Confirms That Listing of Open Nonconformance Repts,Sorted by Issue Date,Given to D Brown on 840221
ML20087A853
Person / Time
Site: Midland
Issue date: 02/27/1984
From: Quamme D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Baranow S
STONE & WEBSTER, INC.
References
27321, CSM-0738, CSM-738, NUDOCS 8403080245
Download: ML20087A853 (3)


Text

, .o

  • g Dean L Ouemme i ' -

' ' O* ' O

, Sue Manager A't Midland Project

- o Midtend Project PO Box 1963, Midtend, MI 4864o . (517) 631-866o February 27, 1984 E fRWalPAL S,TA,((_

._6D ' 3N- @A b -

'9 - 3% D/KA $--f-3/

g Mr Stan Baranow sKA F SGA

' fAL L Stone & Webster ~giF i jFilo l 9 Midland Nuclear Plant Project Trailer 186 P O Box 1963 Midland, MI 48640 MILLAND ENERGY CENTER PROJECT TRANSMITTAL TO S&W-CIO File- 24.2 Serial 27321, CSM-0738 This is to confirm that on February 21, 1984 a listing of all open nonconformance reports listed on the Quality Action List was given to Don Brown of Stone & Webster CIO. The list was sorted by issue date.

/ tw -v~

DLQ/kw CC: *JUKsppler',"WRC'Regf on*IIIg JJHarrison, NRC Region III RJCook, NRC Site RAWell, MPQAD CFEwert, MPQAD

. BilPeck

'~ NIReichel DDJohnson 8403090245 840227 PDR ADCCK 05000329 -

S PDP g %1 1 E01 it

.e

.e e

f l ,

Dean L Quemme Site Manager

.~+ G _} * * ; '*

[,;3

  • Midland Project

} *e

. ~ , .'.

CSM-0739 Mediend Project PO som 1963. Midland. MI 4864o . (617) 631-865o February 23,-1984 Mr J E Karr Stone and Webster Midland Nuclear Plant Project Trailer 180 3500 E Miller Road Midland, MI 48640 MIDIAND ENERGY CENTER PROJECT -

TRANSMITTAL.0F M"MO FILE 24.2 SERIAL 27320, CSM-0739 Transmitted herewith is a copy of memo GFE 57-84 Initial and Continuing Training to PSP G-6.1 per George Fotiadis' request. Also on this date a copy of the memo was given to George Fociadis of Stone and Webster CIO.

a ph DLQ/kw

. Attachment CC yJGKepplerpMRCrRegion 9111, Administrator.

RAWells, MPQAD GFEwert, MPQAD JJHarrison, NRC Region III RJCook, NRC Site i BHPeck NIReichel DDJohnston a.

7 1 a

5 To DEBeaudoin a

4'

""*"*"' /#. CORSURISIS DATE February 22, 1984 POVrer SusaccT MIDLAND ENERGY CENTER PROJECT -

INITIAL AND CONTINUING TRAINING ,g,,,

TO PSP G-6.1 conacseosorwcc FILE 1.1.1 GFE 57-84 CC LABotimer QC Programmatic Training File Memos GFE 83-34, 93-83, 131-83 and 220-83 specified the continuing training requirements for PSP G-6.1. The initial training requirement is specified in the MPQAD Procedures and the lesson plans were revised as the procedures were revised. .

The chart below defines: (1) dates of Initial OC Programmatic Training for the revision of PSP G-6.1 shown in column 2; (2) required revision of PSP G-6.1 covered in initial QC Programmatic Training for the dates shown in column 1; and (3) required Continuing Training based on the initial training identified in columns 1 and ?. Please read the footnotes at the bottom of the chart, which will aid in the interpretation of the information.

(1) QC PROG INITIAL (2) PSP C-6.1 REQUIRED (3) REQUIRED TRAININC DATES INITIAL TRAINING CONTINUING TRAI'(ING 10/25/82 - 01/30/83 Revision 7 (1) Revision 7P 01/31/83 - 04/07/63 Revision 7 (2) Revision 8 Revision 7P 04/08/83 - 05/17/83 Revision 8 (3) Revision 7 05/18/83 - 09/13/83 Revision 7 None Revision 8 09/14/83 - Revision 7A None Revision 9 (1) Rt.ision 7P consists of Interim Revision Request No: Project-30, AAPD-12.

(2) Revision 3 incorporated Interim Revision Request No: Project-30, AAPD-12.

(3) Revision 7 initial training was deleted for this period, however Initial Training is required for individuals who received training between 4/8/83 and 5/17/P3 (reference memo CFE 131-837.

GFEikw

.