ML20087B413
| ML20087B413 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/24/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 83-72, ANPP-28936-BSK, NUDOCS 8403090077 | |
| Download: ML20087B413 (2) | |
Text
,
- s w a 'h i @
RECEIVED
'IfEC t
t Arizona Public Service Company 10% NAR -2' FM '1: 08 7"*"***""'*^*2"^***
s H
REGION VIGI' February 24,-1984 K
t.
- ANPP,-28936-BSK/TRB i
[i
'U. S. Nuclea'r Regulatory Commission
['
nRegion V Creekside Oaks-Office Park pp 11450 Maria Lane - Suite 210 L
Walnut Creek, CA 94596-5368
[
. Attention: Mr. T. W. Bishop, Director P-l_
Division of Resident y
- Reactor. Projects and Engineering Programs
[L
- 1 F
Subject:
-Time Extension For Report - DER 83-72
[.
A 50.55(e) Potentially Reportable Deficiency Relating To
[ ' ~
Undersized. Welds In Unit 1 Auxiliary Building Discovered.b'y NRC CAT.
h File:. 84-019-0 26; D.4.33.2
Reference:
-(A) Telephone conversation between P. Narbut'and R. Tucker on E
.,_ _ October 26, 1983 (B)' ANPP-28287, dated November 28, 1983 (Interim Report)
.(C) ANPP-28662,Jdated January 23, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in i
- Reference-(A), an Interim Report was transmitted by Reference (B), and a i
Time Extension-.was requested by Reference -(C).
At that time, it was l
x estimated.that a Final Report would be available by February 29, 1984.
Due-to the extensive investigation and evaluation required, it is now expected that'this information will be finalized by March 15, 1984, at
-which~ time a complete report will be submitted.
There is no new information or change to~the Interim Report at this time.
Very truly yours, I
Om
( (
E. E. Van Brunt, Jr.
. APS Vice President, Nuclear EEVB/TRE:ru cc:
Se( Page Two 77 840224
.i DR K 05000528-(
's PDR ff-7 7 3
1 0
M-
&-----_a--
r
!~
a k-
- LA -
- ta t
(
- s. R,..~""
~
a q'
f v
e
-Mr.-T. W. Bishop L DER 83-7 2
~
Page Two:
- f ?
. cc:'
Richard DeYoung, Director Office of Inspection.and Enforcement g.,
U. S. Nuclear' Regulatory Commission Washington, D. C. 20555
~T. G. WoodsiiJr.
~W. E. Ide~
~
lD. B. Fasnacht A. C. Rogers B. S. Kaplan L.-A.1Souza
@k
-E J. Vorees J. R. Bynum P. P. Klute
'l
.A. C. Gehr-W. J. Stubblefield
- ..W. G.. Bingham R.~ L.~Patterson-R.
W., Welcher H. D. Foster-
'D..R. Hawkinson
- s#
^ L. E. Vorderbrueggen -
G. A. Fiore11ii S. R. Frost
- J. Self
'D. Canady
- Records Center
. Institute of Nuclear Power Operations
~
.1100 circle 75 Parkway, Suite 1500
'i Atlanta, CA 30339 6 F f #
Z
'I i
i
"