Monthly Operating Rept for Feb 1984
ML20087J384
Person / Time
Site: Salem PSEG icon.png
Issue date: 02/29/1984
From: Miller L, Zupko J
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8403220174
Download: ML20087J384 (13)


Text

. _ ._ __ _ . _.._._. _ . _ . _ . _ . . . __ ._ _ _ _ _ _ __

- AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-272

/~ Unit Name Sales # 1 Date March 10, 1984 Completed by L. K. Miller Telephone 609-935-6000 i Extension 4455 l

Menth February 1984 l Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1100 [

1 1087 17 1100 18 1059 2

1098 19 1100 3

1100 20 1095 4

1093 21 1081 5

1100 22 1071 6

1091 23 1071 7

1C67 24 786 8

25 0 9 1094 26 0 .

10- 1094 L

27 0 11 1095 28 0 12 1093 29 0 13 1093 1100 30 14 l

'- 1095 31 15 16 1076 P. 8,1-7 R1 L

O Page 2 of 13 O O R f R i

. . , . , . . , _ . . _ - . _ . , . . _ _ . _ _ _ _ . _ _ _ _ . . . . . . _ _ _ _ , _ _ _ _ , _ . . _ - _ _ _ _ _ . . . . . . . . _ . _ . _ _ _ . _ _ _ . _ . . _ . _ , _ . . . . _ . _ _ _ . ~ . .

OPERATING DATA REPORT Docket No. 50-272 Date March 10, 1984

(~wg Telephone 935-6000

( ) Completed by L. K. Miller Extension 4455 Operating Status

1. Unit Name Salem No. 1 Notes
2. Reporting Period February 1984
3. -Licensed Thermal Power (MWt) 3338
4. ' Nameplate Rating (Gross MWe) 1135
5. Design Electrical Rating (Net MWe) 1331I
6. Maximum Dependable Capacity (Gross MWe)1124
7. Maximum Dependable Capacity (Net MWe) TU7F
8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
9. Power Level to Which Restricted, if any (Net MWe) N/A
10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
11. Hours in Reporting Period 696 1440 59209 1237.6 34388.8
12. No. of Hrs. Reactor was Critical 569.4
13. Reactor Reserve Shutdown Hrs. 54.5 54.5 3088.4

/' 14. Hours Generator On-Line 569.4 1197.8 32975.7 k s)/15. Unit Reserve Shutdown Hours m 0 0 0

16. Gross Thermal Energy Generated

(,MWH) 1901969 3800023 99619394

17. Gross Elec. Energy Generated (MWH) 645390 1281380 32896480 ~
18. Net Elec. Energy Generated (MWH) 618884 1223764 31195076 ,
19. Unit Service Factor 81.8 83.2 55.7
20. Unit Availability Factor 81.8 83.2 55.7
21. .

Unit Capacity Factor (using MDC Net) 82.4 78.8 48.8

22. Unit Capacity Factor (using DER Net) 81.6 78.0 48.3
23. Unit Forced Outage Rate 17.3 16.4 28.6
24. Shutdowns scheduled over next 6 months (type, date.and duration of each)

Refueling 3-1-84

25. If shutdown at end of Report Period, Estimated Date of Startup:

9-1-84

26. Units in Test Status (Prior to Commercial Operation) :

Forecast Achieved Initial Criticality 9/30/76 12/11/76 Initial Electricity 11/1/76 12/25/76 Commercial Operation 12/20/76 -6/30/77 n 8-1-7.R2

{jPage3of23 Fage 3 of 13 ,

Dock 2t No. 50-2 m

UNIT SHUTDOWN AND POWER REDUCTIONS '

REPORT MONTH February 1984 Unit Name Salem No.1 Date March 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective Date Type Hours Reason Down Event System Component Action to No. Prevent Recurrence 1 2 Reactor Report Code 4 Code 5 Condenser Tube and -

5 HC HTEXCH Water Box cleaning 84-068 1-31 S 3.3 B -

Condenser Tube and 16.1 B 5 - HC HTEXCH Water Box cleaning 84-070 2-01 S Condenser Tube and 4.1 B 5 - HC HTEXCH Water Box cleaning 84-072 2-01 S Condenser Tube and 3.5 B 5 - HC HTEXCH Water Box cleaning 84-076 2-02 S Traveling Screens /

