8' so-99 Arizona Public Service Company
%Q March 28, 1984 ANPP-29177-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park' 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T..W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 83-64 A 50.55(e) Potentially Reportable Deficiency Relating To Pressure Re. lief Valves.By Target Rock Failed to Meet Pre-Requisite Tests.
Ffle: 84-019-026; D.4.33.2 led $.w: D.) Telephone conversation between P. Johnson and R. Tucker on Septerher 28, 1983 (B) 3NPP-20096 dated, October 26, 1983 (Interim Report)
(C)~ ANPP-28371 dated, January 26, 1984 (Time Extension)
(D) ANPP-28'966 dated, February 29, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B),
and a Time Extension was requested by Reference (C) and (D). At that time, it was estimated that a Final Report would be available by April 2, 19.84.
'E Du_e to the extensive investigation and evaluation required, it is now expected that this information will be finalized by May 29, 1984, at a
3,.
which time a complete report will be submitted.
Eip g
7 y"
There is}no new information or change to the Interim Report at this time.
~
c C-Very truly yours, E2. m hnuu 8404090209 840328 E. E. Van Brunt, Jr.
PDR ADOCK 05000528 S
PDR APS Vice President, Nuclear ANPP Project Director
'EEVB/TRB:db-cc: See Page Two
/[ -2 [
'l"
'Le Mr. T. W. Bishop DER 83-64 Page Two cc:
-Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.
W. E. Ide D.- B.-Fasnacht A. C. Rogers B. S. Kaplan L. A. Souza J. Vorees J. R. Bynum P.- P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster
. D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Self D. Canady.
Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 i
-_