.. ' CC N " 92.- 14011 PIIILADELPIII A ELECTRIC COMPANY E*2 D

FEACil IMnTOM A10MIC POVTR sTATloN

-/

R. D.1. Ik)x 208

. tJJ$8 Delta. Itans)lvania 17314 (717) 4W7014 D, B. Miller, Jr.

O 4 Presient January 15, 1992 Docket Nos. 50-277 50 278-U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:

Snelosed are twelve copies of the monithly operating report for Peach Bottom Units 2 and 3 for the month of December 1991 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, k

l

?

/

DBM/AAF/TJN/DRM/MJB: cmc Enclosure cc:

R.A. Burricelli, Public St -

.c Electric & Gas T.M. Gerusky, Commorm,, n of "ennsylvania--

--lJ. Lyash, USNRC Senior Resident Inspector R.I. McLean, State of Ma yland T.T. Martin, Administrator,- Region I, USNRC H.C. Schwemm, Atlantic Electric C.D. Schaefer, Delmarva Power INPO Records Center CCl291.NRC 920122017A 911231

. DR=ADOC..ODOOg7

[ggy ll'

A t

NRC hionthly Opf ratlans Summary Peach Ilottom Atosuie Powcr Station December 1991 UNIT 2 Unit 2 began the month at nominal 100% power. On December 5, a controlled shut down was started to begin

- a maintenance outage to repair leaks that were discovered in two RilR valves. The unit remained shut down to

. perform repairs and other maintunance until December 15 when startup began.- On Decen.ber 17, the "A" recire pump alarmed on high oillevel and was removed from service.The reactor vesselinttom head drain temperature subsequently dropped enough to require a shutdown. The recire pump problem was resobed and startup began on December 19,100% power was reached on December 21 and remained at that evel for the rest of the 8

month.

UNII3 -

Unit 3 was shut down for the entire month with refu: ling outage activities in progress. Startup is expected in early January 1992.

l 1

CCl291.NRC

.q t'

Docket No. 50 277 Attachment to Monthly Operating Report for December 1991 WIT 2 REFUELING INFORMATION 1,

Name of facility Peach :3ottom Urdt.2

-)

,t 2.

Scheduled date for next refuchg shutdown; Reload 9 scheduled for September ;',1992.

3.

Scheduled date for restart following refueling:

Restart following rJueling forecast fer Ncvember 20, IT2.

4.

Will refocling or resumption of operation screfore require a technical specification change or other license amendment?

No, 1.~ amwer 4 yes, what, le general, will these be?

1 5.

%;dtdv3 iw(/, fa nbdCr.g gr.ypet: 1:cunh.g ud

..J aup;o.dag lafa:audox

N/A 6.

Impor:aiit bcensing considerations usociated with refueling, e.g., niw or different fuel design or supplier, unreviewed design or performance an ilysis methods, significant changes m fuct design, new operating procedures:

N/A CC1291.NRC

.y

_,4.. ;

m.-.

-. ~. _

- ~ ~ -

a:

a..

Docket No 50-277 Attachment to.

Monthly Opera;.og Report for December 1991 Page 2 i<

LihlT 2 REE1]CI.IN{DJQ1}B11AI1QN (Cor.tinued) i,

7..

The number of fuel assemblics (a) in the core and (b) in the spett fuel storage poo.t (a)

Core 764 Fuel Asserablics

'hf (b)

Faf t Pce,l.18% Fuel Assemblics,58 Ft.el Itods j

' 8.

The present licensed spent fuel pool storag: capacit: anri the size of any increase in licensed storage

,-E

. capacity that has I een requested or is plan;ied, in numkr cf fuel anemblies:

The spent fuel pool storage capacity 1,83 been reticenred for,1819 fuel assemblics.

l_

9.