Trash Racks /

S 14.0 B 5 - HF FILTER Canal Screens84-078 2-03 Condenser Tube and 3.6 B 5 -

HC HTEXCH Water Box cleaning 84-080 2-03 S Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-082 2-04 S 29.5 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-084 2-04 S 2.2 Traveling Screens /

Trash Racks /

S 1.7 B 5 - HF FILTER Canal Screens84-086 2-05 Traveling Screens /

Trash Racks /

S 10.7 B 5 -

HF FILTER Canal Screens84-088 2-06 3 Method 4 Exhibit G 5 Exhibit 1 1 2 Reason Salem as A-Equipment Failure-explain 1-Manual Instructions F: Forced for Prepara- Source S: Scheduled B-Maintenance or Test 2-Manual Scram.

C-Re fue ling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

Page 4 of 13

Ov (O)

UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-27 p

Unit Name Salem No.1

~

REPORT MONTH February 1984 Date March 10, 1984 Telephone 609-935-6000 Completed by L.K. Miller Extension 4455 Method of Duration Shutting License Cause and Corrective Hours Reason Down Event System Component Action to No. Date Type Prevent Recurrence 1 2 Reactor Report Code 4 Code 5 ,

Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-090 2-07 S 3.0 Condenser Tube and -

5 - HC HTEXCH Water Box cleaning 84-092 2-07 S 3.0 B Traveling Screens /

Trash Racks B 5 - HF FILTER Canal Screens84-094 2-07 F 1.4 Traveling Screens /

Trash Racks B 5 - HF FILTER Canal Screens84-096 2-07 S 4.1 Condenser Tube and 5 - HC HTEXCH Water Box cleaning 84-098 2-07 S 4.3 B J

Condenser Tube and B 5 - HC HTEXCH Water Box cleaninc 84-100 2-08 S 2.3 Condenser Tube and 5 HC HTEXCH Water Box cleaning 84-102 2-08 S 2.7 B -

3 Method 4 Exhibit G S Exhibit 1 1 2 Reason Salem as A-Equipment Failure-explain 1-Manual Instructions

! F: Forced 2-Manual Scram. for Prepara- Source S: Scheduled B-Maintenance or Test 3-Automatic Scram. tion of Data C-Re fue ling D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator-Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report l

G-Operational Error-explain 9-Other (LER) File i H-Other-explain (NflREG 0161)

{

Page 5 of 13 i

i

l UNIT SHUTDOWN . / POWER REDUCTIONS Dockat No. 50-2 REPORT MONTH ' FEBRUARY 1984 Unit Name Snlc7 o.1 ,

Date March 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective No. Date Type Hours Reason Down Event System Component Action to 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Traveling Screens /

Trash Rack -

2-08 S 9.7 B 5 -

HF FILTER Canal Screen 84-104 Condenser Tube and F 5.2 B 5 -

HC HTEXCH Water Box cleaning 84-106 2-08 Condenser Tube and 3.9 B 5 -

JC HTEXCH Water Box cleaning 84-108 2-09 S Traveling Screens /

Trash Rack 2-10 S 6.1 B 5 - HF FILTER Canal Screens84-110 Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-112 2-10 S 4.2 Traveling Screens /

Trash Rack B 5 HP FILTER Canal Screens84-114 2-12 S 8.2 Traveling Screens /

Trash Rack S 4.5 B 5 - HF FILTER Canal Screens84-116 2-13 Traveling Screens /

Trash Rack S 4.9 B 5 -

HF FILTER Canal Screens84-118 2-13 Traveling Screens /

Trash Rack F 10.1 B 5 -

HF FILTER Canal Screens84-120 2-14 Traveling Screens /

Trash Rack S 2.7 B 5 - HF FILTER Canal Screens84-122 2-15 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 1

A-Equipment Failure-explain 1-Manual Instructions Salem as F: Forced 2-Manual Scram, for Prepara- Source S: Scheduled B-Maintenance or Test 3-Automatic Scram. tion of Data C-Re fue ling D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-cxplain 9-Other (LER) File H-Other-explain Page 6 of 13 (NUREG 0161)

UNIT SHUTDOWN A OWER REDUCTIONS DockCt NJ. 50-2 REPORT MONTH FEBRUARY 1984 Unit Name S'ilr 1 el "

