ML20087A599

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Epips,Including Rev 13 to EPIP 1.1, Plant Operations Manager:Initial Response & Rev 21 to EPIP 1.2, Event Classification. W/910106 Release Memo
ML20087A599
Person / Time
Site: Point Beach  
Issue date: 12/13/1991
From: Dent P
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20087A602 List:
References
NUDOCS 9201090242
Download: ML20087A599 (3)


Text

. _ - _

o Wisconsin

' Electnc POWER COMPANY Point Beach Nuc5cf Plant (410 Nuc50r r4d. Two rm VWM g y) g,p December 13,1991

- U.S. NUCLEAR REGULATORY COMMISSION Document Control Desk Washington DC 20555 Manual:

EPIP (SSUE DATE:

December 13,1991 The following changes have been made to the Emergency Plan Implementing Procedure. Manual. Please remove any previous revisions and insert the current one? that are attached.

1.

EPIP Index, Revision 6 2.

EPIP 1.1, Plant Operations Manager: Initial Response. Revision 13.

3.

EPIP 1.2, Event Classification. Revision 21.

After updating your manual, complete the attached receipt and return to Ms. P. A. Dent at Point Beach Nuclear Plant.

if you have any questions, please call the Distribution Centcr at En.173.

""" Special Distribution Notes ""*"

FIRST PAGE OF EACH PROCEDURE STAMPED "NRC ONLY NOT FOR PUBLIC DISCLOSURE.'

ONLY ONE SET IS STMIPED AS SUCn.

~r W

/ 'l *~

)y;> c j P. A. Dent

. Attachment (2)

CONTROLLED IO 2A2 411213 DCK 05000266 F

PDR hhicMvmanunhvmGemen

l December 13,1991 To:

P. A. D ont Manual:

EPIP ISSUE DATE:

Decemoer 13,1991 The procedures listed below have been received by the undersigned and inserted into the Emergency Plan Implementing Procedures Manual.

1.

EPIP Index, Revision 6.

2.

EPIP 1.1, Plant Operations Manager: Initial Response Revision 13.

3.

EPIP 1.2, Event Classification, Revision 21.

Date

.s

,Y

+1 u t u

,0,,

UNITED STATES J'

g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20$b6 5

t

\\*****/

January 6, 1991 Docket 50-266/301 POINT BEACH NUCLF.AR PLANT MEMORAtlDUM FOR:

Chief, Document Control Branch, IRM FROM:

Director, Division of Freedom of Information and Publications Services ADM

SUBJECT:

REVIEW 0F UTILITY EMERGEliCY PLAN DOCUMEllTATION The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.

h,jm.w.,-/ },L[c,wg Donnie H. Grimsley, Directo Division of Freedom of Information and Publications Services Office of Administration

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM l

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 94+22tfMtt-DOC.DATE: 91/12/16 NOTARIZED: NO DOCKET #

FACIL:50-266 Point Beach Nuclear Plant, Unit 1, Wisconsin Electric 05000266 50-301 Point Beach Nuclear Plant, Unit 2, Wisconsin Electric 05000301 AUTil.NAME AUTHOR AFFILIATION ZACH,J.J.

Wisconsin Electric Power Co.

RECIP.HAME RECIPIENT AFFILIATION R

Document Control Branch (Document Control Desk)

I

SUBJECT:

Forwards Central Files version of revised EPIPs, including Rev 13 to EPIP 1.1,

" Plant Operations Manager: Initial

~D' Response" & Rev 21 to EPIP 1.2,

" Event Classification."

Withheld.

3

!b h DISTRIBUTION CODE: AX45D COPIES RECEIVED:LTR l ENCL SIZE:

TITLE: Emergency Plan or Impleuenting Procedures (Propr.ictary)

/

NOTES:

A RECIPIENT COPIES RECIPIENT COPIES D

ID CODE /NAME LTTR ENCL

  • D CODE /NAME LTTR ENCL PD3-3 PD 1

1 SAMWORTH,B 1

1 D

INTERNAL: QE4/FIPS MID 1

1 AEOD/ DOA/IRB 1

1 g

NRR7DREP7PEPU9D 1

1 PEG FILE 01 1

1 R

I D

S

/

A D

D NOTE ~IO All " RIDS" RECIPli^:4TS:

S PLI ASL llEll' US 10 REDlti \\E\\Sil ! HiN1 C! Tlif. IXJCL'\\llNT CONTROI DIM.

ROO\\1 IN7 (EX1. 30% 'IO I 1.i\\11NA Ii )Ol'R N AN1E f~h0\\1 DISTRIBUTION LIS1S IOR DOCUN1ENTS T Ot DON'T NI:1 D' TOTAL MUMBER OF COPIES REQUIRED: LTTR 6

ENCL 6