OERATING DATA EPORT D0CKET N0. 50-275 DATE 03/02/84 COMPLETED BY W.J. Kelly TELEPHONE (805)595-7351 OPERATING STATUS

1. Unit Name: Diablo Canyon Unit 1
2. Reporting Period: February 1984 Notes:
3. Licensed Thermal Power (MWt): 166.9
4. Nameplate Rating (Gross MWe): 1170 __
5. Design Electrical Rating (Net MWe): 1084
6. Maximum Dependable Capacity (Gross MWe): 1134 _
7. Maximum Dependable Capacity (Net MWe): 1084
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe): 10. Reasons For Restrictions, If Any: Awaiting granting of low power test permit by the Nuclear Regulatory Commission.

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 0 0 0
12. Number Of Hours Reactor Was Critical 0 0 0
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 0 0
17. Gross Electrical Energy Generated (MWH) 0 0 0
18. Net Electrical Energy Generated (MWH) 0 0 0
19. Unit Service Factor N/A
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Est. Date of Startup: March, 1984
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY March 1984 INITIAL ELECTRICITY April 1984 COMMERCIAL OPERATION June 1984 8403300141 840229 / '

PDR ADDCK 05000275 / j/ (

R PDR i DC0044 4

- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-275 UNIT Diablo Canyon Unit 1  !

DATE 03/02/84 COMPLETED BY W.J. Kelly TELEPHONE (805)S95-7351 MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY PCWER LEVEL (lWE-MT) (fME-MT) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22- 0 7 0 23 0 8 ~0 24~ 0 9 0 25 0' 10 0 26 0 11 0 27 0 12 0 28 0 13 0 29 O i 14 0 15 0 i

16 0 INSTRUCTIONS On.this format, list.the. average daily. unit power level in MWe-Net for.each day in the, reporting month. Compute to the nearest whole megawatt.

DC0044 .5.

4

UNIT SHlHDOWNS AND POWER REDUCTIONS '..

DOCKET NO. 50-275 UNIT NAE .)lABLO CANYON UNIT 1 -

DATE 03/02/84 T&LETED BY W.J. KELLY TELEPHONE (805)S95-/$51 REPORT MONTH FEBRUARY 198f4 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to JNo. Date Typel (Hours) Reason2 - Down Reactor 3 Report # Code 4 Codes Prevent Recurrence

.NONE 1

t il s . 2 3 4

'F: - Forced: Reason: .

Method: Exhibit G - Instructions S: . Scheduled: A-Equipment- Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or. Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling . 3-Automatic Scram. Event Report (LER) File D-Regulatory. Restriction . 4-Other (Explain) (NUREG-0161)

E-Operator. Training & License Examination
v. F-Administrative- 5

~ G-Operational Error (Explain) Exhibit I - Same Source

. . H-Other-(Explain)

DC0044 6 L.- -

.m.m l.._ ..._

i r .

PACIFIC OAS AND E LE C T RIC C O M PANY pgg , DIABLO CANYON POWER PLANT T PO. Box 56 Avila Beach, Califomia 93424 (805) 595-7351 R C. THORNBERRY PLANT MANAGER March 2, 1984 Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 RE: Docket No. 50-275 License No. DPR-76 Monthly Operating Report for February,1984 Gentlemen:

Enclosed are the completed monthly operating report forms for Diablo Canyon Unit 1 for February 1984. This report is submitted in accordance with Section 6.9.1.10 of our Technical Specifications.

Sincerely, D$0 Y R. C. THORNBERRY RCT:cmr Enclosures f

cc Mr. John B. Martin, Regional Administrator l Region V - USNRC g (ll _

t l

l l

l t

DC0044 1.

i l

l JMG/WJKelly(69-3327):lrh' bec JVBoots RPatterson l PACrane WTRapp-l CLEldridge- FHSandifer -

i MSGanous- J0Schuyler

BWGiffin CMSeward
JBHoch JDShiffer WBKaefer MMendonca (NRC) l' BSlew . INP0 Record Center DBMiklush RMS l

l t

f l

L I

~

' ~

-DC0044 12 , ,

y -- - -n a+,- ywr- p , ew -y ( Jy ,-pmy., , - - y , y g + y,- -< --

. . l 1

MONTHLY NARRATIVE REPORT l 0F OPERATION AND MAJOR MAINTENANCE EXPERIENCE This report describes the operating and major maintenance experience for the month of February,1984. This narrative report was prepared by the plant staff and is submitted in accordance with Section 6.9.1.10 of the Plant Technical Specifications.

On Monday, February 20th, the plant entered Mode 4 (Hot Shutdown). System walkdown inspections were conducted during heatup operations. Interference was observed on a pipe support on the Residual Heat Removal system. Plant temperature will be held at 340*F until repairs are completed on this pipe support.

On a routine inspection of Unit 1 Containment, it was discovered that the stator windings of Reactor Coolant Pump (RCP) 1-3 were damaged by debris entering the

, pump motor during operation. RCP 1-3 has been removed from service and the motor shall be exchanged with an RCP motor from Unit 2.

On February 8th, the Electrical Maintenance Department began an overhaul program of 4.16KV General Electric Magne-Blast circuit breakers. A potential generic defect of these circuit breakers was reported to the NRC Operations Center on February 17, 1984. A followup written report will be submitted to the NRC by March 19, 1984.

No challenges to the PORV's or safety valves have been made.. Furthermore, no changes have been made in the Offsite Dose Calculation Procedure, the Environmental Radiological Monitoring Procedure, or any radioactive waste treatment systems.

1 DC0044 3