Date March 10, 1984 Telephone 609-935-6000 Completed by L.K. Miller Extension 4455 Method of Duration Shutting License Cause and Corrective Hours Reason Down Event System Component Action to No. Date Type 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Traveling Screens Trash Rack -

B 5 - HF FILTER Canal Screens84-124 2-15 S 6.7 Traveling Screens Trash Rack F 0.7 B 5 -

HF FILTER Canal Screens84-126 2-16 Traveling Screens Trash Rack 0.4 B 5 - HP FILTER Canal Screens84-128 2-16 S _

Traveling Screens Trash Rack 6.2 B 5 - HP FILTER Canal Screens84-130 2-16 F Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-132 2-16 S 2.8 Traveling Screens /

Trash Rack B 5 - HF FILTER Canal Screens84-134 2-17 F 0.9 Condenser Tube and 5 HC HTEXCH Water Box cleaniry 84-136 2-17 S 4.3 B -

Condenser Tube and 5 HC HTEXCH Water Box cleaning 84-138 2-17 S 3.4 B -

Condenser Tube and 5 - HC HTEXCH Water Box cleaning 84-140 2-14 S 0.5 B Condenser Tube and 5 HC HTEXCH Water Box cleaning 84-142 2-17 S 5.9 B -

3 Method 4 Exhibit G 5 Exhibit 1 1 2 Reason Salem as F: Forced A-Equipment Failure-explain 1-Manual Instructions 2-Manual Scram. for Prepara- Source S: Scheduled B-Maintenance or Test C-Re fue ling 3-Automatic Scram, tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outrge for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

Page ' of 13

- UNIT SHUTDOWN A POWER REDUCTIONS Dockat No. jy-2 REPORT MONTH FEBRUARY 1984 Unit Nama Sal' o.1 .

Date March 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Caose and Corrective Type Hours Reason Down Event System Component Action to No. Date 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Condenser Tube and B 5 - HC HTEXCH Water Box cleaning-84-144 2-18 S 2.4 Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-146 2-18 S 4.5 Condenser Tube and B S - HC HTEXCH Water Box cleaning 84-148 2-18 S 2.7 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-150 2-18 S 3.5 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-152 2-19 S 2.7 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-154 2-19 S 2.0 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-156 2-20 S 2.7 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-158 2-21 S 3.1 Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-160 2-22 S 2.4 Condenser Tube and B 5 - HC HTEXCH Water Box cleaning 84-162 2-23 S 4.1 3 Method 4 Exhibit G 5 Exhibit 1 1 2 Reason Salem as A-Equipment Failure-explain 1-Manual Instructions F: Forced for Prepara- Source S: Scheduled B-Maintenance or Test 2-Manual Scram.

C-Re fue ling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

Page 8 of 13

'- UNIT SHUTDOWN I . POWER REDUCTIONS Dockst No. 50-2

. REPORT MONTH FEBRUARY 1984 Unit Nama S^tll Noel .

Date March 10, 1984 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective Hours Reason Down Event System Component Action to No. Date Type Prevent Recurrence 1 2 Reactor Report Code 4 Code 5 Condenser Tube and 5 HC HTEXCH Water Box cleaning

  • 84-164 2-23 S 2.8 B -

Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-166 2-23 S 2.6 Condenser Tube and B 5 -

HC HTEXCH Water Box cleaning 84-168 2-23 S 4.3 Condenser Tube and ,

5 HC HTEXCH Water Box cleaning 84-170 2-24 S 2.1 B -

Short in Generator A 3 -

HA GENERA winding 84-172 2-24 F 126.6 3 Method 4 Exhibit G 5 Exhibit 1 1 2 Reason Salem as A-Equipment Failure-explain 1-Manual Instructions F: Forced 2-Manual Scram. for Prepara- Source S: Scheduled B-Maintenance or Test 3-Automatic Scram, tion of Data C-Re fue ling D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)

Page 9 of 13 .

MOR @W9 F7d@ElFT(@Mi@&$ " ""

REPORT MO!TH FEBRUAPJ1 1984' UNIT NAME: SALEM 1

. DATE: ,_

MARCH 10, 1984 COMPLETED BY: L. K. MILLER

' TELEPHONE: (609) 339-4455

  • DCR NO. PRINCIPLE SYSTEM SU3 JECT lEC-1495 Microwave Provide six 4" conduits to connect the microwave communications building with the NJ Bell Telphone Building. Also provide 350 MCM grounding cable to connect the microwave tower to the microwave building ground.

