Interim Deficiency Rept DER 82-80 Re Low Insulation Resistance on Installed Conax Electrical Penetrations Not Meeting Qualification Test Criteria.Initially Reported on 821217.Final Rept Delayed Until 840425
ML20087B580
Person / Time
Site: Palo Verde  
Issue date: 02/24/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28933-BSK, DER-82-80, NUDOCS 8403090167
Download: ML20087B580 (2)


Text

..

j4 e

t7 4

Arizona Public Service Company,s P.O. Box 21666. PHOENIX. ARIZONA 85036 l:(19

  • n E EOiD;p ~ ', l' February 24, 1984 ANPP-28933-BSK/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 82-80 A 50.55(e) Potentially Reportable Deficiency Relating To Installed Conax Electrical Penetrations Low Insulation Resistance Does Not Meet Qualification Test File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between T. Young and G. Duckworth on December 17, 1982

'(B) ANPP-22736, dated January 17, 1983 (Interim Report)

(C) ANPP-23642, dated May 3, 1983 (Time Extension)

(D) ANPP-27619, dated August 23, 1983 (Time Extension)

(E) ANPP-28539, dated January 3, 1984 (Interim Report)

Dear Sir:

~

The NRC was notified of a potentially reportable deficiency in Reference-(A), an Interim Reports were transmitted.by References (B) and (E), and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final. Report would be available by March.-2, 1984.

Due to the extensive investigation and' evaluation required, it is now expected that this information will be finalized by April' 25, 1984, at which time a-complete report will be submitted.

-There is no new information or. change to the Interim Report at this time.

Very truly yours, fgl000528 4

DR c

-S E. E. Van Brunt, Jr.

D APS Vice President, Nuclear ANPP Project Director EEVB/TRB:ru cc:.See Page Two IV D 1

IO

\\

&p

}

no -

m 1

yi e

n

!~

Mr'.;T. W. Bishop DER 82. Page.Two cc:

Richard DeYoung, Director

~ Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 220555 C

~

T. G. Wo od s, -'J r.

~

W. E. Ide

.D. B. Fasnacht A. C. Rogers B. S. Kaplan L. A..Souza LJ. Vorees

-J. R. Bynum P. P.-Klute A. C. Gehr W. J. Stub'alefield W. G.! Bingham.

L-R.. L.- Pa tterson lR. W. Welcher H. D. Poster D. ~ R. Hawkinson L. - E.1Vorderbrueggen -

!~

G.

A.-- Florelli

-S. R. Frost J. Self D. Canady.

[

L',

' Records Center Institute of Nuclear Power Operations 1100. Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 3:

- +..

x f;

I J

C

' ji; t

. N -

! i a:

.