The projected dato of the last refueling that can be discharged to the spent fuel pool assuming the

-prer.cnt capacity:

7 September 2003 without full core offload capability, l-September 1997 with full core offload ' capability, j

o L

CC1291.NRC l

l.

d Docket No. 50 278-Attachment to hionthly Operating Report for Decernber 1991 UN!T 3 REFUEE.ING INFORMATION 1.

Name nf facility:

Peach Bottom Unit 3 2.

Sdicdubi daic for next icfuding i.hutdowrc Reload 8 in progress 3.

Scheduled date for restart following tefueling Restart following refueling scheduled for January 1,1992 4

Will refueling or resumption of operation theretiter require a technical specification change or other license amendment?

See item 6.

If answer is yes, what, in general, will these be?

See item 6.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

Technical specification unendment on reactor vessel pressure temperat us e limits prior to startup for cycle 9 was approved 6/27/91. (Technical Specification Change Request 90-17)

~ CC1291.NRC

Docket No. 50 278 Attachment to Monthly Operating Report fet December 1991 Page 2 1! NIT 3 REFUELING IPiEDRM ATION (Continued)

. 7, The number of fuel assernblics (a) in the core and (b) in the spent fuel storage pool:

(a).

Core - 764 Fuel Assemblies (b)

Fuct Pool-1@) Fuel Assemblics,6 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage L

. capacity that has been requested or is pla ined, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics.

9.

The projected date of the last refueling that cal be diwharged to the spent fuel pool assuming tbc preser.t capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

CCl291.NRC

' AVERAGE DAILY UNii POWER LEVEL DOCKET NO. 50 277 UNIT PEACH BOTTOM UNIT 2 DATE JANUARY 15, 1992 COMPANY PHILADELPHIA ELECTRIC COMPANY M. J. BARON 1

SUPERVISOR REPORTS GROUP PEACN B0110M ATOMIC POWER STATION TELEPHONE (717) 4517014 EXT. 3321 MONTH DECEMBER 1991 DAf AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NEI)

(MWE-NET) 1 1066 17 0

2 10 4 18 0

3-1065 19 0

4:

.1048 20 653 5

906 21 1002 6

6 22 1062 7

0 23 1066' 8

0 24 1D67 9

0 25 1067 0 26 1067 11

'O 27 1067 12 0

28 1068 13 0

29 1067 14 0

30 1058 15' 0

31 1058

.16 0

l 1

i

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 278 UNIT PEACH B0ff0H UNil 3 DATE JANUARY 15, 1992 COMPANY PHILADELPHIA LLECTRIC COHPANY M. J. BA%QN

$UPERVISOR REPORT 5 CROUP PEACH BOTTON Af0Hlc POWER STATION TELEPHONE (717) 456 7014 EXT. 3321 MONTH DECEMBER 1991 DAY ~ AVERA0E DAILY POWER LEVEL DAY AVERAGE DAILY *0WER LEVEL (MWE* NET)

.(MWE NET) 1 0'

17 0

2 0

18 0

3 0

19.

0 4

0 20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0.

24 0

9 0

25 0

10 0

26 0

.11.

0 27 0

12 0

28 0

13 -

0 29

($

14 0

30 0

15 0

31 0

- 16 0

s

OPERATING DATA REPORT 00Crtl NiJ. 50 277 CATE JANUARY 15, 1992 COMPLETED BY PHILADELPNIA ELECTRIC COMPANY M. J. BALDN SUPERVl&OR REPORih GROUP PE.aCH BOTTON ATOMit POWER STAil0N TELEPHONE (717) 456 7014 EXT, 3321 OPERATING STATUS

1. Uhli N'.NCI PEACH DOTTOM UNIT 2 NOTES:
2. REPORilNG PERIOD: DECEMBER, 1991
3. LICLNSED THERKAL POWER (HVT):

3293

4. WAREPLATE RAi!NG (CROS$ MWE):

1152

. 5. DESIGN ELECTRICAL RATING (NET HWE):