1SC-0690 Chiller Cond. Recirc. Change shaft sleeve material frcm Pump'(No. 12 only) 316 stainless steel to monel.

-s l

I t

i

{

a

, ~

Y l

l

  • -DESIGN ~ CHANGE RECUIST I Fage l'; of 13 y-1-7.'R1

. =_ . . . -= _

r~N MAJOR PLANT MODIFICATIONS DOCKET NO. : 50-272

-(

j' REPORT MONTH FEBRUARY 1984 UNIT NAME:

DATE:

Salem 1 March 10, 1984 COMPLETED BY: L.K. Miller l TELEPHONE: 609/339-4455

~

! 1EC-1495 Tne implementation of this DCR requires the penetration of walls that define the boundary of Kalon protected areas.

Instructions for resealing the boundary are included. No unreviewed safety or environmental questions are involved.

I SC-06 90 Changing the pump shaft sleeve from stainless steel to Monel does affect any presently performed safety analysis.

No unreviewed safety or environmental questions are involved.

'DCR - Design Change Request p

r~s-i l

r I

3 1

("~'\.

x) Page 11 of 13

. . . - . , _ . . - . _ . . , _ . _ , . _ _ . . . _ . . _ - , _ _ , - _ . , _ , , . _ _ . . _ . ~ . . - , _ _ .

F , _-. ;, r- ~

. SALEM UNIT 1 OPERATIONS

SUMMARY

REPORT FEBRUARY 1984 Unit.~No.:l' began the' month operating at full power and remained at

~ full power'until February'24, when the unit tripped on generator neutral ground protection. Investigation revealed a failure in coil B31 outside the iron at the cooling water connection header box on the exciteriend along with se'veral loose generator coils. Additionally, many of' the coil diamond spacers were' found- to be loose and worn.

Other findings included copper splatter from the failed coil, and degraded insulation in.several areas. The full extent of the damage can not' be determined'until the generator rotor is removed and the 7

! investigation is completed. Disassembly of the generator is in progress,,with rotor removal expe,cted on March 7, 1984.

/

>+

Y p

L

^

x .~ , ..-

i

, . ~

/

/ Page 12 of 13

?! ' . . -

. ~

W e h -

  • ,g T r' M -' '-'Y # #

C

..a ,

  1. 2: v;; : -

~ '

=4u :; .- :L . ~ . . s 4

REFUELING - INFORMATION

~

DOCKET NO. 50-272 COMPLETED.BY: 'L.K. Miller' UNIT NAME: Salem 1 DATE: March 10,.1984 TELEPHONE: 609/935-6000 EXTENSION: 4455

' Month February-1984 ,

1. . Refueling.information has changed from last month:

YES X NO

2. _ . Scheduled date for next' refueling: February 24, 1984 3.- Scheduled date for restart 'following refueling: September 1,1984

?4 . - .A) Will Technical Specification changes or other license amendments be required?

.YES. NO NOT DETERMINED.TO DATE 3/1/84 B) Has the reload- fuel design. been reviewed by the Station Operating Review-Committee?

YES NO X

~

If no, when is it scheduled? May 1984 5.. Scheduled date (s) for submitting proposed. licensing action:

May-1984-(if required)

6. Importantflicensing considerations associated with refueling:

NONE'

'7.- Number.of Fuel Assemblies:

A) ' Incore 193 B) In Spent' Fuel Storage 212

28. Present. licensed spent fuel storage capacity: 1170 Future spent. fuel storage capacity: 1170
9. -Date offlast refueling that can be discharged to spent-fuel pool assuming the present

-licensed capacity: September 1996

.8-1-7.R4 Page 13 of 13

9

-Gs -s s, es U I' M W Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salern Generating Station March 10, 1984 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT S ALEM NO. 1 DOCKET NO. 50-272 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of February 1984 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Operating Summary Refueling Information Sincerely yours, k

J. M. Zupko, Jr.

General Manager - Salem Operations LKM:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page l of l3 8-1-7.R4