ML20088A181

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 1 to License NPF-18
ML20088A181
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 03/23/1984
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20088A179 List:
References
NUDOCS 8404110144
Download: ML20088A181 (6)


Text

.

o

[7590-01]

UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET N0. 50-374 COMMONWEALTH EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE On December 16, 1983, the U. S. Nuclear Regulatory Commission (the Commission) issued Facility Operating License No. NPF-18, to Commonwealth Edison Company (licensee), authorizing operation of the La Salle County Station, Unit 2 (the facility), at reactor core power levels not in excess of 166 megawatts thermal (5 percent power) in accordance with the provisions of the license, the Technical Specifications and the Environmental Protection Plan.

The Commission has now issued Amendment No.1 to Facility Operating License No. NPF-18, which authorizes operation of the La Salle County Station, Unit 2, at reactor core power levels not in excess of 3323 megawatts thermal (100 percent power) in accordance with the provisions of the amended license.

La Salle County Station, Unit 2 is a boiling water nuclear reactor located in Brookfield Township, La Salle County, Illinois. The amendment is effective as of the date of issuance.

The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as ' amended (the Act), and the Commission's regulations. The Commission has made appropritt.e findings -

as required by the Act and the Commission's regulations in 10 CFR Chapter I, which are set forth in the amended license.

Prior public notice of the overall action involving the proposed issuance of an operating license was published in the Federal Register on June 9, 1977 (42 F. R. 29576-29577).

B404110144 840323 PDR ADOCK 05000374 p

PM

f7590-01] 2 The increase in power level authorized by this amendment is encompassed by that prior public notice.

The Commission has determined that the issuance of this amendment will not result in any significant environmental impacts other than those evaluated in the Final Environmental Statement and its addendum.

For further details with respect to this action, see (1) Amendment No. I to Facility Operating License No. NPF-18; (2) Facility Operating License No. NPF-18 dated December 16, 1983, authorizing five percent power; (3) the report of the Advisory Committee on Reactor Safeguards dated April 16, 1981; (4) the Commission's Safety Evaluation Report (NUREG-0519) dated March 1981, Supplement No. I dated June 1981, Supplement No. 2 dated February 1982, Supplement No. 3 dated April 1982, Supplement No. 4 dated July 1982; Supplement No. 5 dated August 1982, Supplement No. 6 dated November 1983, Supplement No. 7 dated December 1983, and Supplement No. 8 dated March 1984; (5) the Final Safety Analysis Report and amendments thereto; (6) the Environmental Report and Supplements thereto; (7) the Final Environmental Statement dated November 1978 and the Addendum to the Final Environmental Statement dated May 1981; and (8) NRC Flood Plain Review l

of La Salle Nuclear Plant Site dated January 29, 1981.

l l

i

f7590-01] These itens are available for public inspection at the Comission's Public Document Room, 1717 H Street, NW, Washington, DC 20555, and the Public Library of Illinois Valley Comunity College, Rural Route No.1, Oglesby, Illinois 61348. A copy of Amendment No.I to Facility Operating License No. NPF-18 may be obtained upon request addressed to the U. S.

Nuclear Regulatory Commission, Washington, DC 20555, Attention: Director, Division of Licensing. Copies of the Safety Evaluation Report and its Supplements 1, 2, 3, 4, 5, 6, 7 and 8 (NUREG-0519) may be purchased at current rates from the National Technical Information Service, U. S.

Department of Comerce, 5238 Port Royal Road, Springfield, Virginia 22161, and through the NRC GP0 sales program by writing to the U. S. Nuclear Regulatory Comission, Attention:

Sales Manager, Washington, DC 20555.

GP0 deposit account holders can call (301) 492-9530.

Dated at Bethesda, Maryland this 23rd day of March 1984.

FOR THE NUCLEAR REGULATORY COMMISSION

/

NY$

. Schwencer, Chief Licensing Branch No. 2 Divisio7ofLicensing DL:LB#2/PM DL:LB LA kE DL:L C

ABournia:kw E

on

' (cyde#

ASchwencer-3/#/84 3

4 3/y8 3/g/84

W231Bs

.. DISTRIBUTION:_

Document Controli NRC POR L PDR NSIC PRC LB#2 Rdg.

E. Hylton A. Bournia A. Schwencer T. M. Novak D. G. Eisenhut J. Saltzman, SAB C. Woodhead, OELD C. Miles H. R. Denton J. Rutberg A. Toalston J. M. Taylor, DRP:IE E. L. Jordan, DEQA:IE L. Harmon, IE File D. Brinkman, SSPB T. Barnhart (4)

W. Miller M. Duncan L

I 4

m.

x - - --

p %g ss

(

["

k ISTRIBUTION:

5 N

UNITED STATES Docum;nt Control o,

NUCLEAR REGULATORY COMMISSION LB#2 Rdg.

  • +,***** o WASHINGTON, D.C. 20555 EHylton ABournia March 28,1984 FIngram, PA Docket No. 50-374 Docketing and Service Section Office of the Secretary of the Commission

SUBJECT:

NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE -

LA SALLE COUNTY STATION, UNIT 2 Two signed originals of the Federal Register Notice identified t'elow are enclosed for your transmittal to theOffice of the FederalRegisterforpublication. Additionalconformed copies ( 6 )of the Notice are enclosed for your use.

O Notice of Receipt of Application for Construction Permit (s) and Operating Ucense(s).

O Notice of Receipt of Partial Application for Construction Permit (s) and Facility License (s): Time for Submission of Views on Antitrust Matters.

O Notice of Availability of Applicant's Environmental Report.

O Notice of Proposed issuance of Amendment to Facility Operating Ucense.

O Notice of Receipt of Application for Facility License (s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility Ucense(s) and Notice of Opportunity for Hearing.

O Notice of Availability of NRC Draft / Final Environmental Statement.

O Notice of Umited Work Authorization.

O Notice of Availability of Safety Evaluation Report.

1 O Notice of issuance of Construction Permit (s).

XO Notice of issuance of Facility Operating Ucense(s) or Amendment (s).

O Other:

Office of Nuclear Reactor Regulation

. As Stated g:p on ce--.-

IHyitony su==r-.-

o m --.- 3/27/84 nac ro-im 7 n eW mn

e

,e W 2 8 jgs yfeDISTRIBUTION: m,.

le Det.ument;GentretS NRC PDR L PDR NSIC PRC LB#2 Rdg.

E. Hylton 4

A. Bournia i

A. Schwencer T. M. Novak D. G. Eisenhut J. Saltzman, SAB C. Woodhead, OELD C. Miles H. R. Denton J. Rutberg A. Toalston J. M. Taylor, DRP:IE E. L. Jordan, DEQA:IE L. Harmon, IE File D. Brinkman, SSPB T. Barnhart (4)

W. Miller M. Duncan 4

s O

e t

a