Interim Potentially Reportable Deficiency Rept DER 83-69 Re Seismic Support on Posi-Seal Valves Not Installed Per Specs. Due to Extensive Investigation,Final Rept Delayed Until 840515
ML20087B515
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 02/22/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-28920-BSK, DER-83-69, NUDOCS 8403090122
Download: ML20087B515 (2)


Text

_

t o-Y-

I',

_'h

'f y - - -

4 Arizona Public Service Company P.O. box 21666 +-- PHOENIX ARIZONA 85036 '

o February. 22, 1984 ANPP-28920-BSK/TRB

U. S. Nuclear Regulatory Commission Region V, Creekside Oaks
Office Park

-1450 Maria Lane - Suite 210 Walnut Creek,.CA 94596-5368

~

' Attention: Mr. - T'.- W. Bishop, - Director Division of Resident

. Reactor Projects and Engineering : Programs

Subject:

Time Extension For Report - DER 83-69

. A 50.55(e) 1utentially Reportable Deficiency Relating To Unit.1 Seismic Supports On Posi-Seal Valves Not Installed Per Specification File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on October.11, 1983

' (B) - ANPP--28202, dated November 8,1983 (Interim Report)

(C) ANPP-28587, dated January 10, 1984 (Time. Extension) l

Dear' Sir:

The:NRC was notified of a potentially reportable deficiency in

,r Re.ference'(A),'an Interim Report was transmitted by Reference (B), and a

-Time-Extension was requested,by Reference (C);. At that time, it was estimated that a. Final Report would' be available by March 1, -1984.

Due to the extensive investigation and evaluation required, it is now expected'that.this information'will be finalized by May 15, 1984, at 1which time a complete'. report will be submitted.

There is no, new,information or change to the Interim Report at this time.

Very truly yours, Cm E. E. Van Brunt, Jr.

APS-Vice President, Nuclear ANPP Project Director EEVB/TRB:ru 4

- cc: See Page Two h

pg l-IO w

E y

-4w y

y

-vr

.-e-

+w,

-w,,-

--s v

-v,

.-, m me---,,-=,--w--,.

---.we i

e-,

,-m-evv

m i

. tj y

.y,..

Mr. T. W. Bishop-DER 83-69

,Page Two-

~

cc:

IRichard DeYoung,. Director:

Office of _ Inspection,and' Enforcement '

U. S.-Nuclear Regulatory Commission-Washington, D. C. 20555 T. G.-Woods.:Jr.

-W.

E. Ide-D. B. Fasnacht A. C. Rogers.

B. S. - Kaplan

-L. A. Souza

.J. Vorees J. R. Bynum

'P. P. Klute A.-C. Gehr-W. J. Stubblefield

~

~W. G. Bingham-R. L. Patterson

- R. W. Welcher H. D. Foster-D. R. Hawkinson L. E. Vorderbrueggen -

G.'A.

Florelli S. R.-Frost

~J.

Self

=

D. Canady Records Center

Institute of. Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlant'a, CA 30339 4

7 4

i s