Monthly Operating Rept for Feb 1984
ML20087M664
Person / Time
Site: Cooper Entergy icon.png
Issue date: 02/29/1984
From: Ballinger P, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNSS840085, NUDOCS 8403300150
Download: ML20087M664 (5)


Text

,

j OPERATING DATA REPORT l

050-298 DOCKET DATENO. __ 3-6-84 .

COMPLETED BY P. L. Ballinger TELEPHONE 402-825-3811 OPERATING STATUS Cooper Nuclear Station Notes-

1. Unit Name:
2. Reporting Period: February, 1984 2381
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 836
5. Design Electrical Rating (Net MWe): 778
6. Maximum Dependable Capacity (Gross MWe): 787
7. Maximum Dependable Capacity (Net MWe): 764
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions,If Any:

This Month Yr. to.Date Cumulative

11. Hours In Reporting Period 696.0 1,440.0 84,745.0
12. Number Of Hours Reactor Was Critical 696.0 1,414.0 68,417.0 O.0
13. Reactor Reserve Shutdov.n Hours 0.0 0.0
14. Hours Generator On-Line 696.0 1,396.6 67,314.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1,459,992.0 2,838,504.0 133,351,662.0
17. Gross Electrical Energy Generated (MWH) - 491,010.0 963,123.0 42,369,478.0
18. Net Electrical Energy Generated (MWH) - - 469.584.0 921,681.0 40,83R,340.0
19. Unit Service Factor 100.0 97.0 79.4
20. Unit Availability Factor 100.0 97.0 79.4
21. Unit Capacity Factor (Using MDC Net) 88.3 -

83.8 63.1

22. Unit Capacity Factor (Using DER Net) 86.7 82.3 61.9
23. Unit Forced Outage Rate- - 0.0 3.0 3.8 A
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Eacht:

Maintenance. April 7. 1984, 10 davs.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY .

COMMERCIAL OPERATION - I 8403300150 840229 PDR ADOCK 05000299 R PDR _ to/77:

gtj

. .3 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-298 UNIT CNS DATE 3-6-84 COMPLETED BY P.L. Ballinger TELEPHONE 402-825-3811 MONTH February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 424 695-37 2 648 gg 704 3 638 602 39 4 658 705 20 5 612 7II 21 6 756 713 22 7 790 712 23 8 778 689 24 9 707 710 25 10 707 26 604 11 705 700 27 12 594 687 23 13 705 '707 29 14 718 30 15 701 3, 16 704 l

l t .

INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)-

f L -

DOCKET NO. 050-298 UNITSilUlDOWNS AND' POWER REDUCTIONS UNIT N AME CNS DATE 3-6-84 P.L. Ballinner COMPLETED BY REPORT MONTil February TELEPflONE 402-825-3811 "i

5" ei 3 to 3 .

Licensee

c. Cause & Co rective

, .=

E e s 7 .s 'A 5%

Action to No. Date g 3g 3- ,3 g 5 Event u?

N0 E.3 l'revent Recurrence

  • $~ 5 j di j Report n fU 6

(NONE DURING RE:'ORTD G PERIC D)

Y b

G r

l 3_ 4 I 2 .

F: Forced . Reasori: ' Method: Exhibit G Instructions A Equipment Failure (Explain) 1-Manual for, Preparation of Data S:' Scheduled B-Maintenance of Test ' 2 Manual Scram. Entry Sheets for Licensee

, C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.

D-Regulatory Restriction 4 Other (Explain) 0161)

E Operator Training & License Examination 5

F Administrative G-Operational Error (Explain) - Exhibit I Same Sourec

..19/77) Il-Other (Explain) +

\

Operations Narrative Cooper Nuclear Station February, 1984 The plant operated the month of February with no scheduled or unscheduled shutdowns or power changes. A capacity factor of 86.7% was achieved for the month of February.

l

. ')

" ^ '

COOPER NUCLEAR STATION 1 ..

Nebraska Public Power District "

"" " * "A"ER?*o"7#s %"".^I^ "

CNSS840085 '=-

March 7, 1984 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Monthly Operation Status Report for February 1984 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for February 1984. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, P. V. Thomason Division Manager of Nuclear Operations

[ j PVT:lb I l Enclosure I cc: G. D. Watson w/ enc.

A. C. Gehr w/ene.

J. T. Collins w/ enc.