Interim Deficiency Rept U-59 Re Inconsistent Installation & Insp of safety-related Control Valve Accessories & Vendor Supplied safety-related HVAC Instrumentation.Initially Reported on 830727.Final Rept by 840411
ML20087L409
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/16/1984
From: Schnell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-59, ULNRC-768, NUDOCS 8403270187
Download: ML20087L409 (2)


Text

,

[ %-

dn16 Y[

UNION ELECTRIC COM PANY p

1908 GR ATIOT STRC..

ST, Louis. Missouri

"^7."*^o,",".".***

March 16, 1984 oo~. o r..eu~.u.

ou.

...oum.....

v........or-,

.r.

'Mr. James G. Keppler, Regional Administrator U.~ S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC-768

Dear-Mr. Keppler:

INTERIM 10 CFR PART 50.55 (e) REPORT NO. U-59 INCONSISTENT INSTRUMENTATION INSTALLATION AND INSPECTION On July 27, 1983 Union Electric Company advised Mr.

Julian Hinds of the NRC of a potential significant deficiency reportable under 10 CFR 50.55(e).

The potential deficiency

' concerns the fact that our constructor's program for the in-stallation and inspection of instrumentation may not have been consistently applied to safety-related control valve access-ories and vendor supplied safety-related HVAC instrumentation.

As a result, work control and inspection documents were not generated for these items.

Thirteen airsets and one trans-ducer associated with certain safety-related control valves are affected.

In addition, the following safety-related HVAC instrumentation may be affected:

a)

Pressure differential indicator switches b)

Pressure differential transmitters c)

Radiation elements d)

Thermowells The full extent and effect of this potential defi-ciency have not yet been determined.

An analysis of the af-fected safety-related control valve accessories has determined that these items do not constitute a significant deficiency as a significant repair is not required to meet the criteria and basis defined in the PSAR.

Analysis of the affected

' safety-related HVAC. instruments has not been concluded at

-this time.

[ '

'furtherrinstallation of these types of safety-related items Interim controls _have been instituted to insure that i

are controlled and inspected.

As an' additional control, no safety-related HVAC instruments or safety-related control valve t

2 1W DR A L

S JD D

~

.y

.w

.-Mr.

Jam 2s G. Keppler 2'-

March 16, 1984 i

accessories were. released for testing until the status of the items had been established.

This report serves as an interim report on this subject.

We expect that a final report will be issued and submitted by April 11, 1984.

Very truly yours, Whf MY Donald F. Schnell PEH/jm

.cc:

.J.

E. Konklin, NRC Ragion III

' Richard DeYoung, Director I & E NRC Resident Inspectors, Callaway Plant (2)

Missouri Public Service Commission J

t t