ML20086U281
| ML20086U281 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/23/1984 |
| From: | Tucker H DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20086U252 | List: |
| References | |
| NUDOCS 8403070210 | |
| Download: ML20086U281 (2) | |
Text
y.
k.
s.
3 4k
- i-DUKE POWER GOMPANY:
1 P.O. BOX 33180 CHARLOTTE N.C. 28242 IIAI B. TUCKER utzpaoxn vuos rarerouwt (704) amS31 noos. man reosn,-
r l-January 23, 19843 7
- n g
,p 9 r
r-,
I-Cf h
Mr. James P. O'Reilly, Regional Administrritor U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 Re: RII:RW 50-413/83-17 50-414/83-16
Dear Mr. O'Reilly:
Please find attached a revised response to Violation 50-413/83-17-01 and 50-414/83-16-01 as identified in the above referenced inspection report.
Very truly yours, 0
M /$,qw N
w Hal B. Tucker LTP/php.
Attachment cc: NRC Resident Inspector Catawba Nuclear Station j
-Mr. Robert Guild, Esq.
Attorney-at-Law P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 8403070210 840224 PDR ADOCK 05000413 PDR
_h
~
~
m Catawba Nuclear Station Revised Response l'
' Violation No.150-413/83-17-Ol' 50-414/83-16-01 I
i In the Corrective Action section of the response, the following items are revised:
t--
Step 4) QA Procedure QA-140, Quality Assurance Inspector Certification,
-will be' revised to'specify that practical examinations will be administered by the Level III Examiner or a designated ~ Level II Inspector within the same discipline. This designation shall be in writing by the Level III eExaminer.
I$:
- Step 5) - ~ Full compliance will be achieved by February 10, 1984.
J
._________.__m_.__________.__________--___
_ _ _. _ _ _ _ _ _. _ _ - - - - _ - - --d