ML20087A853
| ML20087A853 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 02/27/1984 |
| From: | Quamme D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Baranow S STONE & WEBSTER, INC. |
| References | |
| 27321, CSM-0738, CSM-738, NUDOCS 8403080245 | |
| Download: ML20087A853 (3) | |
Text
.o Dean L Ouemme g
, O* ' O Sue Manager i
A' Midland Project t
o Midtend Project PO Box 1963, Midtend, MI 4864o. (517) 631-866o fRWalPAL S,TA,((_
February 27, 1984 E
b
._6D ' 3N-
@A
'9 - 3%
D/KA
$--f-g
/
3 sKA F' f L AL Mr Stan Baranow SGA jFilo l
9 Stone & Webster
~giF i
Midland Nuclear Plant Project Trailer 186 P O Box 1963 Midland, MI 48640 MILLAND ENERGY CENTER PROJECT TRANSMITTAL TO S&W-CIO File-24.2 Serial 27321, CSM-0738 This is to confirm that on February 21, 1984 a listing of all open nonconformance reports listed on the Quality Action List was given to Don Brown of Stone & Webster CIO. The list was sorted by issue date.
/
tw
-v~
DLQ/kw CC: *JUKsppler',"WRC'Regf on*IIIg JJHarrison, NRC Region III RJCook, NRC Site RAWell, MPQAD CFEwert, MPQAD
. BilPeck
'~
NIReichel DDJohnson 8403090245 840227 PDR ADCCK 05000329 S
PDP g %1 1 E01 it
.e
.e e
f l
Dean L Quemme Site Manager
.~+ G _} * * ; '*
. ~,.'.
[,;3
} e Midland Project CSM-0739 Mediend Project PO som 1963. Midland. MI 4864o. (617) 631-865o February 23,-1984 Mr J E Karr Stone and Webster Midland Nuclear Plant Project Trailer 180 3500 E Miller Road Midland, MI 48640 MIDIAND ENERGY CENTER PROJECT -
TRANSMITTAL.0F M"MO FILE 24.2 SERIAL 27320, CSM-0739 Transmitted herewith is a copy of memo GFE 57-84 Initial and Continuing Training to PSP G-6.1 per George Fotiadis' request. Also on this date a copy of the memo was given to George Fociadis of Stone and Webster CIO.
ph a
DLQ/kw Attachment CC yJGKepplerpMRCrRegion 9111, Administrator.
RAWells, MPQAD GFEwert, MPQAD JJHarrison, NRC Region III RJCook, NRC Site i
BHPeck NIReichel DDJohnston a.
7 1
a 5
To DEBeaudoin 4'
a
""*"*"' /#
CORSURISIS DATE February 22, 1984 POVrer SusaccT MIDLAND ENERGY CENTER PROJECT -
INITIAL AND CONTINUING TRAINING
,g,,,
TO PSP G-6.1 conacseosorwcc FILE 1.1.1 GFE 57-84 CC LABotimer QC Programmatic Training File Memos GFE 83-34, 93-83, 131-83 and 220-83 specified the continuing training requirements for PSP G-6.1.
The initial training requirement is specified in the MPQAD Procedures and the lesson plans were revised as the procedures were revised.
The chart below defines:
(1) dates of Initial OC Programmatic Training for the revision of PSP G-6.1 shown in column 2; (2) required revision of PSP G-6.1 covered in initial QC Programmatic Training for the dates shown in column 1; and (3) required Continuing Training based on the initial training identified in columns 1 and ?.
Please read the footnotes at the bottom of the chart, which will aid in the interpretation of the information.
(1) QC PROG INITIAL (2) PSP C-6.1 REQUIRED (3)
REQUIRED TRAININC DATES INITIAL TRAINING CONTINUING TRAI'(ING 10/25/82 - 01/30/83 Revision 7 (1) Revision 7P 01/31/83 - 04/07/63 Revision 7 (2) Revision 8 Revision 7P 04/08/83 - 05/17/83 Revision 8 (3) Revision 7 05/18/83 - 09/13/83 Revision 7 None Revision 8 09/14/83 -
Revision 7A None Revision 9 (1) Rt.ision 7P consists of Interim Revision Request No:
Project-30, AAPD-12.
(2) Revision 3 incorporated Interim Revision Request No:
Project-30, AAPD-12.
(3) Revision 7 initial training was deleted for this period, however Initial Training is required for individuals who received training between 4/8/83 and 5/17/P3 (reference memo CFE 131-837.
GFEikw
.