_
,y Arizona Public Service Company P.o. box 21666 + ' PHOENIX, ARIZONA 85036 March 2,1984 ANPP-28996-BSK/TRB U. S. Nuclear Regulatory Commission Region V 1
Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W.' Bishop, Director a
Division of Resident Reactor Projects and Engineering Programs
~ Su'.)j e c t :
- Interim Report DER 84-07 A-50.55(e) Reportable Deficiency Relating to Borg Warner Valves Stem Extensions And The Failure to Provide Corrective
~
Action As Stated In DER 80-21 File: 84-019-026; D.4.33.2
Reference:
Telephone Conversation between P.Narbut and T. Bradish on February.9, 1984.
I
Dear Sir:
The NRC was notified of a reportable deficiency in' the' referenced telephone conversation. Due to the excensive investigation and I
evaluation required, an Interim Report is attached. It is now expected
~
that this information will_be finalized by April 16, 1984, at which time'--
a complete report' will be submitted.
Very truly your
(
.)
C'M.
C.
m%
c E. E. Van. Brunt,~Jr.
APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db Attachment cc: See Page Two 4
.y&
ye
=.
g..
s i
A l
Mr..'T. W. Bishop DER 84-07 Page Two1 cc:
' Richard DeYoung, Director Office of Inspection and Enforcement
" U. S. ' Nuclear Regulatory Conunission-Washington, D. C. 20555 T. G. Woods, Jr.
W.:E. Ide D. B. Fasnacht
-A. C. Rogers
-B. S. Kaplan L'. A. Souza J. Vorees
!J. R. Bynum P.-P.
Klute
.A.' C. Gehr W. J. Stubblefield W. G. Bingham R. L.' Pa tterson R. W. Welcher.
H. D. Foster D. R.-Hawkinson L. E..Vorderbrueggen G. A.' Fiorelli S. R. Frost' J.'Se1f
'D.'Canady Records Center
-Institute:of Nuclear. Power Operations'
^
1100-Circle 75-Parkway,JSuite11500
' Atlanta, CA.30339' f
F<
s n
r 1
e f
e
-; +4 3j;
,=
_.,.6-
'f e'
,,.i;
.k fx g
3
~
y t
l' 3 '.
fI-
^
~
e
. - ~'
. {M
. +
.j a,
~
9
~
g,
.y -n a;.
f.
, - j f,;
q_z?
._, f u
- ~_:.
c_ r m
y
- r..., ;
k(,- :13 ' ' ' -7 af_
?&
~
'.m, ;2.- _
~
i
%L w-INTERIM REPORT - DER 84-07 REPORTABLE DEFICIENCY
, ARIZONA PUBLIC SERVICE COMPANY..(APS) i PVNCS UNIT 2 & 3 f
' I.
- Description of Problem NCRs NA-1251 and NA-1252 have been issued to identify a nonconformance which resulted from NCR PX-1412, being superseded.
NCR PX-1412 was. applicable to Units 1, 2 & 3.
However, NCR NA-372
)
which superseded NCR PX-1412 only addressed Unit i valves. DER 80-21 was originally written for NCR PX-1412..
- The NCRs and the DER 80-21 were closed prior to -any repair to Units 2 and 3 valves.
Units 2 and 3 valves in question are indeterminate.
j
' II.
Approach to an'd Status of -Proposed-Resolution
- i. -
l Bechtel Engineering is investigating'the Units 2 and 3 correction action required.
~
III. Projected Completion of Corrective Action and Submittal of the Final-
~
Report-L.
Evaluation of this condition and submittal-of. thel Final. Report is :
Forecast:to.be completed by April-16 ~._1984.
<- g 4_
s
?
t i
c
(
O A&
~
~
4 e
n
?
k
)
4 7
L \\
.s"y
,f..
.,f I'
.g e-F, g
~
y 4
4 s v l
^
- .3 i, l
x:-
._'.?.
7;--
3'
',.. -i :
~
o, 3
c a
M. -:
.q s
..L '
~ ~
~
-n s,
+
a
- r