Solid Radwaste Process Control Program,Davis-Besse Nuclear Power Station
ML20087G557
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/1984
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20087G521 List:
References
PROC-840331, NUDOCS 8403200058
Download: ML20087G557 (5)


Text

. ..

., _. . - - . . . . - . _ - - . . . . - ._.~. .._ . -.. .... .. ,. . _- ..-.

i 4

4 1

i 1

t

, SOLID RADIOACTIVE WASTE PROCESS CONTROL PROGRAM DAVIS-BESSE NUCLEAR POWER STATION MARCH 1984 . .

4 1

i i

i 1

I t

I

^$ ~r h ADOC 00

. P d

- , m,.y, . .~ . . . ~ . . , . - . . , , .-; , , . , .y . .y-.,

, _ .,, .-,, y-.-. ,

DAVIS-BESSE NUCLEAR POWER STATION Solid Radioactive Waste Process Control Program I. PURPOSE The processing of radioactive waste for disposal at a licensed radioactive waste burial site requires that the waste be appropriate-ly analyzed, processed and packaged, representing a final waste form that is acceptable for transportation to and burial at a licensed radioactive waste disposal site. The purpose of this Process Control Program is to document the radioactive waste processing methods and the quality control steps that are taken at Davis-Besse to verify compliance with applicable regulatory requirements and, in particu-lar, to assure an acceptable waste product meeting the applicable waste stability characteristics of 10 CFR 61.56.

This Process Control Program covers all major waste processing streams at Davis-Besse and the resulting final waste products,

, including:

  • Compressible and non-compressible trash;
  • Spent aqueous system filter cartridges;
  • Spent resins; and
  • Use of contractor for waste processing.

II. REGULATORY OVERVIEW All waste processing, packaging and shipping are conducted in accor-dance with approved procedures to assure compliance with applicable federal, state and burial site requirements. Waste processed for disposal is evaluated for compliance with:

1. The waste classification requirements of 10 CFR 61.55.
2. The waste characteristic requirements of 10 CFR 61.56,
3. The manifest reporting requirements of 10 CFR 20.311.

Packaging of waste is in containers meeting DOT specifications and is appropriate for the applicable waste class. Shipments are conducted in accordance with the requirements of 49 CFR 172-177 and 10 CFR 71.

All waste processing is performed in a manner consistent with the principles of ALARA. The procedures that have been developed to cover waste processing operations address appropriate radiation safety measures such as job preplanning (REP), radiation source shielding, and job prerequisites and material requirements so as to minimize stay times.

l

i

- j l

III. SOLID RADWASTE PROCESSING AND PACKAGING Prior to the placing of any radioactive material in a container for shipment off-site, a visual inspection of the container's general condition and integrity is conducted. Specific items leading to potential container degradation that are examined and could result in rejection for use as a radwaste disposal container include:

  • Punctures
  • Corrosion
  • Cracked, separated, incomplete, or otherwise defective seams and welds
  • Bent, dented, cut, or degraded gaskets and/or sealing surfaces Also, specific criteria prohibit the inclusion of liquid waste (e.g. ,

wet decontamination mop heads, free liquids, and plastic wastes containing liquids) unless special provisions have been made for the removal of the liquids (e.g., for dewatering spent resins).

C:mpressible and Non-Compressible Waste Miscellaneous compressible and non-compressible wastes are routinely collected throughout the radiologically controlled areas of the plant for the purposes of general housekeeping and radiological control.

Prior to filling a drum or a box with waste, the container is appropriately labeled, RADI0 ACTIVE - LSA. The loading of compressible and non-compressible waste is conducted in a manner 6

consistent with the philosophy of volume reduction and minimiza-tion of void spacing. After completion of waste compaction and/or container loading, each container is sealed, weighed and placed in radwaste storage, pending shipment to a licensed waste .

disposal site.

Liquid System Cartridge Filters Cartridge filters can be a high radiation and/or contamination hazard. All spent filter removals are performed under health physics surveillance. Filters are placed in shielded storage to allow for radioactive material decay ' prior to placing in an approved, appropriate shipping container (e.g., high integrity container or HIC).

Spent Resin - Primary System Spent resins from the primary clean-up system are transferred from the Spent Resin Storage Tank to an appropriate disposable

, ;oitus sr in accordance with approved plant procedures. No rmal-1,. saansfer is to an HIC; however, a carbon steel container may be used provided radioactive material levels meet the criteria

, for Class A waste per the requirements of 10 CFR 61.55. After transfer to a disposable container, the container is dewatered 2

l l

I

i

~

I in accordance with vendor-approved procedures that have been '

specifically developed for the dewatering of resins for the applicable vendor-supplied container. The specifics of the dewatering process must adequately demonstrate the removal of essentially all free standing water (i.e. , meeting the free standing liquids requirements of 10 CFR 61.56).

Additional administrative controls taken to assure the proper dewatering of resia utilizing vendor-supplied procedures, are 4

addressed in Section IV.

l Spent Resin - Miscellaneous Waste Monitor Tank Influent Processjng The processing of liquid radwaste normally from the miscellane-ous waste drain tank or detergent waste drain tank (dirty, aerated liquids) is performed by a contractor-supplied filtration / .

demineralization system. Refer to Section IV for the adminis-trative and operational controls that are taken to assure the generation of an acceptable waste product.

Spent Resin - Condensate Polishing Demineralizer Holdup Tanks The processing of resin slurries from the condensate polishing demineralizer holdup tanks is performed by a contractor-supplied system. Refer to Section IV below for the administrative and operational controls that are taken to ensure the generation of .

an acceptable waste product.

IV. USE OF CONTRACTOR FOR WASTE PROCESSING Contractor-supplied services may be used at Davis-Besse for the processing of radioactive waste, including miscellaneous radwaste-liquids, oil waste, and other types of waste resulting from both routine and non-routine operations. For the operation of such process systems, it may be desirable to use process control measures and procedures developed by the contractor specifically for the system. Therefore, previously addressed process control measures for a particular waste stream may, as appropriate, be superseded by contractor-supplied measures. The following discussion addresses the administrative controls that are imposed to assure that contractor-supplied systems and services for processing radioactive waste for disposal at a burial site are compatible with plant operations, procedures and regulatory requirements.

Prior to the use of any contractor for the processing of waste at Davis-Besse, a management review of the contractor's process controls and operating procedures is performed for the purpose of assuring safe operation in accordance with plant procedures and applicable regulatory requirements. For the processing of waste that is intend-ed to be shipped for. disposal at a licensed radioactive waste burial site, additional precautions are taken to assure a final waste product that meets the appropriate waste characteristic requirements for solidification or dewatering. In particular, the following items, as applicable, are to be documented by the contractor (or 3

.-- _. .~ __. . _. _ . . . _ . . -.

9 Davis-Besse manuals or procedures) prior to utilization for solid waste processing:

a general description of the solidification process, including

, type of solidification agent, major process equipment and interface with plant equipment, type of wastes that can be processed, and operating parameters

  • a process control program that provides for the verification of the generation of a suitable waste product, including items such as representative sampling, laboratory tests to establish waste-to-process medium ratios, and criteria for evaluating acceptability of laboratory tests
  • speci... 1%r approved procedures for the operation of the process equipment that will assure operation within the bounds as determined by the process control program appropriate acceptance criteria for evaluating the acceptability of the final waste product.

l l

l DBP 43060 l

I

.4