1065

. 6. MAXIMUM DEPENDASLE CAPACITY (CROSS MWE): 1098

7. RAXIHUN DEPENDABLE CAPACITY (NET HVE):

1055

6. IF CRANGES DCCUR IN CAPACITY RAflWGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL 10 MHlCH RESTRICIED, IF ANY (NET MWE):

.10. REASONS FOR RE51RICTIONS, IF ANY -

TH!t MONTH TR*10 DATE -

CUPULATIVE

- 11. HOURS IN REPDATING PERIOD 744 6,760 153,336 12.- NUMBER OF HOURS REACTOR WAS CRITitAL 471.6 5,553.3 92,254.0

13. REACTOR RESERVE $HUTDOWN HOURS 0.0 0.0 -

0.0

. 14. HOURS Gr.NORATOR ON LINE 414.3 5,232.4 88, B37.5

15. UNti RESERVE $4UIDJWN HOURS 0.0 0.0 0.0

- 16. GROSS THERMAL ENLRGY GENEWAfE0 (RWH) 1,302,768 16,122,696 262,539,729

17. GROSS ELECTRtCAL ENFRGY GENERATED (MWH) 433,200 5,280,300 C6,288,590
18. NET ELECTRICAL ENERGY GENERATED (HWH) 496,063 5,062,587 82,617,E53 PAGE 1 0F 2

~

~

~.

j OPERATING EA?A REPORT (CONTlWUED)

DOCKET WO, 50 277 9

DATE JANUARY 15, 1992 THIS MONTH TR TO-DATE CUMULATIVE

- 19. UNIT SERVIC. FACTOR 55.7 60.0 57.9

?3. UNIT AVAILABILITY FACTOR 55.7 60.0 57.9

' 21. UNIT CAPACITY FACTOR (USING MDC NET) 53.0 54.8 51.1

. 22. UNIT CAPACITY FACTOR (USING DER NET) 52.5 54.3 50.6

23. UNIT FORCED OUTAGE RATE 44.3 18.1 14.6 24.SRUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SKUTDOWN AT END OT REPORT PERIOD,'ESitMATEC SATE OF STARTUP N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 5

PAGE 2 0F 2

OPERATING CATA REPORT 00CKET No. 50 + 278 DATE JANUARY. 15, 1992 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY M. J. BARON SUPERVISUR REPORT & GROUP PEACH BOTICH ATOMIC POWER STAil0N TELEPHONE (717) 456 7014 EXT. 3321 OPERATING STATUS

1. UNIT NAME: FEACH BOTTOM UNIT 3' NOTES:
2. REPORTING PERIDO: DECENDER, 1991 3, LICENSED THERMAL POWERtNWT):

3293

4. NAMEPLATE RA11NG (CRO$5 MWE):

1152

3. DESIGN fLECTRICAL RATING (NET MWE):

1D65

6. MAXIMUM DEPENDABLE CAPACITY (CROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1035

8. IF' CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMEER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MVE):
10. REASONS FOR RESTRICT!DNS, IF ANY1 THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING FERIOD 744 8,7B4 149,256-

.'12. NUMBER OF HOLJR$ REACTOR WAS CRITICAL 0

5,359.2 90,362.1 13.' REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0,0

14. HOURS GENERATOR ON LINE 0.0 -

5,214.4 87,305.0

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 16,241,424 256,093,930

......,..+

.. u..==,..

-.17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 5,327,000 84,002,532

18. NET ELECTRICAL ENERGY GENERATED (MWH)

-5,902 5,103,097 80,479,769 PAGE 1 0F 2 i-t

I 1

j r.

