ML20090B326

From kanterella
Jump to navigation Jump to search
Fowards Semiannual Radioactive Effluent Release Rept for Jul-Dec 1991 & Dose & Curie Corrections for 1988-1990
ML20090B326
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/28/1992
From: Lyster M
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20090B330 List:
References
NUDOCS 9203030331
Download: ML20090B326 (1)


Text

e CENTERIOR ENERGY I i s' PERRY NUCLEAR POWER PLANT Michael D. Lyster 10 CE N1t n nOAD PEnHY, OHto 44001 VICE Pnr5 00N1. NUCLF An etnnf. Onio 44081 RIN m 3m l'eb t oa t y 28. 1992 PY CEl/NRR4402 L U.S. IJuclear Regulatoty Commission Document Centtol Desk Vashington, D. C. 20555 Petiy Nuclear Power Plant Docket lio. 50 440 Semiannual Radinactive Effluent Release Repott Centlement Ve are hereby submitting the Semiannual Radioactive Effluent Release Report for the Perty Nuclear Povet Plant, Unit I for the period of July 1, to December 31, 1991. This report meets the sequ.rements of Regulatory Guide 1.21, as applicable to the Perry Technical Specification, Section 6.9.1.7 All effluent t eleases vete within the concentiation and t elease limits specified in the Radiological Effluent Technical Specifications.

At the time thir tcport was generated, the fourth quarte: analysis results for Sttontium-09/90 d lion-55 vete not available. These results vill be repotted in the nxxt Semiannual Radioactive Effluent Release Repott.

Also, this report includes cortections to the Semiannual Radioactive U fluent Release Reports !or ieporting perlods betveen January 1988 through June 1991.

This resulted vhen it was determined on June 5, 1991, that the effluent system

/ flow rate monitor for the Tut hine flullding/lleate Bay 11ullding vent radiation monitor had been inopetable during tvo fan opetation since the summer of 1988 (reference Licensee Event kepott 91-012). These corrections vote made for the time periods when the flow monitor reeding diffeted from the actual flow reading by greater than 10 percent (see page 13 and Attachment 10).

If you have any questions, please f ee .' face t o e,t i l .

Sincerely,

~(k LL ll 0

Michael D. Lystet o

mN re o n.

MDL:AllL ss m '

U .;.

. OV*1( ') 4 rdo Q

0~ o Attachment q cci NRC Project Managet g NRC Resident Office '

on NRC Region 111 7

n S. Focht - ANI ,

rb f(j  ;

o a o:

y, ,

J