Forwards List of Draft License Conditions Considered Complete,Per 840222 Request.Conditions Should Be Deleted. Draft License Condition D.4 Should Specify Level I PRA & Should Be Submitted by 840630
ML20087B517
Person / Time
Site: Crane Constellation icon.png
Issue date: 03/05/1984
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To: Stolz J
Office of Nuclear Reactor Regulation
References
5211-84-2062, NUDOCS 8403090125
Download: ML20087B517 (2)


Text

. s f4 g

GPU Nuclear Corporation Ngggf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

March 5, 1984 5211-84-2062 Office of Nuclear Reactor Regulations Attn: John F. Stoltz, Chief Operating Reactors Branch No. 4 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

Three Mile Island Nuclear Station, Unit I, (U!I-1)

Operating License No. DPR-50 Docket No. 50-289 Draf t Operating Licensee Conditions for Restart This letter responds to your letter dated February 22, 1984.

As you requested we have identified on the' attached those Draft Licensee Conditions we consider complete. Based on this, we request that those conditions be deleted.

In addition, Draft Licensee Conditions B.5 should specify 46% power provided that it is understood that a demonstration of EFW automatic initiation on either loss cf feed water pumps or on loss of four RC pumps, and not both, fulfills the condition.

Finally Draf t Licensee Condition D.4 should specify a level I PRI, and be submitted by June 30, 1984.

Except as noted above we fi1d these Draft Licensee Conditions complete and acceptable. With the above comments resolved we believe no meeting is necessary.

Sincerely, pan'J/

H. D. Htlkill.

Director, DII-1 HDH:CWS:mle Attachment 0

I I) 8403090125 840305 PDR ADOCK

\\

05000289 P

PDR GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

~

,:,, :'s

. ATTACHMENT DRAFT LICENSE CONDITION COMPLETION DOCUMENTS B Pressurizer Level Instrument NRC Inspections report 82-26 Power Supply (See Certification Itea 120)

B-3.- Backup Incore Thermocouple Display NRC Inspection Renorts 81-10, 81-28, 82-14, 82-15, 82-26, and 83-32.

(See certification Items 76 and 113).

B.4'- Environmental Qualification NRC Inspection 83-02, NRC Letter Items from PID oct. 8, 1982, (See certification Item 129)

C.2 - Control Room Human Factors GPUN Letter dated Jan. 16, 1984 C.4

. Reactor Inventory System NRC Order dated Dec. 10, 1982, adequately covers this issue.

D.2 - Training Auditing Procedure NRC Inspection Report 83-02 D.3 - Procedure for Review for Cheating NRC Letters dated March 25, 1983 and July 13, 1983

,