ML20087F180
| ML20087F180 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 07/31/1995 |
| From: | Salas P, Tanya Smith TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9508150175 | |
| Download: ML20087F180 (13) | |
Text
r I
s Bl4 Ienn5ssee~veey Aumony Post OH,ce Box 2000. Decatur. Alabama 35609 August 9, 1995 f
U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - MONTHLY OPERATING REPORT FOR THE MONTH OF JULY 1995 In accordance with the requirements of Units 1, 2,
and 3 Technical Specifications, Section 6.9.
TVA is submitting the Monthly Operating Report for the month of July 1995 in the enclosure.
If you have any questions, please call me at (205) 729-2636.
Sincere 3
Pe d Sal ~ab anager of Site Licensing Enclosure cc:
See page 2 i
pn
. d v i *w
{
9508150175 950731
^
{
PDR ADOCK 05000259
[/
Ik R
PDR i
I
U.S.
Nuclear Regulatory Commission Page 2 August 9, 1995 Enclosure cc (Enclosure):
Mr. Mark S.
Lesser, Acting Branch Chief U.S.
Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Frederick J. Hebdon, Director Project Directorate II-4 Division of Reactor Projects I-II office of Nuclear Reactor Regulation, Mail 13 H3 Washington, D.C.
20555 INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. Jim Lang Director of Engineering and Operations Electric Power Research Institute P.
O.
Box 10412 Palo Alto, California 94304 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611 Regional Administrator U.S.
Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. Fred Yost, Director of Research Utility Data Institute 1200 G Street, NW Washington, D.C.
20005-3802
1 i
ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWN 8 FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 NONTHLY OPERATING REPORT JULY 1995 SEE ATTACHED i
i i
i 9
n
OPERATIONAL
SUMMARY
JULY 1995 BROWNG FERRY 1 Unit i remains shutdown on administrative hold to resolve various TVA and NRC concerns.
. Unit 1 has been on administrative hold since June 1, 1985.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.
Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
BROWNS FERRY 2 During the month Unit 2 operated at a capacity factor of 99.2 percent and generated 805,580 megawatt hours gross electrical power.
As of July 31, 1995, Unit 2 has operated continuously for 120 days.
BROWNS FERRY 3 Unit 3 remains shutdown on administrative hold to resolve various TVA and NRC concerns.
Unit 3 has been on administrative hold since June 1, 1985.
As a result, TVA considers that accrual of reporting hours is suspended since the unit has a maximum dependable capacity of 0 MWe.
Accordingly, TVA does not consider cumulative reporting period hours for the period beginning June 1, 1985, when calculating the operating status variables.
k l
\\
AVERAGE DAILY UNIT POWER LEVEL I
DOCKET NO:
50-259 UNIT:
BROWN!) FERRY 1 PREPARED BY:
T.
R.
Smith TELEfHONE:
(205) 729-2955 j
MONTH JULY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0 _
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
e i
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO:
50-260 UNIT: BROWNS FERRY 2 PREPARED BY T.
R.
Smith TELEPHONE:
(205) 729-2955 MONTH JULY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1063 16 1050 2
1063 17 1048 3
1070 18 1058 4
1062 19 1053 5
1068 20 1048 6
1061 21 1055 7
1068 22 1046 8
1059 23 1057 9
1061 24 1052 10 1060 25 1057 11 1060 26 1058 12 1066 27 1056 13 1049 28 1057 i
14 1055 29 1038
)
)
15 1052 30 1055 31 1054 i
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET No:
50-296 UNIT: DROWNS FERRY 3 PREPARED BY T.
R.
Smith TELEPHONE:
(205) 729-2955 MONTH JULY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
16 0
i 2
0 17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
l 8
0 23 0
9 0
24 0
10 0
25 0
11 0
26 0
i 12 0
27 0
23 0
28 0
1 14 0
29 0
15 0
30 0
31 0
l
lllllll liI t
1 5
3 ee Y
9 A
s t
V R h 2
n T
n R t e
ec E i 9
v s
i e
u F m 2 r
o L
S 7 P
i f
9 S r
o o
a 5
N 1
t v
n 2 W R 5 n
e o)
- O 0
o v
it 2 0 R
. 2 i
l a2 t e o
r0 5BT f
cc s
a1 A n e
p-e r
er eG rE vr o
P R OTYE u
t U
i NIBN t c rN ce d
N O eR l
o(
TUDH r
o.
