Interim Deficiency Rept DER 83-76 Re Logic for Auxiliary Feedwater Pump Turbine Steam Supply Valves Being Contrary to FSAR Requirements.Initially Reported on 831102.No New Info Available.Next Rept Will Be Submitted by 840518
ML20088A811
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/23/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29140-BSK, DER-83-76, NUDOCS 8404130155
Download: ML20088A811 (2)


Text

_ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _. _ _ _ _ _ _ _ _ _ _ _,

Arizona Public Service Company March 23,1984 A NPP-2 9140-BSK/1RB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maris Lane - Suite 210 Walnut. Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-76 A 50.55(e) Potentially Reportable Deficiency Relating To The Logic For The Auxiliary Feedwater Pu.np Turbine Steam Supply Valves Is Contrary To FSAR Requirements l

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. Dodds and R. Tucker on November 2, 1983 (B) ANPP-28360, dated December 5, 1983 (Interim Report)

(C) ANPP-28588, dated January 10, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potencia11y reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by March 30, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this infot*ation will be finalized by May 18, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly youts; ec

+

C E

CLLt \\

ottt m

E. E. Van Brunt, Jr.

S APS Vice President, Nucicar ANPP Project Director EEVB/TRB:ru il!+/ O$ L'gj g ec: See Page Two ClkT 'i~::t 8404130155 040323 I

PDR ADOCK 05000320 g l 8

pon

/g_g7

Mr. T. W. Bishop DER 83-76 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

W. E. Ide D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J. R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen C. A. Flore111 S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway Suite 1500 Atlanta, CA 30339