ML20087C672

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-9 & NPF-17,revising TS Chapter 6.0, Administrative Control
ML20087C672
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 01/08/1992
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087C677 List:
References
NUDOCS 9201140353
Download: ML20087C672 (4)


Text

11 i

, e Duke 1%tdr^ Company T C Aftwh AkGude NuMear Generation Denttmer:t lice h oident 12700llagen ferry Road (MGF A) (704)8754M lluntencille. hC 28075MM tiO4)STS4809 hx S^ DUKE POWint

    1. < January 8, 1992 U. S. Nuc1 car Regulatory Commission Washington, D.C. 20555 ATTENTION: Document Control Desk SUDJECT: McGuire Nuclear Station Docket Nos 50-369 and 50~370 Proposed Technical SpecAfication Changes Gentlemon:

Pursuant to 10 CFR 50.4 and 50.90, attached are proposed license amendments to Appendix A, Technical Specifications, of Facility Operating Licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.

Effective November 1, 1991 Duke Power Company implomonted a reorganization that essentially decentralized the corporate management of nuclear activitics to cach of the nuclear sitos.

In meetings with your staff on October 30, 1991, we discussed the new organizat3onal structure and its Itsultant'bonefits on overall plant safety and-officiency.

At that time we also discussed our plans to:roviso the documents that assigned specific corporate responsibilities and functions.

We are in the process of revising the Duke Quality Assurance (QA)

Topical Report, using the guidance provided-in Standard Review Plan (SRP) Section 17.3. We will soon be issuing as a special update to cach FSAR, a revised Chapter 13, " Conduct of Operations".

As soon as we have the revised FSAR, the revised QA Topical.

Report and the Technical Specification revisions-in place, we can proceed with the revision of other administrativo documentation.

Your timely consideration of this request will'certainly help us hasten the completion of this_ transition.

Attachment 1 contains the proposed Technical Specification changes. Attachment 2 contains the summary' and justification for the proposed changos. Pursuant to 10 CFR 50.91, Attachment 3-provides the analysis performed in accordance with the standards contained in 10 CFR 50.92 which concludes that the_ proposed amendments do not involve a significant Hazards cor.)ideration.-

Dukc Power is forwarding a copy of this amendmen'. request

~

application-and No Sign.tficant Hazards Consideration analysis to-the appropriate North Carolina state officials. The proposed 1

~

P 9201140333

- vc 9,20 _10s PDR o'o nrm m mvan.v 1

i i .

Document Control Desk Page 2 January 8, 1992 amendments have been reviewed and have been determined to have no edverse safety or environmental impact.

Attachment 4 consists of draft revised FSAR Chapter 13 pages, l

which describe in detail managerial functions and responsibilities. It is being provided here for your use in reviewing the proposed Technical Specification revisions.

I request a 30-day grace period for this proposed change to becomo effective following NRC approval in order to allow the orderly revision of existing implementing documents.

Should there be any questions concerning these proposed amendments of if additional information is required please call R. L. Gill at (704) 373-5826.

Very truly yours, XM/

T. C. McMeekin, Vice President McGuire Nuclear Site Attachments:

1. Proposed Technical Specification Changes
2. Summary and Justification
3. Significant Hazards Consideration Analysis
4. McGuire FSAR, Chapter 13, revised pages xr: (W/ Attachments)

Mr. S. D. Ebneter, Regional Administrator U.S. Nucloal Regulatory Commission, Region II Mr. Dayne Brown, Chief Radiation Protection Branch Division of Facility Services Department of Human Services, State of NC Mr. T. A. Reed, Project Manager office of Nuclear Reactor Regulation ,

U.S. Nuclear Regulatory Commission Mr. P. K. VanDoorn NRC Senior Resident Inspec. tor McGuire Nuclear Station American Nuclear Insurers M & M Nuclear Consultants

)

i i Document Control Desk Page 4 January 8, 1992 T. C. McMcckin, being duly sworn, states that he is Vice President of Duke Power Company, McGuire Nuclear Sito; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17, and that all the statements and matters set forth therein are true and correct to the best of his knowledge.

V ,

~

T. C. McMeekin, Vice President McGuire Nuclear Site subscribed and sworn to before me the 8th day of January, 1992.

li?Nt- f l[)/}$/f hkl}

Noparygu.211c /

v (

My Commission Expires:

,, ,- o

[ L.. L l.

I i

a ,,a#..e-wa. _s. g a. .wwsisse a.e. e ...a e ag_.-4 a.._'_as _,s._.u

. ._.A._. J AA e -- _.m+M.- - *A.M.AJL- _u.p .--*- e m %

l i

8 6

ATTACHMENT 1 PROPOSED CHANGES i

4 I

$h 1 4

}

l-1

, . . .-.. _ . _ - -_ .. , ._ .-. , _ _