OPERAllWG DATA REPORT (CONTINUED)

DOCKET NO, 50 278 DAtt JANUARY 15, 1992 THis MONTW Y9-TD DATE CUHULATIVE

19. UNIT serv 1CE FACTOR 0.0 59.4 58.5
20. UNIT AVAILABILITY TACf 0R 0.0 59.4 58.5
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 56.1 52.1
22. UNIT CAPACITY FACTOR (U$1NG DER NET) 0.0 54.5 50.6
23. UNIT FORCTD DUTAGE RATE 0.0 15.1 12.7
24. SHUTDOWNS SCHEDULED DVER WEXT 6 MONTHS (TYPE, DA1E, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF sitRTUP N/A ll-l
26. UNITS IN TEST STATUS (PRIOR 10 COMMERCI AL OPERATION):

FORECAST ACHIEVFD INITIAL CRITICALITY 08/07/74 INITIAL ELECTRIClfy 09/01/74 CORntRCIAL OPERAT10h 12/23/74 4

l PACE 2 0F 2 l

l l

I

[:

. UNif SHUTDOWNS AND POWER REDUCTIONS DOCKEi NO. 50 277 l

1-UWlf hAME PEACH BOTTOM UNil 2 I

DAIE.JAMUARY_ 15, 1992 REPOAT MONTH DECEMBER, 1991 COMPLETED BY PHILADELPHI A ELECTRIC COMPANY M. J. BARON SUPERVISOP.

REPORTS GROUP PEACN BOTTOM A10MIC POWER STATION l

TELEPHONE (717) 456 7014 EXT. 3321 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l

TYPE DURATION REASON SHUTilNG DOWN EVENT CODE CODE ACTf0N TO C0.

DATE (1)

(HOURS)

(2)

REACTDR (3)

RsPORT #

(4)

(5)

PREVENT PECURRENCE

' 33 911205 F

304.7 A

1 29139 CF VALVEX REPAIR RHR VALVES h

l 1

-26 911218 F

25.0 M

1 N/A 08 MOTORX RECIRC PUMP HICH OIL LEVEL i

329,7-l-

(1)

(2)

(3)

(4)

' F - FORCED REASON METHOD EXH.Bli G INSTRUCTIONS S

  • SCHEDULED A E0ulPMENT FAILURE (EXPLAIN) 1'. MANUAL FOR PREPARAT10N OF DATA B
  • MAINTENnNCE OR TEST 2 - MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C

A,'UELING 3. AUTOMATIC SCRAM.

EVENT REPORT (LER)

D. (IGULATORY RESTRICT!Dl1 4. OTHER (EXPLAIN)

FILC (NUREG 0161)

E. UPERATOR TRAINING + LICENSE EXAMINATION '

_ 5) _

F

  • ADMINISTRAffVE

(

G - OPERATIONAL ERROR (EXPLAIN)

H = OTHER(EXPLAIN)

EXHIBli !. SAME SOURCE is i

pr -

UNIT SHUTDOWNS.AND POWER REDUCIl0NS DOCKET LO. 50 278 UNIT NAME PEACH BOTTOM UNIT 3 LATE JANUARY 15, 1992 REPORT MONTH DECCMBER,1971 COMPLETED BY PHILADELPHIA ELECTRIC COMPANT M. J. SARON SUPERVISOR REPORTS Cl PEACH BOTT'. ATOMIC POWER STATION TFLEPHONE (717) 456-7014 EXT. 3321 METHOD OF LICENSEE STSTEN COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE Cout ACTION TO NO.

DATE-(1)

(HOURS)

-(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 16 911201 S

744.0 C

1 N/A 22 2222Z2 PLANNED REFUELING OUTAGE

.744.0 (1)

(2)

(3)

(4)

F

  • FORCED REASON METHOD EXHIBIT G INSTRUCTIONS

- S *-ECHEDULED-A - EQUIPMENT FAILURE (EXPLAIN) 1 - RANUAL FOR PREPARATION OF DATA B RAINTENANCE OR TEST 2 - MANUAL SCRAM.

ENTRT SNEETS FOR LICENSEE C REFUELING 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORT RESTRICT!Dh 4 OTHER (EXPLAIN)

FILE (NUREG-0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F

  • ADMINISTRATIVE (5)

G OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBli 1 - SAME SOURCE L