OPERATING DATA REPORT DOCKET NO.
50-369 DATE 03-15-84 CO31PLETED BY J. A. Reavis TELEPIIONE 704-373-7567 OPERATING STATUS
- 1. Unit Name:
McGuire Unit 1 Notes
- NOTE:
Nameplate Rating
( roSS MWe) Calculated as
- 2. Reporting Period: Februnrv 1.1984-Fnhnmre 90 1GR1 1450.00^ MVA x.90 power 3411
- 3. L.icensed Thennal Power talWti:
factor per Page 111,
- 1305,
- 4. Namepiste Rsting(Grow SIWE):
1180
- 5. Design Electricsl Ratin;:lNet alWel:
- 6. Staximum Dependable Cspacity IGrow.\\tWe):
1180
- 7. Alssimum Dependable Capacity (Net alw ):
e S. If Chsnges Occur in Capacity Rstinp litems Number 3 Throu;h 7)Since Lad Report.Gise Res>ons:
- 9. Power Level To which Restricted,if Any (Net 31We):
- 10. R?ssons For Restrictions. lf Any:
b This.\\lont h Yr..to.Dste Cumu!stive 69G.0 1 440.0 19 704.0
- 11. Hours !n Reporting Period
- 12. Number Of Hours Resetor Was Critiest RnA R 1 295.0 in anR 1
- 13. Reactor Reserve Shutdown llours
- 14. Ilours Generstnr On.Line 566.2
.1 289.4 13 999 s
- 15. Unit Resene Shutdown }!ours
- 16. Gross Thermal Energy Generated (.\\twil) 1 889 758 4 112 690 91 rygg 7s0
- 17. Gross Electrical Energy Generated OlWil) 641 299 1 442 257
,_10 959 422 IS. Net Electrical Energy Generated (31 Wit) 615 331 1 386 041 10 372 29G
- 19. Unit Senice Factor 81.4 89.5 G7.2
- 20. Unit Availability Factor -
81.4 89.5 A7 9
- 21. Unit Cspacity Factor IUsing SIDC Nett 74.9 R1 G 44 R
- 22. Unit Capacity Fsetor (Using DER Net) 74.9 R1_G 44 A
- 23. Unit Forced Outa;c Rate 0.0 1.6 in_n
- 24. Shutdowns Scheduled Oser Nest 6 Stunths (Type.Date.and Duration of Eschi:
Currently Refueling
- 25. If Shut Down At End Of Report Period. Estimated Date of Sisttup:
b N'
- 26. Units In Test Status ipr.ior to Commercial 0peration):
Forecsst Achiesed INITI A L CRITICA LITY INITIAL ELEC1 RICITY C05thlERCIA L OPER A flON KO!oog 9
gof7;3
~ '
.PDR N
=
.b
AVER.\\CE D ALLY UNIT ?ChER LEVEL OCCKET NO.
50-369 (3;7 McGuire Unit 1 1
D ATE 03-15-84 COMPLEND BY J. A. Reavis TELEPHONE 704-373-7567 1
MONTH February 1984 DAY AVERAGE DAILY POWER LEVEL DAY
. AVERAGE DAILY ?OhER :.IVEL (5the-Neti i5twe Nets g
730 g;
1121 2
1059 g3 11,1g 3
10G9 g9 1118 4
1070
- o 1118 5
1082 1119 6
1103 1122 7
1122 3
112G g
1122 24
_S19 9
1127
- 3 10 1122
~
25 lg 1125 12 1126
- 3 g3 1127
- 9
- 4 1123
~
30 is 1123 33 i
j 16 1123 INSTRUCTICNS Cn thisict. ::t. list :ne ner:ge j:a!y ett :wer te.es :a *.thNet :t rae. ::.. ne, e.n;.n, eg,
- ce2 rest.snete..e;:w:::
....g,.,
1 l
l
.o - i f
a e
=
P 50-369 UNITSilUTDOWNS AND POWER REDUCTIONS
. DOCKET NO.
UNIT NAhf E McGuire 1 DATE.
3/15/84
~ February,1984 C05tPLETED HY __L A. Reavis RI: PORT A10NTl!
TELEPilONE 704-373-7567
=
C C
rG 3 t.se O e
Li e"5cc EL 5%
Cause & Conective
'e 53 E
?33 f
s,,-
n,,e
.I e:
M E 5 a:
1.vens s?
- a. ?
Aciion to c5 6 j#3 j Repent a c$* 0 h0 Prevent !!ceurtence u
=
'O 4-p 84-02-01 F-D' ZZ ZZZZZZ AXIAL FLUX DIFF PENALTY TIME CC VALEX
- 4 GOVERNOR val.VE ISOLATED A
.5-p 84-02-01 F
3
~84-02-24 S
129.77 C
1 RC FUELXX-END OF CYCLE 1 REFUELING OUTAGE
'I I.
