ML20088A178
| ML20088A178 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 03/23/1984 |
| From: | Eisenhut D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20088A179 | List: |
| References | |
| NUDOCS 8404110137 | |
| Download: ML20088A178 (2) | |
Text
_ _ _ _ _ - - _ _
MT UNITED STATES y
N NUCLEAR REGULATORY COMMISSION 3
g wasainoton. o. c. 20sss o
/
- s.**
COMMONWEALTH EDISON COMPANY DOCKET N0. 50-374 LA SALLE COUNTY STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE License No. NPF-18 Amendment No. 1 1.
The U. S. Nuclear Regulatory Comission (the Commission or the NRC) having found that:
A.
The application for license by the Commonwealth Edison Company (licensee), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the regulations of the Commission; C.
There is reasonable assurance:
(i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, for the Facility Operating License No. NPF-18, paragraphs 2.C.(1), and 2.C.(15) are hereby amended to read as follows:
(1) Maximum Power Level The licensee is authorized to operate the facility at reactor core power levels not in excess of full power' (3323 megawatts thermal).
Items in Attachment 1 shall be completed as specified. is hereby incorporated into this license.
[O 4
P A
~
. (15)
Fire Protection Program (Section 9.5, SER, SSER #2, SSER #3, SSER #5, SSER #7, SSER #8)
(e)
Prior to startup after the first refueling outage, the licensee shall replace approximately 110 feet of four-inch pipe feeding the spinkler system in the cable spreading room with six-inch pipe to effectively reduce the friction loss.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION OMainal 81gned by:
Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation Date of Issuance: MAR 2 3 934
?
0'DL 6b
/
DL:LB#2/PM DL:L (/LA DL.LB#2/BC QEL,D L: /L ABournia:kw E
on ASchwencer W:1 "Iovak D
enhut 3pC/84 3/). 84 3/y3/84
/7/84 3/
84
/84 7
h/"h m,, y e n p%
. >a<
Y Sa~
/
c E) k
_