ML20087B095
| ML20087B095 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 08/01/1995 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20087B099 | List: |
| References | |
| NUDOCS 9508070301 | |
| Download: ML20087B095 (1) | |
Text
O.
R fea'""
A*
Southem Califomia Edison Company P. O. DOX 128 a
SAN CLEMENTE. CALIFORNIA 92674-0128 MAe4AGER OF R E A
y Ar F AIRS
-(714 i
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
Subject:
Docket Nos. 50-361 and 50-362 Safety Engineering Command and Control Evaluation San Onofre Nuclear Generating Station, Units 2 and 3
Reference:
NRC Inspection 50-361/95-06 and 50-362/95-06; Inspectors: J. Russell, D. Desaulniers, and E. Brown During the referenced human factors special inspection (IR 95-06), Edison indicated that we would be evaluating control room command structure and implementing any necessary changes prior to the Unit 3 refue_ ling outage.
This evaluation, " Safety Engineering Command and Control Evaluation SEA 95-05," was
{-
completed on July 12, 1995, and the appropriate corrective actions were implemented prior to July 22, the start of the Unit 3 cycle 8 refueling outage. As requested by Mr. Desaulniers on April 14, during the inspection exit interview, a copy of the evaluation is enclosed.
If you have any questions please contact me.
Sincerely eeb 1
Enclosure cc:
L. J. Callan, Regional Administrator, NRC Region IV J. E. Dyer, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident, San Onofre Units 1, 2 & 3 H. B. Fields, NP.C Project Manager, San Onofre Units 2 and 3 D. R. Desaulniers, NRC NRR/DRCH/HHFB CS0036 a
9508070301 950801
- 1I PDR ADOCK 05000361 l
O PDR w