yandell, Senior Resident Inspector j-y fd e

/

f,/

8407130333 840530 PDR ADOCK 05000285 p

PDR 45 5124 Employment with Equal Opportunity Mate / Female