Amend 36 to License NPF-5,extending Time Period for Operation W/One Inoperable LPCI Invertor
ML20088A940
Person / Time
Site: Hatch 
Issue date: 03/27/1984
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Georgia Power Co, Oglethorpe Power Corp, Municipal Electric Authority of Georgia, City of Dalton, GA
Shared Package
ML20088A941 List:
References
TAC 48297, NPF-05-A-036 NUDOCS 8404130353
Download: ML20088A940 (5)


Text

-

'o

',NITED STATES

^

NUCLEAR REGULATORY COMMISSION o

{

,I WASHINGTON, D C. 20446

\\*****/

GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-366 EDWIN !. HATCH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 36 License No. NPF-5 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The application for amendment by Georgia Power Company, et, al.,

(the licensee) dated April 5,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (1) that the activities authorized by this amenoment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common oefense and security or to the health and safety of the public; and E.

The isevance of this amendment is in accordance with 10 CFR Part 51 cf the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Spec-ifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-5 is hereby amended to read as follows:

Technical Soecifications The Technical Specifications contsined in Appendices A and B, as revised through Amendment No. 36, are hereby incorporated fa the license. The licensee shall operate the facility in accordance with the Technical Specifications.

5404130353 040327 PDR AOC,CM OS0003M

/

P PH j

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMISSION a

I Jo n F. Stolz. Chief erating Reactors Branch #4 ivision of Licensing

Attachment:

Changes to the Technical Specifications

]

Date of Issuance:

March 27,1984 l

a i

r i

i i

{

l t

4 1

i.

l 1

i 4

s B

i

/

  • j

t 1

l ATTACHMENT TO LICENSE AMENDMENT N0. u 1

]

FACILITY OPERATING LICENSE N0. NPF-5 i

DOCKET N0. 50-366 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change. The corresponding overleaf page is provided to maintain document completeness.

a i

i Remove

Insert-l 3/4 8-10

, 3/4 8-10 l

I i

a i

l I

l

)

1

)

j

}

i l

i i

1

/

l

s s

s 4

ELECTRICAL POWER. SYSTEMS A.C. SOURCES - SH'UTDOWN

~

~

LIMITING CONDITION FOR OPERATION t

3. 8.1. 2 As a minimum, the following h.C.. electrical power sources shall be OPERABLE:

One circuit between the offsite transmission network and the a.

onsite Class 1E distribution system, and b.

One diesel, generator with:

A day tank containing a minimum bf'900 gallons of' fuel, 1.

2.

A fuel storage tank containing a minimum of 32,000 gallons of fuel, and x

o 3.

A fuel transfer pump.

1 APPEICABILITY: CONDITIONS 4 and 5.

ACTION:

4 With less than the above required A.C. electrical power sources OPERABLE, i

suspend all operations involving CORE ALTERATIONS, irradiated fuel handling, positive reactivity changes.or operations that have the pctential of draining the peactor vessel.

tion 3.0.3 are not applicable.

The provisions of Specifica-

,s i g.

SU?.'EILLANCE REOUIREMENTS N

4.8.1.2 At least the above required A.C. electrical power sources shall be demonstrated OPERABLE per Surveillarice? Requirements 4.8.1.1.1, 4.8.1.1.2, except for the requirement of 4.8.1.1.2.a.S. 4.8.1.1.3 and

4. Ew.1.1. 4.

s Fh%

1 4

j y

HATCH - UNIT 2 3/4 8-9'

~

_____y-

.y-w---

w*

T-w'"--

~ ~ ' ' " ' '

ELECTRICAL POWER SYSTEMS 3/4.8.2 ONSITE POWER OISTRIBUTION SYSTEMS A. C.

DISTRIBUTION - OPERATING

, c,

. LIMITING CDM)ITION FOR OPERATION 3.S.2.1 The following A.C.

distribution system

buses, inverters and i

motor-generator (MG) sets shall be OPERABLE with breakers open between redundant buses:

a.

4160 volt Essential Buses 2E, 2F, and 2G, b.

.600 volt Essential Buses 2C and 20, c.

120/208 voit Essential Cabinets 2A and 28, i

d.

120/208 volt Inst:ument Buses 2A and 28, and e.

A.C. inverters 2RA4-5002 and 2R44-5003.

AP=LICASILITY: CONDITIONS 1, 2 and 3 ACTION:

a.

With one of the inverters in 3.8.2.1.e inoperable, restore the inverter' to an OPERABLE status within a period not to exceed seven (7) consecutive days or be in at least FOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and be in COLD SHJTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With one of the above reouired A.C.

distribution system buses l i

inoperable, restore the inoperable bus to OPERABLE status within 8

l hours or be in at least FOT SHJTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHJTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With two or more of the aDove required A.C. distribution system buses l c.

inverters inoperable, restore at least all except one of the

.or inoperable buses and inverters to CPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLO SHJTDOWN i

within the following 24 tours.

l SURVEILLANCE REQUIREMENTS

4. 8.2.1 The above required A.C. distribution system buses and inverters shall l

De cetezmined OPERABLE:

I i

a.

At leas.t once per 7 days by verifying correct breaker alignment and indicated power availability, and b.

At least once per 31 days by determining that the 250 valt DC/600 volt AC inverters 2R44-5002 and 2RAA-5003 are OPERABLE by verifying inverter output voltage of 600 volts : 5".while sucalying their respective buses.

HATCH - UNIT 2 3/4 8-10

^n.ic.. it No. M. 36, l