Several Unit 2 Containment Air Lock Door Seal Tests That Did Not Meet Literal TS Requirements
ML20087C341
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/31/1995
From: Krieger R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087C344 List:
References
NUDOCS 9508090153
Download: ML20087C341 (1)


Text

g

_f~OY Southem Calihmia Edison Company P 0 sox las SAN CLEMENTE, CALtFORNIA 92674 0628 R. w. MRIEGER T.L.M ON.

July 31, 1995

,,c.,.....

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Docket No. 50-361 30 Day Report Licensee Event Report No.95-012 San Onofre Nuclear Generating Station, Unit 2 This submittal provides a written Licensee Event-Report (LER) for the discovery of several Unit 2 Containment air lock door seal tests that did not meet the literal Technical Specification (TS) requirements due to a

^

typograpical error in the TS. Neither the health nor the safety of plant personnel or the public was affected by this occurrence.

Sincerely,

\\

% k h

Enclosure:

LER No.95-012 cc:

L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC' Project Manager, San Onofre Units 2 and 3 Institute of Nuclear Power Operations (INPO)