s f
r hs E
EP st o
n nr K RE C
er C AL ve o op d
i i c O
PE n
t n cR t e D
ET a
ao u
R rc rt e
t t n P
s sC s e u
iR c
inn n v a
I E nd kc n A a e
t g
S n
a e*
t N
ne u
O od O
po I
mC g
T o
n 5
C C
it 9
D i
U s
9 1
x E
E m
R e *e mf Y
R L td ao s o r
U yC mcn E
S W J aS o r
i O
cct n P
Siaot ui ll ant aamicr o
D e
N st d muot ue N
A nn or nt ndh ee h aauoet t
cv t MMACRO ro e - - - - - -
S:
iE p N H L
M1 23459 e
W T R
N O O D
n T
f o
i T M o
'r U
t o gt a
H R n c im n
S i
O d
a ot e 4
P t R a
T h u x
E t
I R eh n E
S w N
M o
e U
D s
)
n
)
n e
n c i i
i a
a
'n l
L l
o p
n p
d x
s F
x r
a E
ir E
t t o
(
e
(
s c
R e e ig r
rT rn o
u ti r) r snarn l
n io )s i o eivEi a
R ai a
r 4
F e rt l l u
4 c
yT = ap ta o 7'
t ngr
- nx r
n anor+ oE uM e nit o:i(
D(
mel a t t.
t pt el arar nuurf re iuif ge: eh
'e q a e e p 2. O O E MRRO?: pt p
y A BCDEFGH T
58 e
/
t 1
a 0
D
/
d 6
e 0
l d u ed c e rh oc o
1 N
F S-
-F S lll l
l
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
50-260 REPORT MONTH:
JULY 1995 UNITt BRCfdNS FERRY 2 PREPARED BY:
T.
R.
Smith TELEPHONE:
(205) 729-2955 Method of License Duration shutting
' Event System Conponent Cause and Corrective Action to Prevent No.
Date Type' (Mours)
Reason' Down Reactor' Report No.
Code' Code' Recurrence N/A
'F-Forced
'A-Equipment Failure (Explain)
' Method:
" Instructions for Preparation of Licensee S-Scheduled B-Maintenance or Test 1-Manual Event Reports (NUREG-1022)
C-Refueting 2-Manuat Scram D-Regulatory Restriction 3-Automatic Scram E-operator Training and License Examination 4-Continuation of Existing Outage F-Adninistrative 5-Reduction
' G-Operational Error (Explain) 9-Other N-Other (Explain)
(
.yi IlIliI1 Il
-m
~
3 5
5 e
Y 9
A es t
V n
R h 2
n T
R t e
e v
s c
E i 9
e' i
u F m 2 r
o L
S 7 P
6 S
~
i f
r o
a o
9 N
1 t
v 2 W R 5 nio) n e
- O 0
o v
t 2 0 R
. 2 i
l a2 t e o
r0 5BT(
cc s
A n e
a1 e
r p-er eG rE vr o
u t
P R OTYE i
U NIBN t c rN ce d
N O eR l
o(
TUDH r
o.
s f
r h s E EP o
n st K RE C
er nr C AL ve o op d
ic i
O PE n
t n cR t e D ET a
ao u
R rc rt~
e t
t n P
s sC s e u
iR a
nN n v I E c
i md dn Aa e
t g
S n
a e*
t N
ne u
O od O
po I
mC g
T o
n C5 c
i t
U9 s
D9 ix E1 E
m R
e 'e mf Y
td ao RL s o r
yC mcn EU S
aSo WJ r i O
cct n P
Siao t ui-ll ant o
- aamicr D
e N
d uuot ue N
st A
nn o nnt ndh ee h aauoet tr t MMACRO cv o
%123459 SH iE p L
NT e
WN R
OO DM n
T
'r o
i UT f
o t
gt a
d a
P ot e 4
m t
TE hu R
a t
x IR h w.
E e S N
M U
.o es' D
) -
n
)
n e
n c i ia i
a
'n l
L l
o p-n p
s F
x od x
a E.
in E
t t a
(
e
(
R s
c ee ig r
rT rn o
u ti r) n ')
io eivEi r
snern l
o s a
R ai a
ir 4
F e rtl l t
u 4
c yT aap a o 7
t ngr rnx r
nanort oE uM e nit osi(
D(
m el ati t pt el anar i n u u ri r e gemeh wifa e e pd pt
'e E MRROAOO p
5 y
ABCDEFGH T
58 e
/
t 1
a 0
D
/
d 6
e 0
l du ed c e rh oc o
1 N
F S
-F S liIl ll
m
'i OPERATING DATA REPORT H
DOCKET:
50-259 UNIT:
BROWNS FERRY 1 PREPARED BY T.
R.
SMITH TELEPHONE:
(205) 729-2955 OPERATING STATUS
- 1. Unit Names BROWNS FERRY UNIT 1 l
- 2. Reporting Period: July 1995
-l
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating'(Gross MWe):
1152 I
- 5. Design Electrical Rating (Not MWe):
1065
- 6. Maximum Dependable' Capacity (Gross MWe): 0
- 7. Maximum Dependable-capacity (Net MWe):
0 8.
