Ro:On 710207,release of Liquid from Waste Collecting Tank a Had Been Accomplished W/O Unit 2 Circulating Water Pump in Svc as Required by Tech Specs.Operating Personnel Reviewed on Following Approved Adminstrative Procedures
ML20087B726
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/05/1971
From: Utley E
CAROLINA POWER & LIGHT CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8403090351
Download: ML20087B726 (2)


Text

C .- - - . . . .

o O

n M

Fgr1..teiy - Fito Cy.

Carolina Power & Light Company Raleigh Nogh Carolina 27602 I)A g) March 5,1971

/

Dr. Peter A. Morris Division of Reactor Licensing U. S. Atomic Energy Commission Washington, D. C. 20545 FACILITY LICENSE NO. DPR-23 DOCKET NO. 50-261

Dear Dr. Morris:

It is reported that Carolina Power & Light Company failed to comply in all respects with the requirements as outlined in Section 3.9.1.4,a of the H. B. Robinson Unit No. 2 Technical Specifications.

At approximately 10:25 a.m. on February 7,1971 a release of i 802.2 gallons of liquid was started from Waste Collecting Tank "A". The release permit indicated that Waste Collecting Tank "A" contained 9.2 x 10-5 ue/ml and 0.3275 mei gross activity and 1.709 x 10-3 uc/ml and 0.0060 ci total tritium activity. At 11:30 a.m. it was discovered that the release had been accomplished without a Unit No. 2 circulating water pump in ser-vice as required by the Technical Specifications. During the time of the release, Unit No. 1 circulating water pump and two Unit No. 2 service water pumps were in operation. The dilution flow was therefore 70,000 gpm instead of the intended 167,000 gpm. With the reduced dilution flow the l activity after dilution was 2.63 x 10-8 uc/cc and was well below the MPC l of 1 x 10-7 uc/cc. '

Corrective action consisted in reviewing with all operating personnel the necessity of following in detail approved administrative procedures. In addition, the liquid waste disposal release permit is being revised to include "No. of Circulating Pumps Operating."

.-i The incident was reported to Compliance, Region II, and was dis-

$$ga. cussed at a Plant Nuclear Safety Committee meeting.

88 u 50o / Yours very truly, j .p 5 l t

$$ 6: MARi11971> h; E. E.' Utley '7

@g (- ggs past -i Manager

=r o goce .c Generation & System Operations

~

03 0. 02 ggmart c/a g w,t sct**

~

EEU:HH .

    1. 11Il

p , , _, ,

- - - - ~ -

./ m 73 G 'J Carolina Power & Light Company Raleigh, North Carolina 27602 March 5,1971 Dr. Peter A. Morris Division of Reactor Licensing )

U. S. Atomic Energy Commission Washington, D. C. 20545 (

FACILITY. LICENSE NO. DPR-23 DOCKET NO. 50-261

Dear Dr. Morris:

It is reported that Carolina Power & Light Company failed to comply in all respects with the requirements as outlined in Section 3.9.1.4,a of the H. B. Robinson Unit No. 2 Technical Specifications.

At approximately 10:25 a.m. on February 7, 1971 a release of 802.2 gallons of' liquid was started from Waste Collecting Tank "A". The release permit indicated that Waste Collecting Tank "A" contained 9.2 x 10-5 uc/ml and 0.3275 mei gross activity and 1.709 x 10-3 uc/ml and 0.0060 ci total tritium activity. At 11:30 a.m. it was discovered that the release had been accomplished without a Unit No. 2 circulating water pump in ser-vice as required by the Technical Specifications. During the time of the release, Unit No. 1 circulating water pump and two Unit No. 2 service water pumps were in operation. The dilution flow was therefore 70,000 gpm instead of the intended 167,000 gpm. With the reduced dilution flow the activity after dilution was 2.63 x 10-8 ue/cc and was'well below the MPC i.

of 1 x 10-7 uc/cc. ~

Corrective action consisted in reviewing with all operating personnel the necessity of following in detail approved administrative

. procedures. In addition, the liquid waste disposal release permit is l being revised to include "No. of Circulating Pumps Operating."

The incident was reported to Compliance, Region II, and was dis-ussed at a Plant Nuclear Safety Committee meeting.

[d / Yours very truly, hb gg1.1197W i

hfhi%,

E. E. Utley fp g g,mc m tst *d Manager q4 -

uustC5 gy Generation & System Operations ,