Forwards Nonproprietary & Proprietary Technical Basis for Eliminating Pressurizer Surge Line Ruptures as Structural Design Basis for Catawba,Units 1 & 2. Revised FSAR Pages Also Encl.Proprietary Rept Withheld (Ref 10CFR2.790)
ML20087G310
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/29/1984
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19292D068 List:
References
NUDOCS 8403190394
Download: ML20087G310 (3)


Text

F DUKE PowEn Goxnov P.O. DOX 33180 CHAHLOTTE, N.G. 28242

%";.57 oE7?rMIsai

~~~'~~

February 29, 1984 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensir.g Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

References:

1) Letter from W. H. Owen (Duke Power Company) to W. J. Dircks (NRC), dated September 19, 1983
2) Letter from H. R. Denton (NRC) to W. H. Owen (Duke Power Company), dated October 17, 1983
3) Letter from H. B. Tucker (Duke Power Company) to H. R. Denton (NRC), dated November 18, 1983 Dear Mr. Dentor..

References 1 and 3 informed the NRC that Duke Power Company was evaluating the technical feasibility and potential benefits of eliminating postulated pipe breaks in the Pressurizer Surge Lines from the structural design basis of the Catawba Nuclear Station. As a result of efforts by Westinghouse, the NRC, and Duke Power, we have concluded that it is technically feasible to eliminate these postulated pipe breaks.

In accordance with the statement in Reference 2 that applications related to the leak-before-break pipe failure concept will be pennitted prior to the NRC completing all of the changes in regulatory requirements, this letter is submitted.

Duke Power hereby requests NRC approval for application of the " leak-before-break" concept to the Catawba Nuclear Station to eliminate postulated pipe breaks in the Pressurizer Surge Lines from the plant structural design basis.

A specific plant applicability report is included as Enclosure A (5 copies) to this letter. Because of the proprietary nature of this report, Enclosure A has been provided only to the addressee and Mr. James P. O'Reilly of the NRC.

A non-proprietary version of the specific plant applicability report is included as Enclosure B (5 copies) and has been provided to others on the attached 2 3 distribution list.

As Enclosure A contains information proprietary to Westinghouse Electric g

Corporation, it is supported by the attached letter (Attachment 1) and affidavit eno signed by Westinghouse, the owner of the information. The affidavit sets I:s forth the basis on which the information may be withheld from public disclosure g

by the Commission and addresses with specificity the considerations listed in W

Q# kg,%

p

/.

Mr. Harold R. Denton, Director February 29, 1984 Page 2 paragraph--(b)(4) of Section 2.790 of the _Comiss' ions's regulations. Accordingly, it is respectfully requested that the information which is proprietary to Westi_ ghouse be withheld from public disclosure in accordance with 10 CFR n

~Section 2.790 of.the Commission's regulations. Correspondence with respect to the proprietary aspects of the Application' for Withnolding or the supporting Westinghouse affidavit should reference CAW-84-13, and shoul_d.be addressed to

.R. A. Wiesemann, Manager, Regulatory and Legislative. Affairs. Westinghouse Electric-Corporation,. P. 0.-Box 355, Pittsburgh, Pennsylvania 15230.

Implementation of the _ leak-before-break concept on the Pressurizer Surge Lines will have the following effects on the structural design for Catawba Nuclear

~

. Station:

L1) Eliminate.the need to postulate circumferential and longitudinal pipe breaks in the Pressurizer Surge Lines.

2)L Eliminate the need for associated pipe whip restraints and jet deflectors 1

for the Pressurizer Surge' Lines and eliminate the requirement to design for the structural effects associated with Pressurizer Surge Line pipe L

breaks including _ jet impingement.

.3) Eliminate the need to consider dynamic effects and loading conditions associated with previously postulated Pressurizer Surge Line pipe breaks.

I These' effects include blowdown loads, jet impingement _ loads, and sub-

. compartment pressurization.

, Employment of the leak-before-break concept'would not. eliminate-pipe breaks in

+

the-Pressurizer. Surge Lines from consideration as a design basis for environmental t

' qualification activities. The applicable crack. sizes and. resultant flows from the leak-before-break analysis will be used when subcompartment pressurization data are revised.

_The impact on important design aspects of implementing leak-before-break on j;,

-Catawba Nuclear Station has been evaluated by Duke Power and is summarized in.' - A list.of affected pipe whip restraints is provided in Attachment 3.

Duke Power' has also evaluated the' potential cost savings and operational benefits

-that' result from the elimination cf postulated pipe breaks _in the Pressurizer l

Surge-Lines. A summary of the potential benefits which can be realized specifically E

from the elimination of these pipe breaks for Catawba Unit 2 is provided in P.

Note that these-benefits total at least $1.7 million and involve an estimated 216 man-rem dose reduction over the life of Unit 2.

There is

~

sufficientireason and justification, in our view, to demonstrate that a net o

. gain:in overall plant safety can be achieved by deleting these Pressurizer Surge Line breaks and associated pipe whip restraints and jet deflectors.. Implementation f of-the leak-before-break concept will thus be cost ~ effective as well as technically

,p justifiable while resulting in improved overall plant safety.

(

s 4

p

O Mr. Harold. R. Denton, Director Februry 29, 1984 Dage 3 Enclosure C consists of the revised Catawba FSAR pages associated with the elimination of Pressurizer Surge Lina breaks, and it will be included in a future revision to the FSAR. This current request is for implementation on Unit 2 only; Duke Power will submit additional information prior to implementa-tion on Unit 1.

Construction completion of the Pressurizer Surge Line pipe whip restraints and jet deflectors'at Catawba Nuclear Station Unit 2 is on hold pending an

.NRC ruling on this proposal..In order to realize the maximum advantage from the elimination of Pressurizer Surge Line ruptures, we request a decisior, by April 30, 1984.

If I can be of further assistance, or if a meeting with the Staff is deemed beneficial for a final resolution of this matter, please contact me.

Very truly yours,

$8. /

/g Hal B. Tucker ROS/php Attachments e

cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

.NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207