Responds to Varga Requesting Schedule for Addl Info Re Inadequate Core Cooling Instrumentation (Icci) Sys. Icci Status Rept Will Be Made Available in Jul 1984
ML17334A505
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/03/1984
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:0761B, AEP:NRC:761B, NUDOCS 8402070124
Download: ML17334A505 (3)


Text

REGULATJRy INFORMATION DISTRIBUTION SVSTF1~

(R IDS)

ACCESSION Nt3R:840207012~

DOC.DATE:

8 /02/03 NOTARIZED: 'O F<CIL:50 315 Oonala C,

Coo< ><uclear Power Plant~

Unit 1< Indiana 50 316,Donald C.

Cooc Nuclear Power Planti Unit 2i Indiana AUTH ~ NARK AUTHOR AFFiLIATION ALKXICH<td~ P.

Indiana 8 Michigan Electr ic Co ~

RECIP ~ NA<lK RECIPIENT A~F ILI4TION DENTONzH ~ RE Office of Nuclear Reactor Regulationr Director

SUBJECT:

Responds to Yarga 83lP.19 ltr requesting schedule for adal info re inadequate cor e cooling instt umentation (ICCI) sos.

ECCL status rept will be made available in Jul 198'ISTRIBUTION COOK-A002S COPIES RECEEYEDgLTR ENCL ~

SIZE:

TITLE:

OR Suomi t ta 1 t Inadequate Core Cooling (Itern II~ F ~ 2)

GL 82

?8 VOTES:

DOCKET 0500 315 5000316 RECIPIENT ID CODE/NAXE NRR ORB1 BC WIGG INGTON p D (NTKRNAL: NRR SHEAtJ '1 NRR/GHFS/PSRB16 NRR/OL/ORB5 NRR/DSI/CPB 10 NRR/DSI/RSB 13 RGN3

. 07 COP IES LTTR ENCL RKC IP IKNT IO CODE/NARK NRR ORB1 LA NRP/DHFS/HFEB15 NRR/DL/ORAB 08 NRR/DS I OIR 09 JICSB 1~

G FIL 0~

COPIES LTTR ENCL 1

1 1

-"XTERNAL ACRS 17 NRC.

PDR 02 NTIS 05 10 1

1 1

LPOR NSIC 03 06 TnTAI NUgBER OF COPIES HEQUIRED:

LTTR 31 ENCL

INDIANA 8 N ICHI 6 AN ELECTRIC CON PANY P.O. BOX 1663)

'OLUMBUS, OHIO 43216 February 3,'984 AEP: NRC: 0761B Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 INADEQUATE CORE COOLING ZNSTRUMENTATZON; PRELIMINARY RESPONSE TO REQUEST FOR ADDITZONAL INF01MTION Mr. Harold R. Denton, Director Office of" Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Denton:

This letter provides a preliminary response to Mr. S. A. Varga's letter dated December 19,

1983, which transmitted to Mr. John E. Dolan of'he Indiana 5 Michigan Electric Company (IMECo) the NRC's preliminary Safety Evaluation (SE) of the Inadequate Core Cooling Znstrunsntation (ICCI) system for the Donald C. Cook Nuclear Plant Unit Nos.

1 and 2.

More specifically, Mr. S. A.

Varga's letter requested that we provide a schedule for submission of additional. information on the subject XCCI system, whioh oonsists of' Reactor Vessel Level Instrumentation System (RVLIS), Core Exit Thermocouples (CETs),

and a Subcooling Margin Monitor (SMM).

We believe that we can best respond to the concerns outlined in the preliminary SE via transmittal to the NRC, in July 1984, of an ICCI system status report.

Zn particular, the report we will submit during July 1984 will address the items included in Enclosure 1 of Mr. S. A. Varga's letter referenced above.

The July 1984 report will be in addition to the status report on Regulatory Guide 1.97 items which will be transmitted to your off'ice in February 1985.

We also note that the NRC's.preliminary SE requested that ten (10) milestones relating to implementation of'he RVLZS, as outlined in Enclosure 2

to the SE, be incorporated into the implementation schedule for the Donald C.

Cook Nuclear Plant.

These milestones will be considered in the preparation of the July 1984 status report, along with the schedule we have already defined for implementation of upgraded Emergency Operating Procedures t.see our letter No. AEP:NRC:0773D, dated January 30,

1984, Mr. M. P. Alexich (IMECo) to Mr. H.

R. Denton (NRC)].

Any special items which we may believe to require regulatory interpretation/review will also be identified in the July 1984 status report.

8402070124 840203 PDR ADQCK 05000315 P

PDR gd4'+

i/g

" Mr. fiarold R. Denton AEP:NRC:0761B This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, P

A'i.ex1eh I<

Vice President MPA/dam cc:

John E. Dolan W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff E. R. Swanson

>> NRC Resident Inspector, Bridgman