ML20087B580
| ML20087B580 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/24/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-28933-BSK, DER-82-80, NUDOCS 8403090167 | |
| Download: ML20087B580 (2) | |
Text
..
j4 e
t7 4
Arizona Public Service Company,s P.O. Box 21666. PHOENIX. ARIZONA 85036 l:(19
- n E EOiD;p ~ ', l' February 24, 1984 ANPP-28933-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension For Report - DER 82-80 A 50.55(e) Potentially Reportable Deficiency Relating To Installed Conax Electrical Penetrations Low Insulation Resistance Does Not Meet Qualification Test File: 84-019-026; D.4.33.2
Reference:
(A) Telephone conversation between T. Young and G. Duckworth on December 17, 1982
'(B) ANPP-22736, dated January 17, 1983 (Interim Report)
(C) ANPP-23642, dated May 3, 1983 (Time Extension)
(D) ANPP-27619, dated August 23, 1983 (Time Extension)
(E) ANPP-28539, dated January 3, 1984 (Interim Report)
Dear Sir:
~
The NRC was notified of a potentially reportable deficiency in Reference-(A), an Interim Reports were transmitted.by References (B) and (E), and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final. Report would be available by March.-2, 1984.
Due to the extensive investigation and' evaluation required, it is now expected that this information will be finalized by April' 25, 1984, at which time a-complete report will be submitted.
-There is no new information or. change to the Interim Report at this time.
Very truly yours, fgl000528 4
DR c
-S E. E. Van Brunt, Jr.
D APS Vice President, Nuclear ANPP Project Director EEVB/TRB:ru cc:.See Page Two IV D 1
\\
&p
}
no -
m 1
yi e
n
!~
Mr'.;T. W. Bishop DER 82. Page.Two cc:
Richard DeYoung, Director
~ Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 220555 C
~
T. G. Wo od s, -'J r.
~
W. E. Ide
.D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A..Souza LJ. Vorees
-J. R. Bynum P. P.-Klute A. C. Gehr W. J. Stub'alefield W. G.! Bingham.
L-R.. L.- Pa tterson lR. W. Welcher H. D. Poster D. ~ R. Hawkinson L. - E.1Vorderbrueggen -
!~
G.
A.-- Florelli
-S. R. Frost J. Self D. Canady.
[
L',
' Records Center Institute of Nuclear Power Operations 1100. Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 3:
- +..
x f;
I J
C
' ji; t
. N -
! i a:
.