3 F:- Forced -
' Reason:
Ef ettu>d:
Exhibit C -Instructions S: Scheduled A liquipnient Failure (Explain) 14tanual fin Picpas.ition.if Daia ll4taintenance of Test 24!anual Serain.
Entry Sheets for 1.reemee C Refueling 1-Autunnatic Scrain.
Event Reliott (l.I'R) Fife iNtIRI.G.
- D. Regulatory Resifictions 1-Other (lixplain) 0161)
~
E-Opeaator Training & License lixandnation
. F-Administrasive 5
. G-Ogmational listor (lixplaint Exhibit I S.une Sousee
- 19/77)'
Il Other (lixplair.;
4*-
DOCKET 1:0:
50-369 UNIT:
McGuire 1 DATE:
3/15/84 NARRATIVE SU.' DIARY
?!onth:
February,1984
=9 McGuire Unit 1 operated at approximately 94% power for this period until February 24, when the unit began a scheduled 60 day refueling and turbine inspection outage. Outage is pro-gressing on schedule.
d e
9
.~ _._._ _
,._m.
MONTHLY REFUELING INFORMATION REQUEST 1.
Facf.11ty name:
McGuire Unit 1 2.
Scheduled next refueling shutdown:
Currently Refueling 3.
Scheduled restart following refueling:
April 24, 1984 f
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes If yes, what will these be?
Technical Specification changes needed to support transition to optimized fuel.
i t
l l
I If no, has reload desiga and core configuration been reviewed by Safety l
Review Connaittee regarding unreviewed safety questions?
No t
S. -Scheduled date(s) for submitting proposed licensing action and supporting 4
information:
November, 1983 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in 4
design or new operating procedures).
Optimized fuel to be used.
l Improved thermal design procedure used in safety analysis.
I 7.
Number of fusi assemblies (a) in the core:
193 l
'(b) in the spent fuel pool:
31 I
8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:- 1439 9.
Projected date of last refueling which'can be' accommodated by present licensed capacity:
DUKE POWER' COMPANY Date:-
March 15, 1984
'Name of Contacc: ' J. A. Reavis Phone:
704-373-7567'
OPERATING DATA REPORT g
50- N e-DOCKET NO.
DATE 03-15-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS McGuire Unit 2 Notes: Narneplate Rating
- 1. Unic Name:
2, Reporting Period: February 1.1984 - February 29, 1984 (Gross Mwe) calculated as
- 3. Licensed Thermal Power OlWrl: 170 1450.000 MVA x.90 power
- 4. Nameplate Rating (Gross MWel: 1305*
factor per page 111, NUREG-0020.
1180
- 5. Design Electrical Rating (Net MWe):
- 6. Ms.timum Dependable Capacity 4 Gross MWel:
- 7. Maximum Dependable Capacity (Net MWel:
1180 S. If Changes Occur in Capacity Ratimts titems Number 3 Through 7) Since Last Report. Ghe Reasons:
- 9. Power Level To which Restricted. lf Any (Net MWel:
- 10. Reasons For Restrictions.!f Any:
This Month Yr. to Date Cumulative
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On Line
- 15. Unit Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 13. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Avadability Factor
- 21. Unit Capacity Factor (Using MDC Nern
- 22. Unit Capacity FactoriUsing DER Net)
- 23. Unit Forced Ourage Rate
- 24. Shutdowns Scheduled Over Nett 6 Months IType. Date.and Duration of Eacht:
-25. If Shur Down At End Of Report Period. Estimated Date of 5tartup:
.25. Units In Test Status iPrior to Commercial Operation):
Forecast Achieved i
l INITIAL CRITICALITY INITIAL ELECTRICITY r
COMMERCIAL OPER ATION h-tNIII-
- a u
4 McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of January, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for January has been compared with the Technical Specifications annual value of 3 mrem; the total release for January was less than 10 percent of this limit.
The total station gaseous release contribution to any organ dose for January has beem compared with the Technical Specifications annual value of 15 mrem; the total release for January was less than 10 percent of this limit.
h
DtTHE POWER GOMPANY P.O. HOX 331tM)
CitAnLOTTE, N.C. 28242 IIAL II. TUCKER Tzimenown (704)373 4531 nos persenser March 15, 1984
-.e--
/
,/ Director Office of Inspection and Enforcement v
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Document Control Desk Re: McGuire Nuclear Station DocketNo.50J69,-NO Sbf S h
Dear Sir:
Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of February 1984.
Very truly yours, ga rAyj, Hal-B. Tucker JAR:scs Attachments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Com:nission Office of Nuclear Reactor Region II Regulation 101 Marietta Street, Suite 2900 U. S. Nuclear Regulatory Comm.
Atlant.a. Georgia 30303
_ Washington, D. C.
20666 Mr. Phil Ross Senior Resident Inspector U. S. Nuclear Regulatory Commi.sion McGuire Nuclear Station MNBB-5715-Washington, D. C.
20555
]
INPO Records Center Suite 1500 1100 circle 75 Parkway-Atlanta, Georgia. 30339-f*3 Y
- <(,
.