ML20087A624

From kanterella
Jump to navigation Jump to search
Forwards Revised Procedure for Plant Emergency Plan Implementing Procedures Manual
ML20087A624
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/16/1991
From: Zach J
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087A602 List:
References
VPNPD-91-436, NUDOCS 9201090252
Download: ML20087A624 (1)


Text

...

Wisconsin

! Electnc POWER COMPATH W)225 23E 231 w Menior eo b 2ce Mamee w om VPNPD-91-436 NRC-91-144 December 16, 1991 U.

S. NUCLEAR REGULATORY CO}U4ISSION Document Control Desk Mail Station P1-137 Washington, D.

C.

20555 Gentlemen:

DOCKETS 50-266 AND 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Enclosed are revised procedures for the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual.

The procedures consist of changes which should be filed in your copy of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE".

A copy of the affected procedures with names and numbers deleted is provided and is stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your distribution to the public documents room.

Very truly yours, t /-

m

~

. v,...,

i James J.

Zach VicelPresident Nuclear Power Enclosures Copies to NRC Resident Inspector (without enc.)

NRC Incident Response Center, Region III 0700%

)

9201090252 911213 l

~

l PDR ADOCK 05000266 F

PDR 31

\\

l sa:%n.9a.7 i filis avisin fiic ?r's (ign mitn ?.

i