Interim Deficiency Rept DER 84-07 Re Extension of Borg Warner Valve Stems & Failure to Provide Corrective Action Stated in Rept DER 80-21.Initially Reported on 840209. Bechtel Investigating Corrections.Final Rept by 840416
ML20087G888
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/02/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28996-BSK, DER-84-07, DER-84-7, NUDOCS 8403200160
Download: ML20087G888 (3)


Text

_

,y Arizona Public Service Company P.o. box 21666 + ' PHOENIX, ARIZONA 85036 March 2,1984 ANPP-28996-BSK/TRB U. S. Nuclear Regulatory Commission Region V 1

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W.' Bishop, Director a

Division of Resident Reactor Projects and Engineering Programs

~ Su'.)j e c t :

- Interim Report DER 84-07 A-50.55(e) Reportable Deficiency Relating to Borg Warner Valves Stem Extensions And The Failure to Provide Corrective

~

Action As Stated In DER 80-21 File: 84-019-026; D.4.33.2

Reference:

Telephone Conversation between P.Narbut and T. Bradish on February.9, 1984.

I

Dear Sir:

The NRC was notified of a reportable deficiency in' the' referenced telephone conversation. Due to the excensive investigation and I

evaluation required, an Interim Report is attached. It is now expected

~

that this information will_be finalized by April 16, 1984, at which time'--

a complete report' will be submitted.

Very truly your

(

.)

C'M.

C.

m%

c E. E. Van. Brunt,~Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:db Attachment cc: See Page Two 4

.y&

ye

=.

g..

s i

A l

Mr..'T. W. Bishop DER 84-07 Page Two1 cc:

' Richard DeYoung, Director Office of Inspection and Enforcement

" U. S. ' Nuclear Regulatory Conunission-Washington, D. C. 20555 T. G. Woods, Jr.

W.:E. Ide D. B. Fasnacht

-A. C. Rogers

-B. S. Kaplan L'. A. Souza J. Vorees

!J. R. Bynum P.-P.

Klute

.A.' C. Gehr W. J. Stubblefield W. G. Bingham R. L.' Pa tterson R. W. Welcher.

H. D. Foster D. R.-Hawkinson L. E..Vorderbrueggen G. A.' Fiorelli S. R. Frost' J.'Se1f

'D.'Canady Records Center

-Institute:of Nuclear. Power Operations'

^

1100-Circle 75-Parkway,JSuite11500

' Atlanta, CA.30339' f

F<

s n

r 1

e f

e

-; +4 3j;

,=

_.,.6-

'f e'

,,.i;

.k fx g

3

~

y t

l' 3 '.

fI-

^

~

e

. - ~'

. {M

. +

.j a,

~

9

~

g,

.y -n a;.

f.

, - j f,;

q_z?

._, f u

- ~_:.

c_ r m

y

r..., ;

k(,- :13 ' ' ' -7 af_

?&

~

'.m, ;2.- _

~

i

%L w-INTERIM REPORT - DER 84-07 REPORTABLE DEFICIENCY

, ARIZONA PUBLIC SERVICE COMPANY..(APS) i PVNCS UNIT 2 & 3 f

' I.

- Description of Problem NCRs NA-1251 and NA-1252 have been issued to identify a nonconformance which resulted from NCR PX-1412, being superseded.

NCR PX-1412 was. applicable to Units 1, 2 & 3.

However, NCR NA-372

)

which superseded NCR PX-1412 only addressed Unit i valves. DER 80-21 was originally written for NCR PX-1412..

- The NCRs and the DER 80-21 were closed prior to -any repair to Units 2 and 3 valves.

Units 2 and 3 valves in question are indeterminate.

j

' II.

Approach to an'd Status of -Proposed-Resolution

i. -

l Bechtel Engineering is investigating'the Units 2 and 3 correction action required.

~

III. Projected Completion of Corrective Action and Submittal of the Final-

~

Report-L.

Evaluation of this condition and submittal-of. thel Final. Report is :

Forecast:to.be completed by April-16 ~._1984.

<- g 4_

s

?

t i

c

(

O A&

~

~

4 e

n

?

k

)

4 7

L \\

.s"y

,f..

.,f I'

.g e-F, g

~

y 4

4 s v l

^

.3 i, l

x:-

._'.?.

7;--

3'

',.. -i :

~

o, 3

c a

M. -:

.q s

..L '

~ ~

~

-n s,

+

a

- r