If Changes Occur in Capacity Ratings (Items Number l
3 Through 7) Since Last Report, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
0
- 10. Reason For Restrictions,-If Any: Administrative Hold THIS MONTH YEAR TO DATE CUNULATIVE*
- 11. Hours in Reporting Period 0
~0 95743
- 12. Hours Reactor Was Critical 0
0 59521
- 13. Reactor Reserve Shutdown Hours 0
0 6997
- 14. Hours Generator On Line 0
0 58267
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Groso Thermal Generation (MWh) 0 0
168066787
- 17. Gross Electrical Generation (MWh) 0 0
55398130
- 18. Het Electrical Generation (MWh) 0 0
53796427
- 19. Unit Service Factor-0 0
60.9
- 20. Unit Availability Factor 0
0 60.9
- 21. Unit Capacity Factor (MDC Net) 0 0
52.8
- 22. Unit Capacity Factor (DER net) 0 0
52.8
- 23. Unit Forced Outage Rate 0
0 25.6
-24.
Shutdowns Scheduled Over Next 6 Months
.(Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined Excludes hours under administrative hold (June 1, 1985 to present)
%d
}
^
~ - >
~
..' ' ~ ' o I
OPERATING DATA REPORT 4
DOCKET:
50-260 i
UNITS BROWNS FERRY 2 l
PREPARED BY T.
R.
SMITH TELEPHONE:
(205) 729-2955 t
OPERATING STATUS
- 1. Unit Name
' DROWNS FERRY UNIT 2
- 2. Reporting Period: July 1995
-3. Licensed Thermal Power (MWt):
3293 l
- 4. Nameplate Rating (Gross MW3):
1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
1098.4
- 7. Maximum Dependable Capacity (Not NWe):
1065 8.
If Changes Occur.in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason:
N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reason For Restrictions, If Any:
N/A TEIS NONTE YEAR TO DATE CUNULATIVE*
i t
- 11. Hours in Reporting Period 744 5087 127158
- 12. Hours Reactor Was critical 744' 5006 87133
+
- 13. Reactor Reserve Shutdown Hours 0
0 14200 l
- 14. Hours Generator On Line 744~
4987 84847
- 15. Unit Reserve Shutdown Hours 0
0' O
- 16. Gross Thermal Generation (MWh).
2444998 16253435 247422350
- 17. Gross Electrical Generation (MWh) 805580 5461320 82204498
?
- 18. Net Electrical Generation (MWh) 786201 5330379 79920215
- 19. Unit Service Factor 100.0 98.0 66.7
- 20. Unit Availability Factor 100.0 98.0 66.7
- 21. Unit Capacity Factor (MDC Net) 99.2 98.4 59.0
.l
- 22. Unit Capacity Factor (DER net) 99.2 98.4 59.0 23.~ Unit Forced Outage Rate 0.0 2.0 16.5
{
r
- 24. Shutdowns Scheduled Over Next 6 Months
.(Type, Date, and Duration of Each): None
- 25. If Shut'Down At End Of Reporting Period, Estimated Date of.Startup N/A
- Excludes hours under administrative hold (June 1, 1985 to May 24, 1991)
?
y, 4
,e
.v w yw
,, - - - ~..
4 OPERATING DATA REPORT DOCKET:
50-296 UNIT: BROWNS FERRY 3 PREPARED BY:
T.
R.
SMITH TELEPHONE:
(205) 729-2955 t
OPERATING STATUS i
- 1. Unit Names BROWNS FERRY UNIT 3
- 2. Reporting Period: July 1995
- 3. Licensed Thermal Power (MWt):
3293
- 4. Nameplate Rating (Gross MWe):. 1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe):
0
- 7. Maximum Dependable Capacity (Net MWe):
0 8.
If Changes occur in capacity Ratings (Items Number 3 Through 7) Since Last Repcrt, Give Reason: N/A
- 9. Power Level To Which Restricted, If Any (Net MWe):
0
- 10. Reason For Restrictions, If Any: Administrative Hold THIS MONTH YEAR TO DATE CUMUI.ATIVE *
- 11. Hours in Reporting Period 0
0 73055
- 12. Hours Reactor Was critical 0
0 45306
- 13. Reactor Reserve Shutdown Hours 0
0 5150
- 14. Hours Generator on Line 0
0 44195
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Generation (MWh) 0 0
131868267
- 17. Gross Electrical Generation (MWh) 0 0
43473760
- 18. Net Electrical Generation (MWh) 0 0
42114009
- 19. Unit Service Factor 0
0 60.5
- 20. Unit Availability Factor 0
0 60.5
- 21. Unit Capacity Factor (MDC Net) 0 0
54.2
- 22. Unit Capacity Factor (DER net) 0 0
54.2
- 23. Unit Forced Outage Rate 0
0 21.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shut Down At End Of Reporting Period, Estimated Date of Startup: To be determined
- Excludes hours under administrative hold (June 1, 1985 to present)
_ _ _ _ _ _ -.