Responds to Violation Noted in Insp Rept 50-382/95-05. Corrective Actions:Correct Amount of Lubricant,As Determined Per Conversation W/Containment Spray Pump Coupling Mfg, Added to Coupling
ML20087D474
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/09/1995
From: Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-95-0118, W3F1-95-118, NUDOCS 9508100360
Download: ML20087D474 (3)


Text

..

1 l'

Ent: y Operitirns,Inc.

[5 K&na, LA 70006 j

Tei 504 739 6774 R. F. Burski Drector.

Ih/10!1f bl! *y l

O Vht?tfuG 3 W3F1-95-0118 A4.05-PR August 9.1995 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES i

Docket No. 50-382 License No. NPF-38 NRC Inspection Report 95-05 i

Reply to Notice of Violation Gentlemen:

In accordance with.10CFR2.201, Entergy Operations, Inc. hereby submits in Attachment I the response to the violation' identified in Appendix A of the subject Inspection. Report.

If you have any questions concerning this response, please contact.

Greg Scott at (504) 739-6703.

Very truly yours, R.F. Burski Director Nuclear Safety RFB/GCS/tjs

Attachment:

.cc:

L.J. Callan (NRC Region IV), C.P. Patel (NRC-NRR),

R.B. McGehee, N.S. Reynolds,' NRC Resident Inspectors Office

[-

9508100360 950eo9 PDR ADOCK 05o00382 g I Q

PDR

-[t Attachment to W3F1-95-0118 e

1-.

Page 1 of-2 1

9:

_3-ATTACHNENT 1

^

ENTERGY OPERATIONS. INC. RESPONSE TO THE VIOLATION IDENTIFIED IN.

AEPENDIX A 0F INSPECTION REPORT 95-05 o

VIOLATION NO. 9505-02

'j Technical Specification 6.8.1.a requires, in part, that written procedures i

/

- be established, implemented, and maintained covering the activities referenced in Appendix A of. Regulatory Guide 1.33, Revision 2, February 1978. Regulatory Guide 1.33, Appendix A, " Quality Assurance Program

^

Requirements", Section 9.a requires that the licensee. personnel follow

-1 maintenance procedures for safety-related equipment. Procedure UNT-005-007, j

Revision 4, " Plant' Lubrication Program," Attachment 6.2, " Lubrication 1

Checklist," Step 3.7, requires that pump couplings be lubricated in -

accordance with the-applicable vendor technical manual. Vendor Technical Manual 457000074 "Kopflex Coupling" page 4, Table, "Model B," requires adding 8 ounces of grease to the coupling.

q c'

Contrary to the above, on hay 23, 1995,'the inspector determined that mechanics failed to sufficiently lubricate the motor-to-pump coupling on Containment Spray Pump B. Specifically, maintenance personnel added two-l ounces of grease, j

RESPONSE

- (1)_

Reason for the Violation 1

Entergy Operations, admits this violation and believes that the root-

?

cause was inadequate instructions for performing the' task of lubricating the containment spray coupling in that: procedure UNT-005--

007, " Plant Lubrication Program", technical manual 457000074, J

" Instruction Manual for Containment Spray Pumps and Motors" and Work Authorization WA 01135201 were not clear enough.to properly direct maintenance personnel. Specifically, procedure UNT-005-007 did not q

give instructions on lubricating the type of coupling that does _ not -

have two port configuration such as:the' Containment Spray: Pump B (CSP B).

In addition, technical manual.457000074 was not clear as-to the proper amount of lubricant to put in the CSP B coupling. Also, Work Authorization 01135201 instruction sequence was not in correct order to adequately perform'this task.

Contributing to this' event was personnel _ error in that guidance provided by maintenance l engineering to maintenance personnel as to m

-the amount of. lubrication to put in the' coupling was incorrect.

However maintenance engineering personne1' subsequently determined, l

u

.i n u

k h'-

_^(

! Attachment'to

,g' 1

'Page 2 of 2

'W3F1-95-0118 i

< +

["i through conversation with the CSP. vendor, the correct amount of.~

l lubrication to'put in the CSP B coupling.

)

~

(2) Corrective'Steos That Have Been Taken and the Results Achieved The correct amount of lubricant, as determined per conversation with the Containment Spray Pump coupling manufacturer, was added to the coupling. lThis was done on'May 24, 1995, one day after the initial.

discovery of the lubrication error.

A review of all the safety related pump motor couplings' lubrication was performed. The review determined that these couplings were all-lubricated 1/3 to 1/2 full, which is an acceptable industry standard.

]

A meeting was conducted with Plant Mechanical Maintenance (PM)'

l personnel to clarify procedure UNT-005-007 as it rela ks'to i

lubricating the containment spray and other similar pump couplings.

~

Appropriate Maintenance Engineering and PMM personnel were counseled per Waterford 3's Improving Human Performance Program.

(3)

Corrective Steos Which Will Be Taken to Avoid Further' Violations Procedure UNT-005-007, Plant Lubrication Program,'w911 be revised.to include specific instructions for lubricating the cm.ainment spray l

and other similar pump couplings.

Instructions in Technical.. Manual'457000074 will be appended to state that 1/3 to 1/2 volume of lubricant in containment spray and.other

- sin.ilar coupling is acceptable.

Steps in the task work instruction will!be reordered for.

,l clarification to require lubrication' of coupling prior to' reassembly.

(4)-

Date When Full Como11ance Will Be Achieved' Full compliance willibe achieved by December 31,'_1995.