ML20087J328

From kanterella
Jump to navigation Jump to search
Forwards Turbine Bldg Tornado Evaluation,Sep Topic III-2: Wind & Tornado Loadings, Per Request
ML20087J328
Person / Time
Site: Oyster Creek
Issue date: 03/13/1984
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML20087J330 List:
References
TASK-03-02, TASK-3-2, TASK-RR NUDOCS 8403220152
Download: ML20087J328 (1)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____-

GPU Nuclear Corporation sippa y,Ne Je sey07054 201 263-6500 TELEX 136-482 Wnter's Direct Dial Number:

March 13, 1984 Mr. Dennis !!. Cr7tchfield, Chief s Operating Reactors Branch #5 U.S. Nuclear Reguitory Commission Washington, D. C. 20555 [

I i

Dear Mr. Crutchfield:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219 SEP Topic No. III-2 Wind and Tornado Loadings In January 1983, GPUN transmitted our tornado evaluation for the reactor i building entitled " Responses to NRC Questions for Topic III-2: Wind and l Tornado loadings".

During the integrated assessment of the SEP topics, the NRC staff requested evaluation of the turbine building capacity and the effect of its failure on other structures (e.g., the control room).

The evaluation has recently been completed and the results are summarized in the attached report.

Calculation to support the results are given in Attachment I, II and III.

Very truly yours, nd A A f

. b dier Vice President and Director Oyster Creek 1r/0134e cc: Administrator Region I U.S. Nuclear Regulatory Co.nission 1 h[g i g 631 Park Avenue King of Prussia, Pa. 19406 t

NRC Resident inspector e403220152 840313 Oyster Creek Nuclear Generating Station %DRADOCK05000g Forked River, N. J. 08731 GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

._. _ _ _ _ _ _ _ _ - - _ _ _ _ - -