Forwards CNS 1994 FSAR Update,Including Revs Subsequent to 941001.As Result of Revs to & Per 10CFR50.71(e)(4),frequency of Subsequent Updated Catawba FSAR Submittals for Both Units Will Be Six Months After Unit 2 Refueling Outages
ML20087G689
Person / Time
Site: Catawba  
Issue date: 03/29/1995
From: Rehn D
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087G691 List:
References
NUDOCS 9504140274
Download: ML20087G689 (4)


Text

jg3;7 n 4 '

'~

['

l; i DukePoerCompany D L Rtys' Catawba Nuclear Generation Department Vice President L

4800ConcordRoad.

(803)DJ-320S OWice E

York, SC29745 (803)831-3426 Fax IDUKEPOWER' s March 29,_1995 U. S. Nuclear Regulatory Commission

- Attention:. Document Control Desk Washington, D. C. 20555

Subject:

Catawba Nuclear Station Docket Nos. 50413 and 50-414 1994 FSAR Update -

Pursuant to 10 CFR 50.71(e), please find enclosed the original and ten copies of the 1994 Catawba Nuclear Station Final Safety Analysis Report (FSAR).

While the effective date of the changes provided by this submittal is October 1,1994, several significant revisions subsequent to October 1,1994 have been incorporated in an effort to maintain the FSAR as up-to-date as possible.

As a result of revisions to and in accordance with 10 CFR 50.71(c)(4), the frequency of subsequent updated Catawba FSAR submittals, for both units, will be six (6) months after Unit 2 refueling outages. Currently, the next Unit 2 refueling outage is scheduled to end November 29,1995.

f/'

k Very truly yours, 4

b D. L. Rehn, Site Vice-President Catawba Nuclear Station Attachments

/JLL ~

xc:

S. D. Ebneter, Regional Administrator, Region II R. E. Martin, ONRR R. J. Freudenberger 7000'T Senior Resident Inspector 9504140274 950329 k

PDR ADOCK 05000413

/

\\

K PDR T

wonnsm-

x C

pp$

U. S. Nuclear Regulatory Commission -

March 29,1995

. Page 2 D. L.- Rehn, being duly sworn,-states that he is Vice President, Catawba Nuclear Generation Department, Duke Power Company: that he is authorized on the part of the said Company to sign'and file within the Nuclear Regulatory Commission this revision to the Catawba Nuclear Station Final Safety Analysis Report and that all state.nents and matter set forth therein are true

. and correct to the best of his knowledge.

d-_.

D. L. Rehn, Vice President Catawba Nuclear Station t

' Subscribed and sworn to me this day of April,1995 S M h & ') k W Notaryfublic My Commission expires: C Doof

.e <: g '_ 1 i U. S. Nuclear Regulatory Commission" - 3 March 29,1995, Page 3 - - bxc:' ELL 'J. E. Snyder - J. E. Burchfield - A. V. Carr - - B. J. Horsley ' i J. L. Lowery . 3 NCMPA-1 . SREC PMPA NCEMC i Group File: CN-801.01 Document Control: 801.01 l L . f i r 'i [ - i ' ? ~ s ..n..

a. -+. - l.. 1 Da'.i}bwer Cos:pany (803)831 3000

, -['

. a Ca:awb:&clearStation i w, 4800 ConcerdRocd I _ f~~y, . York, SC29745. kf j h,. ouxurowen- { March 29,1995 i

Subject:

Catawba Nuclear Station ' Final Safety Analysis Report Distribution Code CADM41 Attached are revisions to the October 1994 Catawba Final Safety Analysis Report. Manual l holders should update their manual as indicated by the attachment. .l Any questions concerning this update may be directed to me at (803) 831-341-2 .1 O i j I Jeff L. Iowe Regulatory Compliance I - Attachment OO i l ~xw-an -}}